REMOVING CONC (RIPRAP)
|
CY
|
25.000
|
$155.000
|
$36.000
|
$255.220
|
$21.200
|
$83.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
320.000
|
$2.500
|
$26.000
|
$12.760
|
$10.600
|
$18.800
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
60.000
|
$16.000
|
$26.000
|
$58.000
|
$26.500
|
$83.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
180.000
|
$220.000
|
$405.000
|
$225.630
|
$299.510
|
$175.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (42 IN)
|
LF
|
85.000
|
$280.000
|
$485.000
|
$301.790
|
$342.640
|
$408.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
132.000
|
$300.000
|
$645.000
|
$326.600
|
$369.110
|
$415.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
15.000
|
$450.000
|
$500.000
|
$928.060
|
$848.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$178,636.350
|
$26,000.000
|
$64,305.740
|
$210,000.000
|
$127,110.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$2,500.000
|
$900.000
|
$1,160.070
|
$2,260.460
|
$2,705.000
|
|
|
CONC CURB (TY II)
|
LF
|
200.000
|
$20.000
|
$6.000
|
$58.000
|
$10.600
|
$35.500
|
|
|
CONC SIDEWALKS (4")
|
SY
|
300.000
|
$47.500
|
$95.000
|
$139.210
|
$95.400
|
$92.550
|
|
|
CONC SIDEWALKS (6")
|
SY
|
300.000
|
$56.000
|
$96.000
|
$139.210
|
$100.700
|
$115.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
6.000
|
$1,450.000
|
$2,050.000
|
$4,292.260
|
$4,240.000
|
$1,970.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$1,500.000
|
$1,750.000
|
$6,264.380
|
$4,240.000
|
$2,570.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
2.000
|
$1,507.000
|
$2,050.000
|
$4,756.290
|
$4,240.000
|
$2,060.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
6.000
|
$2,200.000
|
$2,050.000
|
$5,104.310
|
$4,240.000
|
$2,555.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
2.000
|
$1,800.000
|
$2,050.000
|
$6,264.380
|
$4,240.000
|
$2,015.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
6.000
|
$1,400.000
|
$2,200.000
|
$3,364.210
|
$4,240.000
|
$2,485.000
|
|
|
CURB RAMPS (TY 11)
|
EA
|
2.000
|
$1,800.000
|
$2,050.000
|
$3,596.220
|
$4,240.000
|
$2,015.000
|
|
|
CURB RAMPS (TY 20)
|
EA
|
2.000
|
$2,500.000
|
$2,050.000
|
$7,076.430
|
$4,240.000
|
$3,970.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$2,111.110
|
$2,175.000
|
$6,380.390
|
$4,240.000
|
$3,970.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
6.000
|
$3,200.000
|
$2,175.000
|
$7,308.450
|
$4,240.000
|
$4,590.000
|
|
|
CONDT (PVC) (SCH 80) (1 1/4")
|
LF
|
360.000
|
$9.000
|
$9.000
|
$9.070
|
$4.790
|
$9.600
|
|
|
CONDT (PVC) (SCH 80) (1 1/4") (BORE)
|
LF
|
360.000
|
$11.000
|
$9.000
|
$11.030
|
$9.060
|
$13.050
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,000.000
|
$7.200
|
$12.000
|
$11.510
|
$5.160
|
$12.850
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,400.000
|
$21.730
|
$13.000
|
$14.630
|
$9.440
|
$15.850
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
2,400.000
|
$11.700
|
$13.500
|
$14.880
|
$6.090
|
$18.700
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
300.000
|
$28.270
|
$18.000
|
$15.720
|
$10.360
|
$20.500
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
840.000
|
$16.700
|
$17.000
|
$13.260
|
$7.170
|
$17.850
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
300.000
|
$30.250
|
$22.500
|
$21.220
|
$11.440
|
$26.650
|
|
|
CONDT (RM) (2")
|
LF
|
240.000
|
$30.040
|
$29.000
|
$17.720
|
$18.130
|
$21.100
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
6,000.000
|
$1.460
|
$1.100
|
$1.050
|
$1.210
|
$1.300
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,200.000
|
$1.000
|
$1.580
|
$1.460
|
$1.490
|
$1.750
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
2,400.000
|
$1.000
|
$1.900
|
$1.530
|
$1.570
|
$1.900
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
3,000.000
|
$2.400
|
$1.650
|
$1.730
|
$1.760
|
$2.400
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
15.000
|
$955.000
|
$3,515.000
|
$868.130
|
$1,024.360
|
$695.000
|
|
|
GROUND BOX TY 2 (243636)W/APRON
|
EA
|
4.000
|
$1,900.000
|
$2,500.000
|
$1,288.230
|
$1,653.290
|
$2,890.000
|
|
|
REMOVE GROUND BOX
|
EA
|
15.000
|
$300.000
|
$150.000
|
$168.930
|
$233.100
