PREPARING ROW
|
AC
|
1.790
|
$10,000.000
|
$50,000.000
|
$97,000.000
|
$50,000.000
|
$15,000.000
|
|
|
PREPARING ROW (TREE)(10" TO 48" DIA)
|
EA
|
45.000
|
$500.000
|
$500.000
|
$750.000
|
$1,500.000
|
$1,500.000
|
|
|
PREPARING ROW (HAND CLEARING)
|
AC
|
0.960
|
$20,000.000
|
$8,300.000
|
$6,000.000
|
$40,000.000
|
$20,000.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
SY
|
895.000
|
$25.000
|
$8.500
|
$8.940
|
$7.000
|
$5.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
620.000
|
$25.000
|
$5.500
|
$2.000
|
$5.000
|
$4.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
103.000
|
$7.800
|
$5.000
|
$2.000
|
$3.000
|
$2.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
17,421.000
|
$15.000
|
$20.000
|
$17.500
|
$1.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
12,067.000
|
$10.000
|
$6.000
|
$4.500
|
$1.000
|
$11.000
|
|
|
EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPR)
|
CY
|
51.000
|
$40.000
|
$35.000
|
$150.000
|
$70.000
|
$76.000
|
|
|
FURNISH AND PLACE TOPSOIL (5")
|
SY
|
48,026.000
|
$1.250
|
$3.000
|
$1.500
|
$2.000
|
$5.000
|
|
|
BLOCK SODDING
|
SY
|
11,777.000
|
$5.000
|
$3.500
|
$4.100
|
$4.100
|
$3.000
|
|
|
BROADCAST SEED (PERM)(SPECIAL MIX)
|
SY
|
34,536.000
|
$3.000
|
$0.250
|
$0.300
|
$0.300
|
$0.180
|
|
|
CELL FBR MLCH SEED(PERM)(SPECIAL MIX)
|
SY
|
36,249.000
|
$1.000
|
$0.500
|
$0.490
|
$0.500
|
$0.400
|
|
|
FERTILIZER
|
AC
|
17.000
|
$700.000
|
$1,200.000
|
$692.320
|
$700.000
|
$300.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,040.000
|
$17.000
|
$30.000
|
$20.000
|
$39.000
|
$50.000
|
|
|
WILDFLOWER SEEDING
|
AC
|
0.350
|
$13,125.000
|
$2,750.000
|
$3,062.710
|
$3,100.000
|
$4,500.000
|
|
|
PLANT MATERIAL (1-GAL)
|
EA
|
3,759.000
|
$30.000
|
$11.000
|
$9.140
|
$9.200
|
$12.000
|
|
|
PLANT MATERIAL (3-GAL)
|
EA
|
128.000
|
$50.000
|
$24.000
|
$15.080
|
$15.200
|
$20.000
|
|
|
PLANT MATERIAL (5-GAL)
|
EA
|
132.000
|
$80.000
|
$40.000
|
$14.980
|
$15.000
|
$35.000
|
|
|
MULCH
|
SY
|
1,047.000
|
$10.000
|
$80.000
|
$23.950
|
$24.000
|
$2.700
|
|
|
PLANT MATERIAL (10 GAL) (TREE)
|
EA
|
19.000
|
$180.000
|
$240.000
|
$96.960
|
$100.000
|
$120.000
|
|
|
PLANT MATERIAL (15 GAL) (TREE)
|
EA
|
170.000
|
$200.000
|
$300.000
|
$175.170
|
$176.000
|
$130.000
|
|
|
PLANT MATERIAL (30 GAL) (TREE)
|
EA
|
176.000
|
$240.000
|
$325.000
|
$360.450
|
$365.000
|
$250.000
|
|
|
LANDSCAPE EDGE (TYPE I)
|
LF
|
218.000
|
$25.000
|
$25.000
|
$21.000
|
$12.000
|
$18.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
210.000
|
$18.000
|
$55.000
|
$35.000
|
$27.000
|
$30.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
6,526.000
|
$8.000
|
$2.500
|
$10.000
|
$5.000
|
$6.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
127.700
|
$185.000
|
$200.000
|
$170.000
|
$175.000
|
$220.000
|
|
|
FLY ASH (CLASS FS)
|
TON
|
159.300
|
$190.000
|
$185.000
|
$120.000
|
$80.000
|
$210.000
|
|
|
LFA TREAT SUBGRADE (6")
|
SY
|
8,554.000
|
$6.000
|
$3.000
|
$10.000
|
$5.000
|
$4.500
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
176.000
|
$3.000
|
$4.000
|
$3.500
|
$10.000
|
$4.500
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
4.000
|
$128.000
|
$100.000
|
$100.000
|
$200.000
|
$100.000
|
|
|
LRA PAV TY-I GR-A
|
TON
|
38.000
|
$400.000
|
$175.000
|
$160.000
|
$250.000
|
$225.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
44.200
|
$75.000
|
$100.000
|
$300.000
|
$300.000
|
$175.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
