Show Job Controls
Bid Cobra

HARRIS CS (0912-72-313)

Items: 166

County: HARRIS
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-72-313
DBE Goal: N/A
Project: STP 1702(285)
Guaranty: N/A
Time: 205 WORKING DAYS
Engineer's Estimate: $5,810,196.65
Date: 06/06/2017 (9 years ago)
Contract Number: N/A
Type: RECONSTRUCT ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,810,196.65
$5,787,450.16
Over/Under Est: -0.39% -$22,746.49
Over/Under Est: 1.47% $85,496.25
Amt Left: 1.87% $108,242.74
Over/Under Est: 2.01% $116,800.85
Amt Left: 2.41% $139,547.34
Delta: -0.53% -$31,304.60
Over/Under Est: 6.63% $384,984.43
Amt Left: 7.05% $407,730.92
Delta: -4.52% -$268,183.58
Over/Under Est: 17.37% $1,009,088.66
Amt Left: 17.83% $1,031,835.15
Delta: -10.07% -$624,104.23

Bid Items & Bid Tabulations

166 Total 0 of 166
HARRIS  |  CS  |  HOUSTON  |  0912-72-313  |  06/06/2017  |  $5,810,196.65  |  STP 1702(285)  |  RECON ROADWAY  |  205 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HARPER BROTHERS CONSTRUCTION LLC
MAIN LANE INDUSTRIES LTD.
TOTAL CONTRACTING LIMITED
SER CONSTRUCTION PARTNERS, LLC
HASSELL CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 38.700 $1,500.000 $1,500.000 $10,000.000 $2,500.000 $3,022.600 $7,800.000
REMOVING CONC (PAV)
SY 15,332.000 $5.500 $3.000 $2.000 $3.000 $4.800 $4.000
REMOVING CONC (MEDIANS)
SY 40.000 $8.000 $25.000 $2.000 $3.000 $4.900 $3.000
REMOVING CONC (DRIVEWAYS)
SY 942.000 $15.000 $5.000 $2.000 $3.000 $4.300 $3.000
REMOVING CONC (CURB AND GUTTER)
LF 241.000 $3.500 $1.000 $2.000 $3.000 $7.800 $2.000
REMOVING CONC (RETAINING WALLS)
SY 69.000 $20.000 $35.000 $20.000 $15.000 $10.700 $6.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 1,964.000 $10.000 $4.000 $2.000 $3.000 $3.500 $3.000
REMOVING CONC (PAVERS)
SY 32.000 $15.000 $25.000 $2.000 $15.000 $14.600 $11.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 1,538.000 $5.000 $3.000 $2.000 $3.000 $4.500 $3.650
EXCAVATION (ROADWAY)
CY 2,086.000 $9.000 $10.000 $50.000 $15.000 $18.100 $42.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 339.000 $6.000 $10.000 $10.000 $25.000 $29.200 $37.000
BLOCK SODDING
SY 163.000 $3.000 $6.000 $5.000 $5.000 $5.800 $4.130
IRRIGATION SYSTEM
LS 1.000 $125,000.000 $124,000.000 $150,000.000 $200,000.000 $174,000.000 $251,450.000
PLANT MATERIAL (1-GAL)
EA 8,335.000 $8.500 $8.000 $10.000 $12.000 $11.900 $6.500
PLANT MATERIAL (3-GAL)
EA 1,818.000 $22.000 $16.000 $20.000 $27.000 $26.400 $15.000
MULCH
SY 2,054.000 $4.500 $7.000 $40.000 $51.000 $54.000 $3.110
PLANT BED PREPARATION
SY 2,054.000 $2.500 $9.000 $5.000 $7.000 $7.800 $1.000
PLANT MATERIAL (30 GAL) (TREE)
EA 64.000 $250.000 $550.000 $350.000 $410.000 $390.000 $355.000
PLANT MATERIAL (100 GAL) (TREE)
EA 18.000 $800.000 $1,700.000 $2,000.000 $2,000.000 $2,160.000 $931.000