|
$270.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
5.000
|
$4,700.000
|
$4,200.000
|
$4,140.070
|
$3,637.260
|
$3,640.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
50.000
|
$35.000
|
$72.000
|
$24.020
|
$14.270
|
$55.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
50.000
|
$29.960
|
$72.000
|
$25.470
|
$15.050
|
$54.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$513.750
|
$550.000
|
$566.110
|
$760.230
|
$645.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$595.000
|
$600.000
|
$618.320
|
$800.510
|
$715.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
4.000
|
$495.450
|
$400.000
|
$417.630
|
$310.790
|
$455.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
16.000
|
$88.010
|
$60.000
|
$52.200
|
$155.400
|
$125.000
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
144.000
|
$2.500
|
$2.000
|
$1.550
|
$1.600
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,440.000
|
$0.900
|
$1.350
|
$1.240
|
$1.060
|
$1.200
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
120.000
|
$3.000
|
$4.400
|
$3.480
|
$2.660
|
$3.300
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
960.000
|
$2.820
|
$4.000
|
$2.830
|
$2.660
|
$2.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,200.000
|
$5.850
|
$6.000
|
$5.240
|
$5.040
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
14.000
|
$112.810
|
$130.000
|
$125.290
|
$132.500
|
$120.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
14.000
|
$137.280
|
$134.000
|
$155.450
|
$106.000
|
$148.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
240.000
|
$1.150
|
$2.000
|
$1.240
|
$1.270
|
$1.200
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
120.000
|
$3.200
|
$5.300
|
$2.830
|
$2.920
|
$2.700
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
7.000
|
$290.000
|
$330.000
|
$307.420
|
$106.000
|
$290.000
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
120.000
|
$1.130
|
$1.200
|
$1.390
|
$1.060
|
$1.350
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,200.000
|
$0.190
|
$0.150
|
$0.090
|
$0.130
|
$0.120
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,200.000
|
$0.170
|
$0.250
|
$0.170
|
$0.260
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,200.000
|
$0.400
|
$0.380
|
$0.320
|
$0.540
|
$0.350
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,200.000
|
$0.900
|
$1.000
|
$0.510
|
$0.540
|
$0.550
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,200.000
|
$2.600
|
$2.300
|
$0.900
|
$0.960
|
$0.900
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
12.000
|
$40.000
|
$25.000
|
$12.760
|
$37.100
|
$12.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
12.000
|
$47.000
|
$35.000
|
$17.400
|
$37.100
|
$17.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
7.000
|
$172.000
|
$52.000
|
$29.000
|
$37.100
|
$28.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,200.000
|
$0.300
|
$0.650
|
$0.640
|
$0.370
|
$0.700
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,200.000
|
$0.700
|
$0.700
|
$0.810
|
$0.590
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,440.000
|
$0.300
|
$0.650
|
$0.410
|
$0.420
|
$0.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
120.000
|
$3.000
|
$3.700
|
$3.600
|
$5.300
|
$3.450
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
120.000
|
$3.000
|
$4.100
|
$3.600
|
$5.300
|
$3.450
|
|
TRAFFIC BUTTON TY I-C
|
EA
|
120.000
|
$5.400
|
$4.000
|
$3.600
|
$5.300
|
$3.450
|
|
TRAFFIC BUTTON TY II-A-A
|
EA
|
120.000
|
$4.750
|
$4.000
|
$3.600
|
$5.300
|
$3.450
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
12,000.000
|
$0.440
|
$0.460
|
$0.190
|
$0.230
|
$0.230
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,000.000
|
$0.490
|
$0.510
|
$0.210
|
$0.460
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
600.000
|
$2.500
|
$1.000
|
$0.580
|
$1.060
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
360.000
|
$3.100
|
$2.400
|
$1.160
|
$2.120
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
12.000
|
$51.610
|
$51.000
|
$19.720
|
$26.500
|
$18.750
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
12.000
|
$55.000
|
$51.000
|
$19.720
|
$21.200
|
$18.750