401.000
|
$2.000
|
$3.000
|
$8.000
|
$15.000
|
$16.500
|
|
|
CEM STABIL BKFL
|
CY
|
737.000
|
$70.000
|
$65.000
|
$35.000
|
$60.000
|
$65.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
6,700.000
|
$15.000
|
$10.000
|
$16.000
|
$24.000
|
$25.000
|
|
|
TEMPORARY SPL SHORING (SOIL NAIL)
|
SF
|
298.000
|
$35.000
|
$40.000
|
$30.000
|
$15.000
|
$19.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
270.000
|
$20.000
|
$27.000
|
$44.000
|
$70.000
|
$28.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
280.000
|
$90.000
|
$120.000
|
$75.000
|
$150.000
|
$111.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
300.000
|
$150.000
|
$250.000
|
$180.000
|
$350.000
|
$265.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
80.000
|
$205.000
|
$300.000
|
$350.000
|
$600.000
|
$541.000
|
|
|
CL C CONC (ABUT)
|
CY
|
81.800
|
$1,200.000
|
$800.000
|
$1,200.000
|
$1,500.000
|
$1,100.000
|
|
|
CL C CONC (CAP)
|
CY
|
20.200
|
$925.000
|
$900.000
|
$1,200.000
|
$1,200.000
|
$1,800.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
20.700
|
$925.000
|
$1,000.000
|
$2,000.000
|
$1,200.000
|
$1,750.000
|
|
|
CL C CONC (INLET)
|
CY
|
38.000
|
$420.000
|
$650.000
|
$1,000.000
|
$750.000
|
$820.000
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
2,432.000
|
$50.000
|
$23.000
|
$51.000
|
$60.000
|
$49.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
6,302.000
|
$65.000
|
$60.000
|
$80.000
|
$100.000
|
$99.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
298.000
|
$50.000
|
$65.000
|
$85.000
|
$100.000
|
$53.000
|
|
|
PNEUMATICALLY PLACED CONC (ENCASEMENT)
|
SF
|
425.000
|
$22.000
|
$25.000
|
$7.000
|
$8.000
|
$9.000
|
|
|
PNEUMATICALLY PLACED CONC (REPAIR)
|
CF
|
261.000
|
$25.000
|
$60.000
|
$17.000
|
$10.000
|
$23.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
305.000
|
$440.000
|
$390.000
|
$350.000
|
$580.000
|
$480.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
30.000
|
$200.000
|
$500.000
|
$550.000
|
$500.000
|
$618.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
50.000
|
$100.000
|
$100.000
|
$150.000
|
$130.000
|
$145.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
3,452.000
|
$100.000
|
$130.000
|
$130.000
|
$170.000
|
$145.000
|
|
|
CONCRETE OVERLAY (2 IN)
|
SY
|
153.000
|
$201.000
|
$50.000
|
$60.000
|
$20.000
|
$1.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
81,161.000
|
$2.700
|
$4.000
|
$2.300
|
$5.500
|
$4.500
|
|
|
RAIL (TY C221)
|
LF
|
215.000
|
$99.000
|
$100.000
|
$160.000
|
$350.000
|
$140.000
|
|
|
RAIL (TY PR11)
|
LF
|
560.000
|
$105.000
|
$95.000
|
$85.000
|
$110.000
|
$175.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
593.000
|
$95.000
|
$80.000
|
$75.000
|
$120.000
|
$180.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
282.000
|
$110.000
|
$85.000
|
$100.000
|
$120.000
|
$155.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
44.000
|
$120.000
|
$95.000
|
$115.000
|
$130.000
|
$200.000
|
|
|
CONC BOX CULV (12 FT X 10 FT)
|
LF
|
44.000
|
$1,000.000
|
$1,300.000
|
$2,000.000
|
$2,200.000
|
$1,650.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
99.000
|
$120.000
|
$95.000
|
$150.000
|
$85.000
|
$150.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
112.000
|
$190.000
|
$200.000
|
$175.000
|
$220.000
|
$250.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
3.000
|
$3,500.000
|
$3,200.000
|
$3,000.000
|
$4,500.000
|
$4,350.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
5.000
