HARRIS CS (0912-72-333)

Items: 83

County: HARRIS
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-72-333
DBE Goal: N/A
Project: BR 2016(408)
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $916,217.98
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$916,217.98
$1,137,427.78
Over/Under Est: 24.14% $221,209.80
Over/Under Est: 29.01% $265,752.79
Amt Left: 3.92% $44,542.99
Over/Under Est: 43.51% $398,633.72
Amt Left: 15.6% $177,423.92
Delta: -11.24% -$132,880.93
$1,353,420.71
Over/Under Est: 47.72% $437,202.73
Amt Left: 18.99% $215,992.93
Delta: -2.93% -$38,569.01
Over/Under Est: 53.06% $486,183.33
Amt Left: 23.3% $264,973.53
Delta: -3.62% -$48,980.60

Bid Items & Bid Tabulations

83 Total 0 of 83
HARRIS  |  CS  |  HOUSTON  |  0912-72-333  |  05/01/2018  |  $916,217.98  |  BR 2016(408)  |  REPLACE BRIDGE AND APPROACHES  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NBG CONSTRUCTORS, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
MAIN LANE INDUSTRIES LTD.
ISI CONTRACTING, INC.
JOHN REED AND COMPANY, LLC
PREPARING ROW
STA 5.300 $2,000.000 $5,000.000 $15,000.000 $5,000.000 $800.000 $9,000.000
REMOVING CONC (PAV)
SY 651.000 $5.000 $7.000 $10.000 $4.000 $12.000 $4.000
REMOVING CONC (SIDEWALKS)
SY 55.000 $8.000 $8.000 $10.000 $5.000 $25.000 $5.000
REMOVING CONC (DRIVEWAYS)
SY 96.000 $11.000 $15.000 $10.000 $10.000 $15.000 $5.000
EXCAVATION (ROADWAY)
CY 1,051.000 $14.000 $15.000 $15.000 $30.000 $21.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 227.000 $12.000 $20.000 $20.000 $30.000 $35.000 $20.000
COMPOST MANUF TOPSOIL (4")
SY 1,682.000 $1.400 $1.000 $1.000 $1.000 $5.500 $1.000
BLOCK SODDING
SY 464.000 $5.500 $8.000 $5.000 $4.000 $8.500 $3.000
STRAW OR HAY MULCH
SY 1,682.000 $0.400 $2.500 $0.300 $0.200 $0.800 $0.500
BROADCAST SEED (PERM)(SPECIAL MIX)
SY 1,682.000 $0.300 $1.000 $0.500 $0.150 $0.300 $0.500
VEGETATIVE WATERING
MG 53.500 $15.000 $10.000 $20.000 $15.000 $14.000 $20.000
LIME TRT (EXST MATL) (6")
SY 544.000 $2.000 $4.000 $5.000 $18.000 $8.500 $6.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 7.350 $150.000 $500.000 $170.000 $160.000 $200.000 $150.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 248.000 $63.000 $100.000 $130.000 $120.000 $92.000 $98.000
D-GR HMA TY-D SAC-B PG70-22
TON 79.000 $74.000 $100.000 $140.000 $130.000 $180.000 $130.000
CONC PAV (JOINT REINF) (6")
SY 508.000 $65.000 $75.000 $60.000 $60.000 $80.000 $60.000
CEM STABIL BKFL
CY 25.000 $38.000 $100.000 $55.000 $50.000 $45.000 $60.000
TRENCH EXCAVATION PROTECTION
LF 100.000 $2.000 $1.000 $1.000 $5.000 $1.000 $2.000
DRILL SHAFT (18 IN)
LF 205.000 $130.000 $100.000 $190.000 $100.000 $74.000 $220.000
DRILL SHAFT (24 IN)
LF 452.000 $179.000 $200.000 $235.000 $175.000 $174.000 $350.000
DRILL SHAFT (30 IN)
LF 132.000 $200.000 $250.000 $295.000 $200.000 $200.000 $550.000
CL C CONC (ABUT)
CY 54.000 $918.000 $1,200.000 $1,050.000 $1,500.000 $1,200.000 $1,500.000
REINF CONC SLAB (BOX BEAM)
SF 1,648.200 $13.000 $18.000 $12.000 $34.000 $17.000 $20.000
REINF CONC SLAB (SLAB BEAM)
SF 2,180.500 $15.000 $14.000 $12.000 $34.000 $23.000 $15.000
BRIDGE SIDEWALK
SF 779.700 $10.000 $13.000 $9.500 $15.000 $9.000 $25.000
APPROACH SLAB
CY 181.300 $450.000 $600.000 $420.000 $500.000 $715.000 $450.000
SHEAR KEY
CY 9.300 $280.000 $300.000 $550.000 $400.000 $250.000 $200.000
PRESTR CONC BOX BEAM (4B20)
LF 245.936 $180.000 $255.000 $195.000 $200.000 $203.000 $310.000
PRESTR CONC BOX BEAM (5B20)
LF 122.960 $180.000 $255.000 $195.000 $300.000 $206.000 $310.000
PRESTR CONC SLAB BEAM (4SB15)
LF 99.060 $100.000 $230.000 $195.000 $200.000 $210.000 $310.000
PRESTR CONC SLAB BEAM (5SB15)
LF 346.710 $100.000 $230.000 $195.000 $300.000 $205.000 $310.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 103.000 $185.000 $150.000 $195.000 $150.000 $148.000 $70.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 154.000 $142.000 $150.000 $215.000 $150.000 $176.000 $75.000
RIPRAP (MOW STRIP)(4 IN)
CY 26.000 $560.000 $600.000 $450.000 $775.000 $630.000 $350.000
RAIL (TY T223)
LF 156.000 $69.000 $125.000 $90.000 $200.000 $99.000 $90.000
RAIL (TY C223)
LF 124.100 $85.000 $150.000 $175.000 $300.000 $110.000 $110.000
CMP (GAL STL 36 IN)
LF 94.000 $93.000 $100.000 $45.000 $70.000 $84.000 $80.000
MANH (COMPL)(PRM)(60IN)
EA 3.000 $4,400.000 $6,000.000 $6,200.000 $5,000.000 $5,200.000 $4,000.000
REMOV STR (MANHOLE)
