HARRIS IH 10 (0508-01-359)

Items: 98

County: HARRIS
Length: N/A
Highway: IH 10
District: HOUSTON
Control Number: 0508-01-359
DBE Goal: N/A
Project: NH 2020(025)
Guaranty: N/A
Time: 242 WORKING DAYS
Engineer's Estimate: $4,114,789.51
Date: 09/05/2019 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$4,114,789.51
$4,637,319.22
Over/Under Est: 12.7% $522,529.71
Over/Under Est: 16.34% $672,343.23
Amt Left: 3.23% $149,813.52
Over/Under Est: 18.21% $749,134.11
Amt Left: 4.89% $226,604.40
Delta: -1.60% -$76,790.88
Over/Under Est: 23.94% $984,968.24
Amt Left: 9.97% $462,438.53
Delta: -4.85% -$235,834.13
Over/Under Est: 24.68% $1,015,668.60
Amt Left: 10.63% $493,138.89
Delta: -0.60% -$30,700.36
Over/Under Est: 31.1% $1,279,632.94
Amt Left: 16.33% $757,103.23
Delta: -5.15% -$263,964.34
$6,243,916.44
Over/Under Est: 51.74% $2,129,126.93
Amt Left: 34.64% $1,606,597.22
Delta: -15.75% -$849,493.99

Bid Items & Bid Tabulations

98 Total 0 of 98
HARRIS  |  IH 10  |  HOUSTON  |  0508-01-359  |  09/05/2019  |  $4,114,789.51  |  NH 2020(025)  |  CONSTRUCT RAMPS  |  242 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
RAGLE CONSTRUCTION, INC.
STERLING DELAWARE HOLDING COMPANY, INC.
MAIN LANE INDUSTRIES LTD.
HARPER BROTHERS CONSTRUCTION LLC
ANGEL BROTHERS HOLDINGS CORP.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 48.000 $4,000.000 $8,350.000 $7,000.000 $2,500.000 $1,600.000 $400.000 $10,400.000 $3,185.180
REMOVING CONC (PAV)
SY 2,701.000 $20.600 $13.790 $8.000 $4.210 $5.000 $3.130 $15.000 $5.950
REMOVING CONC (RIPRAP)
SY 5,246.000 $15.000 $3.640 $6.000 $3.040 $2.000 $1.790 $5.000 $9.040
REMOVING CONC (SIDEWALKS)
SY 1,071.000 $15.000 $5.330 $9.000 $3.040 $2.000 $2.000 $5.000 $11.570
REMOVING CONC (CTB)
LF 1,584.000 $30.000 $7.610 $10.000 $5.000 $10.000 $6.000 $10.500 $9.650
REMOVING CONC (RETAINING WALLS)
SY 2,242.000 $78.780 $41.470 $30.000 $4.830 $4.000 $4.000 $7.500 $55.030
REMOVING CONC (CURB OR CURB & GUTTER)
LF 2,343.000 $5.000 $1.610 $6.000 $2.000 $1.500 $1.500 $6.000 $13.610
REMOVING CONC (FLUME)
SY 784.000 $6.000 $12.460 $10.000 $3.040 $2.000 $2.000 $8.500 $14.840
REMOVING STAB BASE AND ASPH PAV (7")
SY 3,486.000 $3.110 $3.700 $2.000 $7.230 $5.000 $4.680 $5.000 $5.930
EXCAVATION (ROADWAY)
CY 26,033.000 $10.000 $5.740 $4.000 $11.000 $15.000 $20.000 $0.800 $9.240
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 24,808.000 $10.000 $4.840 $5.000 $24.350 $15.000 $7.000 $0.500 $16.350
BLOCK SODDING
SY 3,434.000 $7.740 $4.690 $6.250 $3.900 $3.000 $3.250 $4.700 $3.610
STRAW OR HAY MULCH
SY 5,905.000 $0.200 $0.980 $0.460 $0.460 $0.200 $0.160 $0.550 $0.220
CELL FBR MLCH SEED(TEMP)(WARM)
SY 5,904.000 $0.290 $0.700 $0.460 $0.460 $0.300 $0.270 $0.550 $0.280
CELL FBR MLCH SEED(TEMP)(COOL)
SY 5,904.000 $0.290 $0.700 $0.460 $0.460 $0.300 $0.270 $0.550 $0.290
FERTILIZER
AC 1.220 $704.780 $1,690.000 $898.000 $890.640 $800.000 $800.000 $1,080.000 $630.730
VEGETATIVE WATERING
MG 147.000 $19.640 $55.980 $25.000 $55.000 $40.000 $45.000 $30.000 $16.870
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
CY 192.000 $7.740 $157.000 $150.000 $75.000 $100.000 $100.000 $150.000 $106.080