|
$4,000.000
|
$6,400.000
|
$4,400.000
|
$7,000.000
|
$5,700.000
|
|
|
WINGWALL (PW - 1) (HW=16 FT)
|
EA
|
2.000
|
$60,000.000
|
$39,000.000
|
$50,000.000
|
$110,000.000
|
$81,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,000.000
|
$1,300.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
|
|
SET (TY II) (36 IN) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$2,700.000
|
$3,750.000
|
$2,500.000
|
$2,900.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$3,810.000
|
$3,500.000
|
$6,500.000
|
$6,700.000
|
$6,200.000
|
|
|
GRATE AND FRAME(BRIDGE DRAIN)(2 GRATES)
|
EA
|
2.000
|
$2,000.000
|
$1,200.000
|
$3,500.000
|
$500.000
|
$5,500.000
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
20.000
|
$1,700.000
|
$700.000
|
$230.000
|
$150.000
|
$125.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$1,050.000
|
$300.000
|
$550.000
|
$500.000
|
$2,500.000
|
|
|
PIPE (PVC) (SCH 40) (4 IN)
|
LF
|
160.000
|
$35.000
|
$40.000
|
$60.000
|
$35.000
|
$28.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
55.000
|
$40.000
|
$50.000
|
$90.000
|
$40.000
|
$35.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$1,100.000
|
$600.000
|
$500.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
295.000
|
$15.000
|
$35.000
|
$35.000
|
$50.000
|
$9.000
|
|
|
REMOV STR (PICNIC AREA)
|
EA
|
2.000
|
$1,000.000
|
$600.000
|
$60.000
|
$800.000
|
$700.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
303.000
|
$8.000
|
$19.000
|
$4.000
|
$3.000
|
$9.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
141.000
|
$35.000
|
$25.000
|
$15.000
|
$22.000
|
$12.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$540,000.000
|
$510,000.000
|
$400,000.000
|
$640,000.000
|
$310,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$900.000
|
$500.000
|
$1,500.000
|
$1,000.000
|
$3,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
546.000
|
$20.000
|
$35.000
|
$30.000
|
$45.000
|
$28.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
546.000
|
$14.000
|
$10.000
|
$8.000
|
$10.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
12,787.000
|
$2.000
|
$2.000
|
$3.000
|
$3.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
12,787.000
|
$1.000
|
$0.500
|
$0.750
|
$0.700
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
706.000
|
$5.000
|
$3.000
|
$2.250
|
$6.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
706.000
|
$1.500
|
$0.500
|
$1.000
|
$0.700
|
$1.000
|
|
|
COLORED TEXTURED CONC (6")
|
SY
|
306.000
|
$90.000
|
$75.000
|
$120.000
|
$120.000
|
$175.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
163.000
|
$40.000
|
$45.000
|
$80.000
|
$20.000
|
$100.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
152.000
|
$25.000
|
$25.000
|
$30.000
|
$8.000
|
$19.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
13,328.000
|
$71.000
|
$67.000
|
$72.000
|
$45.000
|
$76.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$2,460.000
|
$1,700.000
|
$2,800.000
|
$2,000.000
|
$2,800.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$1,650.000
|
$1,700.000
|
$2,600.000
|
$2,500.000
|
$3,200.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
37.500
|
$20.000
|
$25.000
|
$60.000
|
$50.000
|
$65.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$750.000
|
$2,500.000
|
$950.000
|
$3,800.000
|
$3,000.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,800.000
|
$2,500.000
|
$2,200.000
|
$3,000.000
|