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,200.000
|
$0.150
|
$1.000
|
$1.160
|
$0.020
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,200.000
|
$0.070
|
$1.000
|
$1.160
|
$0.020
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
720.000
|
$0.180
|
$1.000
|
$1.160
|
$0.030
|
$0.130
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
360.000
|
$0.390
|
$1.000
|
$1.160
|
$0.050
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
360.000
|
$1.150
|
$1.000
|
$2.320
|
$0.160
|
$2.200
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
12.000
|
$17.990
|
$20.000
|
$5.800
|
$5.300
|
$5.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
12.000
|
$22.000
|
$20.000
|
$5.800
|
$5.300
|
$5.500
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
7.000
|
$18.500
|
$82.000
|
$17.400
|
$15.900
|
$17.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$28,000.000
|
$31,000.000
|
$17,916.620
|
$39,842.490
|
$46,665.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
4.000
|
$28,000.000
|
$31,000.000
|
$18,934.070
|
$39,667.590
|
$46,690.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
5.000
|
$3,868.270
|
$3,800.000
|
$3,418.600
|
$5,827.360
|
$4,170.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
4.000
|
$44,000.000
|
$38,000.000
|
$33,077.510
|
$25,767.940
|
$54,520.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
40.000
|
$230.000
|
$430.000
|
$146.550
|
$141.330
|
$195.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
10.000
|
$250.000
|
$430.000
|
$146.550
|
$141.330
|
$195.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
40.000
|
$245.000
|
$430.000
|
$146.550
|
$141.330
|
$195.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
10.000
|
$240.000
|
$430.000
|
$146.550
|
$141.330
|
$195.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
40.000
|
$235.000
|
$430.000
|
$146.550
|
$141.330
|
$195.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
20.000
|
$228.000
|
$430.000
|
$146.550
|
$141.330
|
$195.000
|
|
|
PED SIG SEC (LED)(2 INDICATIONS)
|
EA
|
40.000
|
$400.000
|
$230.000
|
$307.210
|
$295.030
|
$235.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
40.000
|
$500.000
|
$400.000
|
$281.030
|
$1,052.580
|
$220.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
40.000
|
$89.000
|
$63.000
|
$95.240
|
$61.830
|
$115.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
20.000
|
$97.000
|
$73.000
|
$107.140
|
$75.610
|
$127.000
|
|
|
BACK PLATE (12")(5 SEC)
|
EA
|
5.000
|
$140.000
|
$83.000
|
$119.040
|
$85.150
|
$138.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
6,600.000
|
$1.400
|
$1.300
|
$1.080
|
$1.150
|
$1.100
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
6,600.000
|
$2.500
|
$1.720
|
$1.310
|
$1.450
|
$1.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
16,080.000
|
$2.500
|
$1.750
|
$1.780
|
$1.940
|
$2.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$5,200.000
|
$3,900.000
|
$3,823.580
|
$2,935.680
|
$3,255.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$4,000.000
|
$2,000.000
|
$2,400.760
|
$2,330.940
|
$700.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
3.000
|
$1,100.000
|
$700.000
|
$338.640
|
$1,165.480
|
$280.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
4.000
|
$5,517.170
|
$5,000.000
|
$5,272.700
|
$4,898.260
|
$5,355.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$2,800.000
|
$1,350.000
|
$2,400.760
|
$1,942.460
|
$685.000
|
|
|
INS TRF SIG PL AM (S)1 ARM(24')
|
EA
|
1.000
|
$5,475.000
|
$5,141.000
|
$7,289.660
|
$6,282.730
|
$5,855.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM
|
EA
|
1.000
|
$5,020.000
|
$6,883.000
|
$9,037.880
|
$7,917.560
|
$7,090.000
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$4,800.000
|
$5,487.000
|
$7,376.530
|
$6,360.110
|
$6,235.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
1.000
|
$7,600.000
|
$7,022.000
|
$9,287.960
|
$8,064.900
|
$7,495.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
1.000
|
$5,400.000
|
$5,948.000
|
$8,094.480
|
$6,848.770
|
$7,190.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$7,650.000
|
$7,518.000
|
$9,962.890
|
$8,590.660
|