LIME (HYDRATED LIME (DRY))
TON 11.000 $9.740 $400.000 $250.000 $180.000 $350.000 $200.000 $450.000 $226.000
LIME TRT (SUBGRADE)(6")
SY 4,878.000 $2.000 $3.790 $5.500 $3.500 $6.000 $4.250 $9.000 $8.410
CEMENT TREAT (NEW BASE)(12")
SY 6,918.000 $2.440 $4.050 $3.000 $6.250 $6.000 $45.000 $53.000 $38.250
ASPHALT STAB BASE (GR 4)(PG 64)
TON 25.700 $72.170 $855.400 $400.000 $275.000 $130.000 $275.000 $400.000 $110.810
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 8.700 $198.890 $855.400 $900.000 $600.000 $200.000 $600.000 $425.000 $107.390
PLANE ASPH CONC PAV(0" TO 2")
SY 5,827.000 $5.490 $5.260 $2.500 $3.000 $2.500 $1.000 $5.650 $2.050
CONC PVMT (CONT REINF - CRCP) (14")
SY 3,837.000 $45.000 $112.520 $100.000 $117.000 $100.000 $100.000 $100.000 $101.740
CUT & RESTORE ASPH PAVING
SY 33.000 $105.540 $134.520 $120.000 $300.000 $150.000 $175.000 $100.000 $131.560
TEMPORARY SPL SHORING
SF 19,951.000 $3.840 $20.370 $19.000 $17.000 $10.000 $20.000 $22.750 $23.970
DRILL SHAFT (48 IN)
LF 52.000 $235.130 $495.000 $495.000 $495.000 $500.000 $495.000 $594.000 $989.620
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 56.000 $230.220 $265.000 $265.000 $265.000 $275.000 $265.000 $318.000 $439.420
CL C CONC (RAIL FOUNDATION)
CY 223.000 $318.150 $205.050 $400.000 $427.000 $390.000 $130.000 $650.000 $632.470
CL C CONC (COLLAR)
EA 4.000 $612.500 $1,100.000 $400.000 $1,200.000 $1,000.000 $1,250.000 $850.000 $1,342.430
RETAINING WALL (MSE)
SF 20,130.000 $36.000 $52.830 $54.000 $44.000 $60.000 $65.000 $43.200 $67.270
RIPRAP (CONC)(4 IN)
CY 620.000 $481.740 $324.910 $445.000 $450.000 $440.000 $475.000 $700.000 $511.330
RIPRAP (CONC)(FLUME)
CY 74.000 $443.120 $463.510 $450.000 $525.000 $600.000 $425.000 $700.000 $567.440
RAIL (TY T552)
LF 2,613.000 $80.000 $47.150 $45.000 $40.000 $50.000 $65.000 $125.000 $113.060
RC PIPE (CL III)(18 IN)
LF 6.000 $63.570 $325.530 $300.000 $210.000 $125.000 $175.000 $85.000 $83.320
RC PIPE (CL III)(24 IN)
LF 420.000 $70.470 $69.780 $90.000 $150.000 $130.000 $100.000 $88.000 $106.130
INLET (COMPL)(TY AZR2G)
EA 5.000 $5,925.760 $9,690.010 $6,500.000 $10,000.000 $9,000.000 $9,500.000 $7,500.000 $10,423.280
INLET (COMPL)(EXT TY C)
EA 2.000 $1,118.860 $2,556.410 $2,500.000 $1,235.000 $600.000 $1,150.000 $810.000 $2,018.420
INLET (COMPL)(TY C)
EA 4.000 $3,116.800 $5,543.350 $4,000.000 $5,870.000 $5,000.000 $5,425.000 $3,965.000 $4,976.620
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $643.070 $2,086.350 $1,500.000 $1,412.000 $800.000 $1,425.000 $775.000 $2,068.910
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,215.160 $1,587.610 $2,000.000 $1,718.000 $1,100.000 $1,700.000 $1,020.000 $1,828.900
REMOV STR (INLET)
EA 5.000 $505.870 $570.880 $600.000 $1,015.000 $1,000.000 $750.000 $400.000 $850.970
REMOV STR (PIPE)
LF 229.000 $20.000 $12.460 $20.000 $20.000 $20.000 $50.000 $10.000 $26.080
MOBILIZATION
LS 1.000 $398,865.350 $449,484.950 $470,000.000 $450,000.000 $510,000.000 $445,000.000 $500,000.000 $605,694.940
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,000.000 $3,285.350 $35,000.000 $6,200.000 $35,000.000 $5,500.000 $1,275.000 $14,908.040