PLANT MATERIAL (200 GAL) (TREE)
EA 70.000 $1,350.000 $2,500.000 $3,000.000 $2,900.000 $3,360.000 $2,500.000
PLANT SOIL MIX (TY 1)
CY 710.000 $65.000 $40.000 $60.000 $70.000 $78.000 $121.000
PLANT SOIL MIX (TY 2)
CY 119.000 $140.000 $70.000 $200.000 $250.000 $270.000 $121.000
VEGETATION BARRIER (TREE ROOT)
SY 404.000 $75.000 $12.000 $20.000 $21.000 $22.800 $80.000
PLANT MAINTENANCE
MO 12.000 $4,000.000 $4,400.000 $1,000.000 $5,500.000 $6,000.000 $13,843.000
IRRIGATION SYSTEM OPER AND MAINT
MO 12.000 $1,500.000 $1,350.000 $1,000.000 $2,700.000 $3,000.000 $4,007.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 201.000 $165.000 $155.000 $190.000 $175.000 $182.400 $155.000
LIME TRT (EXST MATL)(8")
SY 10,808.000 $5.000 $6.000 $4.000 $4.000 $4.700 $4.100
CONC PAV (JOINT REINF) (9")
SY 10,115.000 $51.250 $71.000 $50.000 $60.000 $60.600 $101.000
CONC PVMT (CONT REINF)(FAST TRK)(12")
SY 4,574.000 $125.000 $111.000 $70.000 $90.000 $92.000 $80.000
STRUCT EXCAV
CY 2,382.000 $10.000 $13.000 $1.000 $30.000 $32.300 $11.000
CEM STABIL BKFL
CY 4,859.500 $60.000 $35.000 $35.000 $30.000 $52.300 $40.000
CUT & RESTORING PAV
SY 751.000 $105.000 $50.000 $100.000 $75.000 $109.600 $90.000
FLOWABLE BACKFILL
CY 117.000 $158.000 $185.000 $120.000 $25.000 $155.000 $110.000
TRENCH EXCAVATION PROTECTION
LF 5,075.000 $2.000 $1.000 $1.000 $3.000 $0.200 $2.000
DRILL SHAFT (RDWY ILL POLE) (24 IN)
LF 594.000 $140.000 $125.000 $130.000 $135.000 $150.000 $300.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 1,060.000 $9.250 $15.000 $19.000 $2.000 $16.700 $12.000
RC PIPE (CL III)(18 IN)
LF 2.010 $53.000 $1,275.000 $150.000 $100.000 $130.100 $530.000
RC PIPE (CL III)(24 IN)
LF 1,539.660 $55.000 $95.000 $100.000 $125.000 $90.200 $58.000
RC PIPE (CL III)(30 IN)
LF 233.500 $60.000 $100.000 $120.000 $150.000 $92.400 $84.000
RC PIPE (CL III)(36 IN)
LF 470.320 $75.000 $110.000 $300.000 $200.000 $119.000 $78.000
MANH (COMPL)(PRM)(48IN)
EA 12.000 $3,500.000 $4,000.000 $5,000.000 $4,000.000 $2,317.900 $3,000.000
MANH (COMPL)(PRM)(60IN)
EA 3.000 $4,000.000 $5,000.000 $8,000.000 $5,000.000 $3,023.500 $3,200.000
JCTBOX(COMPL)(PJB)(3FTX5FT)
EA 1.000 $4,300.000 $12,000.000 $12,000.000 $10,000.000 $5,375.300 $5,600.000
INLET (COMPL)(PSL)(RH)(3FTX3FT)
EA 8.000 $3,500.000 $4,000.000 $3,000.000 $2,500.000 $2,035.400 $2,300.000
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 1.000 $5,310.000 $4,000.000 $3,000.000 $2,500.000 $1,865.300 $2,500.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $3,500.000 $5,000.000 $3,500.000 $2,500.000 $2,224.400 $2,900.000
INLET (COMPL)(CURB)(TY C)
EA 32.000 $2,700.000 $4,500.000 $3,000.000 $3,000.000 $2,568.800 $2,800.000
INLET (COMPL)(EXT TY C)
EA 6.000 $1,100.000 $1,100.000 $1,000.000 $2,500.000 $1,130.400 $600.000
ADJUSTING MANHOLES