$8,555.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$7,000.000
|
$6,570.000
|
$8,834.700
|
$7,508.090
|
$7,680.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$7,350.000
|
$8,244.000
|
$10,826.890
|
$9,360.220
|
$9,065.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
1.000
|
$6,665.000
|
$7,430.000
|
$9,978.370
|
$8,497.380
|
$8,790.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
1.000
|
$8,250.000
|
$9,115.000
|
$11,983.650
|
$10,361.190
|
$10,265.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
1.000
|
$7,320.000
|
$7,813.000
|
$10,483.280
|
$8,903.360
|
$9,275.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$8,400.000
|
$9,211.000
|
$12,147.010
|
$10,462.950
|
$10,800.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$19,600.000
|
$13,961.000
|
$17,799.860
|
$15,497.950
|
$22,265.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
1.000
|
$19,000.000
|
$15,549.000
|
$19,689.700
|
$17,258.920
|
$24,765.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')
|
EA
|
1.000
|
$17,600.000
|
$14,494.000
|
$18,603.490
|
$16,062.930
|
$23,080.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$20,000.000
|
$16,575.000
|
$21,080.030
|
$18,346.480
|
$25,580.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
1.000
|
$21,000.000
|
$17,147.000
|
$22,917.500
|
$18,952.800
|
$26,155.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
1.000
|
$21,500.000
|
$18,119.000
|
$23,086.820
|
$19,983.120
|
$26,690.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(36-32')LUM
|
EA
|
1.000
|
$10,241.420
|
$11,728.000
|
$15,650.380
|
$13,208.660
|
$13,235.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(40-28')LUM
|
EA
|
1.000
|
$10,500.000
|
$12,883.000
|
$17,024.920
|
$14,432.960
|
$13,390.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(40-36')LUM
|
EA
|
1.000
|
$10,500.000
|
$13,954.000
|
$18,299.490
|
$15,568.220
|
$15,220.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-36')LUM
|
EA
|
1.000
|
$12,100.000
|
$14,505.000
|
$18,955.220
|
$16,152.280
|
$15,750.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(50 - 40')LUM
|
EA
|
1.000
|
$26,580.000
|
$19,151.000
|
$24,822.940
|
$21,232.440
|
$31,365.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(50-44')LUM
|
EA
|
1.000
|
$23,000.000
|
$19,627.000
|
$24,199.340
|
$20,677.000
|
$31,755.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(55-28')LUM
|
EA
|
1.000
|
$23,000.030
|
$19,746.000
|
$24,340.960
|
$20,880.840
|
$30,530.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(60-44')LUM
|
EA
|
1.000
|
$22,500.000
|
$20,454.000
|
$26,373.610
|
$22,691.320
|
$33,060.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
15.000
|
$1,700.000
|
$1,600.000
|
$2,278.050
|
$1,752.230
|
$1,545.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
28.000
|
$937.770
|
$600.000
|
$674.270
|
$528.200
|
$655.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
5.000
|
$3,000.000
|
$3,325.000
|
$3,260.840
|
$2,621.700
|
$4,120.000
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
1.000
|
$7,100.000
|
$13,300.000
|
$5,219.360
|
$4,628.500
|
$18,945.000
|
|
|
RADAR PRESENCE DETECTOR
|
EA
|
20.000
|
$6,630.000
|
$5,100.000
|
$5,048.000
|
$7,273.200
|
$7,065.000
|
|
|
RADAR ADVANCED DETECTION DEVICE
|
EA
|
10.000
|
$7,170.000
|
$6,000.000
|
$5,978.860
|
$7,273.200
|
$7,065.000
|
|
|
BBU SYSTEM (STAND-ALONE BATT CABINET)
|
EA
|
5.000
|
$7,200.000
|
$5,500.000
|
$6,882.210
|
$5,191.460
|
$8,425.000
|
|
|
CITY GPS COMMUNICATIONS MODULE
|
EA
|
4.000
|
$775.000
|
$565.000
|
$759.440
|
$780.800
|
$830.000
|
|
|
GPS COMMUNICATIONS UNIT
|
EA
|
4.000
|
$775.000
|
$850.000
|
$527.380
|
$846.200
|
$760.000
|
|
|
LED CHEVRON
|
EA
|
16.000
|
$4,500.000
|
$5,210.000
|
$3,728.590
|
$6,126.380
|
$3,660.000
|
|
|
LEAD LED CURVE SIGN
|
EA
|
2.000
|
$7,700.000
|
$8,050.000
|
$5,003.920
|
$7,981.380
|
$10,375.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$200.000
|
$10.000
|
$208.260
|
$155.400
|
$240.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$50.000
|
$100.000
|
$1,735.520
|
$38.850
|
$255.000
|
|
Totals: |
$2,030,777.930
|
$1,896,973.000
|
$1,970,211.300
|
$2,101,037.950
|
$2,294,731.600
|