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 68.000 $78.000 $121.200 $78.000 $78.000 $100.000 $50.000 $94.000 $68.310
ROCK FILTER DAMS (REMOVE)
LF 68.000 $8.880 $25.990 $16.000 $16.000 $20.000 $15.000 $20.000 $12.960
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 95.000 $28.220 $57.810 $31.590 $31.590 $60.000 $45.000 $38.000 $26.810
CONSTRUCTION EXITS (REMOVE)
SY 95.000 $9.030 $15.010 $13.000 $13.000 $10.000 $15.000 $16.000 $10.060
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,372.000 $2.680 $2.350 $2.940 $2.940 $2.500 $2.500 $3.500 $2.940
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,372.000 $0.830 $0.490 $0.740 $0.740 $0.500 $1.000 $0.900 $0.900
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 290.000 $3.420 $5.990 $6.880 $6.880 $6.000 $5.000 $8.250 $4.720
BIODEG EROSN CONT LOGS (REMOVE)
LF 290.000 $0.750 $4.190 $1.180 $1.180 $2.000 $2.000 $1.400 $1.100
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 2,160.000 $9.000 $9.920 $9.000 $25.000 $20.000 $14.000 $16.000 $9.300
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,290.000 $6.000 $5.270 $7.000 $10.000 $10.000 $7.000 $7.000 $7.410
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 2,160.000 $8.000 $9.660 $9.000 $13.000 $20.000 $8.000 $15.000 $12.850
PORT CTB CONNECT HARDWARE
EA 72.000 $50.000 $1.080 $60.000 $110.000 $1.000 $50.000 $36.000 $101.260
CONC CURB & GUTTER (TY II)
LF 1,820.000 $16.560 $6.270 $25.000 $17.000 $40.000 $22.500 $40.000 $29.330
CONC CURB (TY III)
LF 2,210.000 $15.000 $11.880 $6.000 $30.000 $10.000 $10.500 $25.000 $21.680
REMOVE METAL BEAM GUARD FENCE
LF 344.000 $2.900 $10.000 $7.250 $5.000 $5.000 $10.000 $12.000 $2.640
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $300.000 $500.000 $672.000 $450.000 $300.000 $500.000 $600.000 $300.800
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $300.000 $350.000 $450.000 $450.000 $300.000 $350.000 $420.000 $382.130
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,290.420 $4,600.000 $1,500.000 $4,600.000 $4,000.000 $4,600.000 $5,520.000 $1,783.260
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 3.000 $19,616.180 $24,800.000 $21,000.000 $32,000.000 $30,000.000 $24,800.000 $29,760.000 $24,686.120
PIPE UNDERDRAINS (TY 6) (6")
LF 1,989.000 $150.000 $8.880 $0.010 $21.000 $1.000 $35.000 $30.000 $22.550
REMOVE RD IL ASM (TRANS-BASE)
EA 1.000 $1,485.000 $375.000 $375.000 $375.000 $400.000 $375.000 $450.000 $645.100
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 7.000 $2,932.100 $3,575.000 $3,575.000 $3,575.000 $3,600.000 $3,575.000 $4,290.000 $3,962.560
CONDT (PVC) (SCH 40) (2")
LF 1,165.000 $12.030 $8.250 $8.250 $8.250 $8.250 $8.250 $9.900 $12.730
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 6,750.000 $8.150 $14.000 $14.000 $14.000 $14.000 $14.000 $16.800 $18.740
CONDT (PVC) (SCH 80) (2") (BORE)
LF 82.000 $11.690 $10.000 $10.000 $10.000 $10.000 $10.000 $12.000 $27.090
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,220.000 $19.360 $25.000 $25.000 $25.000 $25.000 $25.000 $30.000 $32.440
ELEC CONDR (NO.8) BARE