EA 15.000 $600.000 $360.000 $500.000 $250.000 $563.800 $1,100.000
ADJUSTING MANHOLES(CAP)
EA 4.000 $1,180.000 $750.000 $500.000 $250.000 $563.800 $800.000
REMOV STR (INLET)
EA 24.000 $400.000 $300.000 $500.000 $150.000 $369.000 $1,300.000
REMOV STR (MANHOLE)
EA 3.000 $800.000 $450.000 $500.000 $150.000 $492.000 $1,300.000
REMOV STR (PIPE)
LF 871.000 $20.000 $5.000 $2.000 $5.000 $18.400 $37.000
MOBILIZATION
LS 1.000 $550,453.890 $510,000.000 $510,000.000 $300,000.000 $505,000.000 $652,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $2,500.000 $7,500.000 $25,000.000 $15,000.000 $10,830.000 $3,600.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,455.000 $2.500 $2.000 $1.500 $5.000 $1.700 $2.130
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,455.000 $0.850 $0.500 $0.500 $5.000 $0.300 $0.250
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 518.000 $5.250 $4.000 $4.000 $10.000 $3.600 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 518.000 $0.550 $1.000 $0.500 $10.000 $0.500 $0.250
LANDSCAPE PAVERS
SY 533.000 $60.000 $135.000 $175.000 $190.000 $264.100 $76.000
CONC CURB (MONO) (TY II)
LF 4,340.000 $3.500 $2.000 $4.000 $10.000 $3.700 $3.750
CONC CURB (LANDSCAPE)
LF 1,037.000 $15.000 $30.000 $15.000 $10.000 $31.500 $8.500
CONCRETE CURB (SPECIAL)
LF 762.000 $10.000 $40.000 $16.000 $25.000 $25.300 $15.000
DRIVEWAYS (CONC)
SY 21.000 $58.000 $360.000 $50.000 $70.000 $53.200 $56.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 1,739.000 $78.500 $95.000 $50.000 $75.000 $55.600 $61.000
CONC SIDEWALKS (5")
SY 4,357.000 $55.000 $75.000 $40.000 $50.000 $59.500 $55.000
CURB RAMPS (TY 7)
EA 18.000 $1,800.000 $1,500.000 $1,200.000 $2,500.000 $1,391.000 $1,225.000
CURB RAMPS (TY 10)
EA 2.000 $1,500.000 $2,100.000 $1,400.000 $2,500.000 $1,723.800 $1,450.000
CONCRETE MEDIAN (NOSE)
SY 34.000 $80.000 $75.000 $50.000 $55.000 $67.900 $77.000
CONDT (PVC) (SCH 40) (2")
LF 1,975.000 $7.150 $7.850 $8.000 $9.000 $9.400 $8.500
CONDT (PVC) (SCH 80) (1")
LF 160.000 $10.000 $11.000 $11.000 $11.000 $12.000 $8.000
CONDT (PVC) (SCH 80) (2")
LF 5,115.000 $7.000 $13.000 $8.000 $9.000 $9.500 $8.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 809.000 $20.000 $10.250 $11.000 $11.000 $12.300 $13.250
CONDT (PVC) (SCH 80) (3")
LF 740.000 $13.600 $12.500 $13.000 $13.000 $15.000 $9.250
CONDT (PVC) (SCH 80) (3") (BORE)
LF 280.000 $22.000 $15.000 $16.000 $16.000 $18.000 $14.000
CONDT (PVC) (SCH 80) (4")
LF 70.000 $13.000 $22.250 $23.000 $24.000 $26.700 $13.500
CONDT (PVC) (SCH 80) (4") (BORE)
LF 200.000 $38.000 $16.750 $18.000 $18.000 $19.500 $15.250
CONDT (RM) (2")
LF 100.000 $28.000 $25.000 $26.000 $28.000 $30.000 $25.750
ELEC CONDR (NO.8) BARE
LF 6,428.000 $1.000 $1.700 $1.500 $1.600 $1.700 $1.300
ELEC CONDR (NO.8) INSULATED
LF 6,812.000 $1.300 $1.800 $1.500 $1.600 $1.700 $1.500