$650.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,350.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$3,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
23.000
|
$5.000
|
$8.000
|
$10.000
|
$5.000
|
$5.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
36.000
|
$8.000
|
$5.000
|
$4.000
|
$3.000
|
$10.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
329.000
|
$80.000
|
$70.000
|
$22.000
|
$25.000
|
$35.000
|
|
|
CHN LNK FNCE(PVC-COATD)(8' MESH)(INSTL)
|
LF
|
321.000
|
$85.000
|
$85.000
|
$30.000
|
$45.000
|
$40.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
2.000
|
$475.000
|
$340.000
|
$365.630
|
$260.000
|
$300.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
756.000
|
$0.500
|
$4.000
|
$3.000
|
$4.000
|
$3.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
596.000
|
$0.500
|
$4.000
|
$3.000
|
$4.000
|
$3.500
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
1.000
|
$1,000.000
|
$650.000
|
$280.000
|
$100.000
|
$1,600.000
|
|
|
INSTL DOWN GUY W/GUARD
|
EA
|
2.000
|
$100.000
|
$400.000
|
$500.000
|
$500.000
|
$1,200.000
|
|
|
REPLACE DOWN GUY W/GUARD
|
EA
|
2.000
|
$5,000.000
|
$500.000
|
$500.000
|
$500.000
|
$1,200.000
|
|
|
LANDSCAPE AMENITY
|
EA
|
4.000
|
$5,000.000
|
$2,500.000
|
$8,000.000
|
$3,500.000
|
$2,200.000
|
|
|
LANDSCAPE AMENITY (TY 1)
|
EA
|
6.000
|
$10,000.000
|
$2,600.000
|
$14,000.000
|
$4,000.000
|
$1,275.000
|
|
|
LANDSCAPE AMENITY (TY 2)
|
EA
|
6.000
|
$1,250.000
|
$1,000.000
|
$1,500.000
|
$1,600.000
|
$2,300.000
|
|
|
LANDSCAPE AMENITY (TY 3)
|
EA
|
6.000
|
$1,250.000
|
$1,000.000
|
$1,500.000
|
$1,600.000
|
$2,300.000
|
|
|
LANDSCAPE AMENITY (TY 4)
|
EA
|
12.000
|
$3,500.000
|
$3,000.000
|
$6,000.000
|
$9,000.000
|
$6,400.000
|
|
|
LANDSCAPE AMENITY (TY 5)
|
EA
|
1.000
|
$30,000.000
|
$30,000.000
|
$45,000.000
|
$40,000.000
|
$19,100.000
|
|
|
LANDSCAPE AMENITY (TY 6)
|
EA
|
3.000
|
$6,000.000
|
$12,000.000
|
$28,000.000
|
$28,000.000
|
$12,100.000
|
|
|
LANDSCAPE AMENITY (TY 7)
|
EA
|
4.000
|
$3,000.000
|
$2,000.000
|
$3,500.000
|
$3,100.000
|
$3,600.000
|
|
|
LANDSCAPE AMENITY (TY 8)
|
EA
|
1.000
|
$8,000.000
|
$30,000.000
|
$22,000.000
|
$12,000.000
|
$35,600.000
|
|
|
LANDSCAPE AMENITY (TY 9)
|
EA
|
3.000
|
$12,000.000
|
$12,000.000
|
$7,800.000
|
$4,500.000
|
$7,000.000
|
|
|
LANDSCAPE AMENITY (TY 10)
|
EA
|
12.000
|
$600.000
|
$2,000.000
|
$5,000.000
|
$3,000.000
|
$3,100.000
|
|
|
LANDSCAPE AMENITY (TY 11)
|
EA
|
3.000
|
$1,750.000
|
$5,000.000
|
$4,000.000
|
$5,500.000
|
$8,300.000
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE IV)
|
SY
|
634.000
|
$30.000
|
$4.500
|
$0.270
|
$0.270
|
$3.500
|
|
|
PREFAB PED STL TRUSS BRG SPAN (38 FT)
|
EA
|
2.000
|
$70,480.000
|
$55,000.000
|
$46,000.000
|
$80,000.000
|
$79,000.000
|
|
|
PREFAB PED STL TRUSS BRG SPAN (74 FT)
|
EA
|
1.000
|
$109,290.000
|
$100,000.000
|
$82,000.000
|
$130,000.000
|
$138,000.000
|
|
|
PREFAB PED STL TRUSS BRG SPAN (100 FT)
|
EA
|
1.000
|
$208,500.000
|
$150,000.000
|
$130,000.000
|
$190,000.000
|
$213,000.000
|
|
|
RETROFIT DET WARN SURF(CAST IN PLACE)
|
SF
|
49.000
|
$25.000
|
$40.000
|
$60.000
|
$8.000
|
$50.000
|
|
|
WHEEL STOPS
|
EA
|
10.000
|
$500.000
|
$350.000
|
$200.000
|
$75.000
|
$500.000
|
|
|
REMOVABLE BOLLARD
|
EA
|
4.000
|
$1,210.000
|
$650.000
|
$1,500.000
|
$1,000.000
|
$1,900.000
|
|
|
ADJUSTING METER BOX
|
EA
|
1.000
|
$500.000
|
$500.000
|
$200.000
|
$400.000
|
$948.100
|
|
Totals: |
$5,817,462.350
|
$5,646,450.500
|
$5,899,279.538
|
$6,492,517.680
|
$6,670,003.580
|