LF 1,307.000 $1.010 $1.950 $1.950 $1.950 $2.000 $1.950 $2.350 $1.220
ELEC CONDR (NO.8) INSULATED
LF 2,614.000 $1.040 $2.000 $2.000 $2.000 $2.000 $2.000 $2.400 $1.600
GROUND BOX TY A (122311)W/APRON
EA 5.000 $672.100 $795.000 $795.000 $795.000 $800.000 $795.000 $950.000 $1,049.260
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 2.000 $6,086.420 $24,000.000 $5,600.000 $5,600.000 $5,600.000 $5,600.000 $6,720.000 $6,624.480
ALUMINUM SIGNS (TY O)
SF 193.000 $18.900 $34.950 $35.000 $35.000 $35.000 $35.000 $42.000 $28.460
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $558.810 $645.000 $455.000 $455.000 $450.000 $645.000 $775.000 $653.470
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $625.220 $550.000 $395.000 $395.000 $550.000 $550.000 $660.000 $644.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 8.000 $1,060.350 $675.000 $510.000 $510.000 $550.000 $675.000 $810.000 $848.670
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $730.000 $970.000 $640.000 $640.000 $750.000 $970.000 $1,165.000 $795.180
REMOVE SM RD SN SUP&AM
EA 8.000 $80.650 $100.000 $60.000 $60.000 $95.000 $100.000 $120.000 $94.720
RELOCATE LRSA
EA 1.000 $5,834.610 $5,000.000 $1,250.000 $1,250.000 $1,250.000 $5,000.000 $1,500.000 $4,306.140
REMOVE LRSA
EA 2.000 $1,025.000 $2,500.000 $375.000 $375.000 $375.000 $2,500.000 $450.000 $1,027.080
INS OH SN SUP(30 FT CANT)
EA 2.000 $11,285.000 $21,795.060 $24,000.000 $24,000.000 $24,000.000 $24,000.000 $28,800.000 $23,623.120
REMOVE OVERHD SIGN SUP
EA 2.000 $8,287.150 $12,530.000 $7,500.000 $900.000 $1,250.000 $2,500.000 $120.000 $22,473.660
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 308.000 $0.710 $1.100 $2.000 $2.000 $1.100 $1.100 $2.400 $1.430
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,178.000 $0.590 $0.720 $1.500 $1.500 $0.750 $0.720 $1.800 $0.870
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,182.000 $0.590 $0.720 $1.500 $1.500 $0.750 $0.720 $1.800 $0.980
REFL PAV MRKR TY I-R
EA 15.000 $5.770 $4.000 $8.000 $8.000 $4.000 $4.000 $9.500 $8.020
REFL PAV MRKR TY II-C-R
EA 733.000 $4.180 $4.000 $8.000 $8.000 $4.000 $4.000 $9.500 $5.240
ELIM EXT PAV MRK & MRKS (4")
LF 2,802.000 $0.240 $0.450 $1.000 $1.000 $0.450 $0.450 $1.200 $0.730
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,372.570 $10,818.340 $5,000.000 $5,827.230 $15,000.000 $7,500.000 $28,800.000 $12,667.290
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 5,758.000 $0.570 $1.000 $0.800 $0.800 $1.000 $1.000 $0.950 $0.890
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 1,729.000 $0.550 $1.100 $0.800 $0.800 $1.100 $1.100 $0.950 $0.820
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 4,525.000 $1.000 $1.700 $1.600 $1.600 $1.700 $1.700 $1.900 $1.570
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 4,288.000 $0.560 $1.000 $0.800 $0.800 $1.000 $1.000 $0.950 $0.890
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 17.000 $2,729.720 $2,500.000 $2,500.000 $2,500.000 $2,500.000 $2,500.000 $3,000.000 $4,698.860
Totals: $4,114,789.514 $4,637,319.220 $4,787,132.740 $4,863,923.621 $5,099,757.750 $5,130,458.110 $5,394,422.450 $6,243,916.451