ELEC CONDR (NO.4) INSULATED
LF 1,070.000 $2.000 $2.000 $2.000 $2.000 $2.200 $1.900
TRAY CABLE (3 CONDR) (12 AWG)
LF 830.000 $1.200 $1.500 $2.000 $2.000 $2.200 $2.000
TRAY CABLE (3 CONDR) (10 AWG)
LF 2,640.000 $1.150 $1.700 $2.000 $2.000 $2.200 $2.500
GROUND BOX TY D (162922)
EA 12.000 $650.000 $695.000 $750.000 $720.000 $834.000 $1,650.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $4,500.000 $4,725.000 $5,000.000 $5,000.000 $5,670.000 $4,700.000
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 2.000 $4,500.000 $4,250.000 $5,000.000 $5,000.000 $5,100.000 $5,400.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 11.000 $390.000 $440.000 $400.000 $300.000 $132.000 $440.000
REMOVE SM RD SN SUP&AM
EA 34.000 $70.000 $98.000 $100.000 $100.000 $96.000 $98.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 360.000 $0.750 $0.500 $0.700 $2.000 $1.200 $0.630
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 98.000 $2.500 $1.500 $1.500 $3.000 $2.400 $1.700
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,956.000 $0.700 $0.600 $0.600 $1.000 $0.800 $0.600
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 155.000 $11.000 $8.000 $3.000 $10.000 $7.200 $8.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,328.000 $0.700 $0.500 $0.600 $1.000 $0.800 $0.560
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 808.000 $0.700 $1.500 $1.000 $2.000 $1.200 $1.500
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 714.000 $2.000 $2.500 $3.000 $5.000 $3.600 $2.400
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 277.000 $5.000 $5.000 $6.000 $10.000 $7.200 $5.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 22.000 $110.000 $120.000 $110.000 $200.000 $144.000 $120.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 7.000 $125.000 $130.000 $130.000 $200.000 $144.000 $130.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 439.000 $0.250 $0.500 $0.200 $1.000 $0.300 $0.460
REFL PAV MRK TY II (W) 8" (SLD)
LF 808.000 $0.400 $0.750 $0.400 $2.000 $0.600 $0.750
REFL PAV MRK TY II (W) 12" (SLD)
LF 714.000 $1.250 $1.000 $0.500 $2.000 $1.200 $0.970
REFL PAV MRK TY II (W) 24" (SLD)
LF 277.000 $2.000 $1.500 $1.000 $10.000 $2.400 $1.400
REFL PAV MRK TY II (W) (ARROW)
EA 22.000 $45.000 $110.000 $70.000 $50.000 $48.000 $110.000
REFL PAV MRK TY II (W) (WORD)
EA 7.000 $55.000 $110.000 $70.000 $50.000 $48.000 $110.000
REFL PAV MRK TY II (Y) 4" (BRK)
LF 371.000 $0.150 $0.500 $0.200 $1.000 $0.300 $0.460
REFL PAV MRK TY II (Y) 4" (SLD)
LF 6,883.000 $0.150 $0.500 $0.200 $1.000 $0.200 $0.460
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 439.000 $0.600 $0.750 $0.400 $1.000 $0.700 $0.730
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 371.000 $0.880 $0.750 $0.400 $1.000 $0.800 $0.730
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,883.000 $0.600 $0.700 $0.400 $1.000 $0.700 $0.730