EA 1.000 $1,500.000 $1,000.000 $500.000 $3,000.000 $990.000 $500.000
REMOV STR (PIPE)
LF 50.000 $35.000 $20.000 $10.000 $30.000 $20.000 $5.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $15,000.000 $15,000.000 $25,000.000 $12,000.000 $30,000.000 $50,000.000
MOBILIZATION
LS 2.000 $45,000.000 $50,000.000 $40,000.000 $65,000.000 $135,000.000 $70,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,000.000 $1,000.000 $2,500.000 $2,500.000 $1,600.000 $1,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 155.000 $35.000 $75.000 $50.000 $35.000 $66.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 155.000 $15.000 $30.000 $10.000 $15.000 $34.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 268.000 $34.000 $50.000 $35.000 $30.000 $41.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 268.000 $9.000 $20.000 $5.000 $10.000 $20.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,391.000 $2.800 $4.000 $4.250 $3.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,391.000 $0.900 $1.500 $1.000 $1.000 $1.500 $1.000
CONSTRUCTING DETOURS
SY 345.000 $63.000 $50.000 $65.000 $80.000 $88.000 $50.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 400.000 $28.000 $20.000 $65.000 $50.000 $65.000 $25.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $25.000 $20.000 $65.000 $50.000 $65.000 $25.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 320.000 $5.500 $4.000 $20.000 $10.000 $10.000 $11.660
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 160.000 $6.100 $4.000 $20.000 $10.000 $10.000 $2.920
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 400.000 $7.000 $12.000 $25.000 $15.000 $9.000 $14.800
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $7.000 $12.000 $25.000 $15.000 $9.000 $11.660
CONC CURB (MONO) (TY II)
LF 372.000 $4.000 $5.000 $6.000 $10.000 $4.000 $10.000
DRIVEWAYS (ACP)
SY 97.000 $35.000 $50.000 $45.000 $100.000 $76.000 $80.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 99.000 $70.000 $90.000 $85.000 $150.000 $95.000 $133.800
CONC SIDEWALKS (5")
SY 169.000 $65.000 $60.000 $65.000 $100.000 $55.000 $60.000
MTL W-BEAM GD FEN (TIM POST)
LF 375.000 $22.000 $25.000 $15.000 $19.500 $24.000 $23.250
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,567.000 $1,250.000 $1,650.000 $1,000.000 $1,700.000 $1,140.000
SHORT RADIUS
LF 30.000 $51.000 $35.000 $25.000 $29.610 $43.000 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,187.000 $1,500.000 $1,350.000 $1,130.000 $1,300.000 $950.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,343.000 $2,500.000 $1,400.000 $2,300.000 $2,700.000 $2,450.000
CONDT (PVC) (SCH 80) (3")
LF 70.000 $20.000 $75.000 $20.000 $40.000 $35.000 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $486.000 $600.000 $500.000 $600.000 $900.000 $800.000
REMOVE SM RD SN SUP&AM
EA 6.000 $200.000 $45.000 $450.000 $45.000 $88.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 24.000 $40.000 $50.000 $20.000 $50.000 $24.000 $52.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 12.000 $27.000 $50.000 $20.000 $50.000 $24.000 $59.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $48.000 $10.000 $20.000 $10.000 $6.000 $21.000
INSTL OM ASSM (OM-3L)(FLX)SRF
EA 4.000 $198.000 $205.000 $20.000 $205.000 $145.000 $214.000
INSTL OM ASSM (OM-3R)(FLX)SRF
EA 4.000 $130.000 $205.000 $20.000 $205.000 $145.000 $214.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 7.000 $20.000 $15.000 $20.000 $15.000 $15.000 $10.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,014.000 $0.300 $0.500 $1.500 $0.650 $0.250 $0.650
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,985.000 $0.600 $1.000 $2.000 $1.300 $0.600 $1.300
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 55.000 $6.000 $5.000 $9.000 $6.500 $6.400 $6.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 987.000 $0.600 $1.000 $2.000 $1.300 $0.700 $1.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 100.000 $0.700 $1.000 $10.000 $0.500 $0.750 $1.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 510.000 $0.700 $1.000 $2.500 $3.000 $0.100 $3.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,968.000 $0.350 $1.000 $3.000 $0.750 $2.250 $0.750
REFL PAV MRKR TY II-A-A
EA 32.000 $3.000 $5.000 $10.000 $4.000 $2.750 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 29.000 $59.000 $20.000 $100.000 $100.000 $100.000 $90.000
Totals: $916,217.980 $1,137,427.780 $1,181,970.770 $1,314,851.700 $1,353,420.718 $1,402,401.310