REFL PAV MRKR TY I-C
EA 40.000 $4.150 $4.900 $5.000 $7.000 $6.000 $4.900
REFL PAV MRKR TY II-A-A
EA 98.000 $3.000 $4.900 $5.000 $7.000 $6.000 $4.900
ELIM EXT PAV MRK & MRKS (24")
LF 38.000 $2.000 $6.500 $2.000 $7.000 $6.000 $6.500
PAV SURF PREP FOR MRK (4")
LF 7,693.000 $0.100 $0.020 $0.100 $1.000 $0.100 $0.020
PAV SURF PREP FOR MRK (8")
LF 808.000 $0.150 $0.050 $0.100 $1.000 $0.100 $0.050
PAV SURF PREP FOR MRK (12")
LF 714.000 $0.400 $0.060 $0.200 $1.000 $0.100 $0.060
PAV SURF PREP FOR MRK (24")
LF 277.000 $0.850 $0.130 $0.300 $1.000 $0.300 $0.130
PAV SURF PREP FOR MRK (ARROW)
EA 22.000 $8.500 $7.900 $5.000 $10.000 $6.000 $7.900
PAV SURF PREP FOR MRK (WORD)
EA 7.000 $15.000 $7.900 $5.000 $10.000 $6.000 $7.900
INSTALL HWY TRF SIG (ISOLATED)
EA 2.000 $140,000.000 $100,000.000 $120,000.000 $120,000.000 $127,500.000 $201,000.000
VEH SIG SEC (12")LED(GRN)
EA 18.000 $250.000 $210.000 $200.000 $230.000 $252.000 $175.000
VEH SIG SEC (12")LED(GRN ARW)
EA 12.000 $250.000 $210.000 $200.000 $230.000 $252.000 $175.000
VEH SIG SEC (12")LED(YEL)
EA 18.000 $250.000 $210.000 $200.000 $230.000 $252.000 $175.000
VEH SIG SEC (12")LED(YEL ARW)
EA 24.000 $250.000 $210.000 $200.000 $230.000 $252.000 $175.000
VEH SIG SEC (12")LED(RED)
EA 18.000 $250.000 $210.000 $200.000 $230.000 $252.000 $175.000
VEH SIG SEC (12")LED(RED ARW)
EA 12.000 $250.000 $210.000 $200.000 $230.000 $252.000 $175.000
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $500.000 $465.000 $500.000 $500.000 $558.000 $380.000
BACK PLATE (12")(3 SEC)
EA 18.000 $85.000 $120.000 $130.000 $140.000 $144.000 $92.000
BACK PLATE (12")(4 SEC)
EA 12.000 $100.000 $135.000 $150.000 $150.000 $162.000 $110.000
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 2,280.000 $1.350 $1.050 $1.000 $1.200 $1.300 $1.600
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,460.000 $1.600 $1.300 $1.500 $1.500 $1.600 $1.750
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 4,220.000 $1.850 $1.650 $2.000 $1.800 $2.000 $1.850
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 7,400.000 $1.100 $1.050 $1.000 $1.200 $1.300 $1.450
PED POLE ASSEMBLY
EA 8.000 $1,700.000 $2,000.000 $2,000.000 $2,200.000 $2,400.000 $2,500.000
PED DETECT PUSH BUTTON (APS)
EA 16.000 $850.000 $635.000 $700.000 $700.000 $762.000 $900.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,500.000 $3,050.000 $3,500.000 $3,300.000 $3,660.000 $4,100.000
TREE REMOVAL (4" - 12" DIA)
EA 22.000 $200.000 $200.000 $300.000 $550.000 $480.000 $2,000.000
TREE REMOVAL (12" - 18" DIA)
EA 11.000 $400.000 $500.000 $500.000 $710.000 $720.000 $3,000.000
TREE REMOVAL (24" - 30" DIA)
EA 1.000 $3,000.000 $850.000 $1,000.000 $1,100.000 $1,200.000 $5,000.000
LANDSCAPE AMENITY (TY 1)
EA 12.000 $3,300.000 $2,500.000 $2,000.000 $3,200.000 $2,739.900 $2,500.000
LANDSCAPE AMENITY (TY 2)
EA 13.000 $2,700.000 $2,500.000 $2,000.000 $3,300.000 $2,572.200 $2,000.000
LANDSCAPE AMENITY (TY 3)
EA 4.000 $2,000.000 $1,000.000 $1,250.000 $1,200.000 $685.200 $4,000.000
LANDSCAPE AMENITY (TY 4)
EA 48.000 $12,500.000 $3,445.000 $4,000.000 $3,700.000 $4,134.000 $6,500.000
TREE PROTECTION
EA 61.000 $250.000 $50.000 $200.000 $500.000 $534.000 $250.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 11.700 $100.000 $400.000 $175.000 $370.000 $240.000 $200.000
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 27.200 $45.000 $126.000 $175.000 $370.000 $408.000 $253.000
ITS COM CBL (ETHERNET)
LF 1,180.000 $2.500 $3.500 $1.750 $3.800 $2.400 $12.500
SANITARY SEWER (6 IN) (PVC) (SDR 26)
LF 45.000 $70.000 $75.000 $130.000 $100.000 $90.400 $93.000
SANITARY SEWER (8 IN) (PVC) (SDR 26)
LF 214.000 $80.000 $120.000 $140.000 $100.000 $121.800 $97.000
SANITARY SEWER (12 IN) (PVC) (SDR 26)
LF 2,844.000 $82.000 $130.000 $150.000 $150.000 $154.400 $105.000
MANHOLE (SAN SEWER) ( 4' DIA)
EA 14.000 $5,515.000 $7,000.000 $5,000.000 $3,000.000 $2,934.900 $4,300.000
ADJUSTING MANHOLE (SANITARY SEWER)
EA 7.000 $1,500.000 $400.000 $500.000 $250.000 $1,180.500 $1,200.000
SAN SWR(FM)PVC(RESTRAINED JT) 12IN
LF 40.000 $95.000 $200.000 $200.000 $100.000 $199.500 $177.000
CUT & CAP ABND SANITARY SEWER MH
EA 1.000 $1,500.000 $3,500.000 $500.000 $1,000.000 $1,262.400 $1,300.000
ABAND/FILL EXIST SAN SEWER PIPE (6")
LF 155.000 $12.000 $12.000 $2.000 $10.000 $12.000 $6.150
ABAND/FILL EXIST SAN SEWER PIPE (8")
LF 2,936.000 $12.000 $12.000 $2.000 $10.000 $7.800 $6.150
SANITARY SEWER LATERAL (6")(PVC)
LF 295.000 $210.000 $95.000 $60.000 $100.000 $74.700 $100.000
PRE-CONSTRUCTION TELEVISION INSPECTION
LF 3,091.000 $10.000 $2.500 $3.000 $5.000 $2.400 $12.000
POST CONSTRUCTION TELEVISION INSPECTION
LF 3,151.000 $10.000 $2.500 $3.000 $5.000 $1.800 $8.000
WATER MAIN PIPE (PVC) (8IN) (C-900)
LF 810.000 $60.000 $150.000 $70.000 $100.000 $74.800 $68.000
FIRE HYDRANT BRANCH (LEAD) (6IN)
LF 70.000 $90.000 $70.000 $60.000 $100.000 $74.800 $140.000
FIRE HYDRANT ASSEMBLY
EA 6.000 $6,000.000 $3,800.000 $4,000.000 $4,500.000 $4,443.800 $5,000.000
REMOVING AND RELOCATING METER AND BOX
EA 11.000 $750.000 $1,400.000 $400.000 $1,500.000 $917.300 $1,800.000
REMOVING AND SALVAGING FIRE HYDRANT
EA 5.000 $1,500.000 $250.000 $300.000 $175.000 $330.000 $1,200.000
REMOVE AND RELOCATE FIRE HYDRANT
EA 1.000 $1,500.000 $2,500.000 $6,000.000 $5,000.000 $2,556.600 $3,600.000
ABAND/FILL EXIST WATER PIPE (8")
LF 902.000 $15.000 $10.000 $2.000 $10.000 $9.200 $9.000
WTR (RESTRAINED JOINT) (DI) 8"
LF 367.000 $65.000 $80.000 $150.000 $100.000 $182.800 $166.000
Totals: $5,810,196.650 $5,787,450.160 $5,895,692.900 $5,926,997.500 $6,195,181.083 $6,819,285.310