Show Job Controls
Bid Cobra

HARRIS IH 45 (0500-03-625)

Items: 44

County: HARRIS
Length: N/A
Highway: IH 45
District: HOUSTON
Control Number: 0500-03-625
DBE Goal: N/A
Project: C 500-3-625
Guaranty: N/A
Time: 176 WORKING DAYS
Engineer's Estimate: $3,603,274.68
Date: 12/02/2020 (5 years ago)
Contract Number: N/A
Type: INSTALL/UPGRADE ROADWAY LIGHTING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$3,603,274.68
Over/Under Est: -21.68% -$781,255.29
$2,845,214.20
Over/Under Est: -21.04% -$758,060.48
Amt Left: 0.82% $23,194.81
$2,957,839.45
Over/Under Est: -17.91% -$645,435.23
Amt Left: 4.81% $135,820.06
Delta: -3.96% -$112,625.25
Over/Under Est: -14.8% -$533,160.35
Amt Left: 8.79% $248,094.94
Delta: -3.80% -$112,274.88
Over/Under Est: -0.75% -$27,110.48
Amt Left: 26.72% $754,144.81
Delta: -16.48% -$506,049.87
Over/Under Est: -0.32% -$11,671.42
Amt Left: 27.27% $769,583.87
Delta: -0.43% -$15,439.06
Subcontractor Percentage Amount
RANSOM DRILLING SERVICES, LLC 8.74% $307,070.69
DOUBLE S CONSTRUCTION 2.39% $83,970.13
BARRICADES UNLIMITED 0.82% $28,809.84
Total: 11.95% $419,850.66

Bid Items & Bid Tabulations

44 Total 0 of 44
HARRIS  |  IH 45  |  HOUSTON  |  0500-03-625  |  12/02/2020  |  $3,603,274.68  |  C 500-3-625  |  INSTL/UPGRADE ROADWAY LIGHTING  |  176 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
TRAF-TEX, INC.
SICE, INC.
THIRD COAST SERVICES LLC
ALLSTATE SIGNAL & CONSTRUCTION, LLC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
PREPARING ROW
STA 128.000 $2,700.000 $823.250 $324.000 $193.678 $204.410 $1,255.000 $159.660
REMOVING CONC (RIPRAP)
SY 75.000 $14.000 $53.250 $79.500 $72.415 $18.810 $150.000 $95.800
SPEC EXCAV WORK (ORIGINAL)
CY 1,060.000 $20.000 $24.300 $87.600 $25.178 $18.400 $22.600 $63.860
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 160.000 $590.000 $434.070 $673.000 $605.598 $663.560 $637.890 $817.890
DRILL SHAFT (HIGH MAST POLE) (66 IN)
LF 800.000 $545.000 $560.350 $695.000 $728.961 $709.030 $675.000 $984.300
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $230.000 $224.850 $148.000 $335.896 $192.210 $189.410 $222.150
RIPRAP (CONC)(4 IN)
CY 63.000 $445.000 $361.500 $1,074.000 $455.345 $697.760 $426.610 $760.340
MOBILIZATION
LS 1.000 $304,090.430 $241,128.870 $71,418.000 $169,740.400 $307,000.000 $350,000.000 $303,080.620
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,500.000 $797.920 $2,233.000 $5,571.879 $3,012.800 $4,725.000 $791.890
SANDBAGS FOR EROSION CONTROL (12")
LF 245.000 $10.000 $2.200 $50.650 $4.167 $4.480 $7.100 $8.770
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,955.000 $2.750 $1.370 $3.600 $1.647 $2.240 $2.630 $2.920
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,955.000 $1.000 $0.530 $0.500 $0.470 $2.240 $0.790 $0.880
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,075.000 $6.000 $0.530 $8.850 $2.220 $5.600 $5.290 $5.560
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,075.000 $2.000 $0.530 $2.900 $0.939 $2.050 $1.430 $1.520
REMOVE RD IL ASM (BRIDGE MOUNT)
EA 6.000 $310.000 $266.250 $419.000 $598.736 $204.410 $750.000 $605.570
REMOVE RD IL ASM (TRANS-BASE)
EA 15.000 $365.000 $426.000 $405.000 $868.600 $204.410 $1,250.000 $767.450
REMOVE RD IL ASM (U/P)
EA 101.000 $315.000 $213.000 $53.000 $137.798 $122.650 $500.000 $166.430
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 58.000 $1,450.000 $1,044.200 $640.000 $765.321 $646.240 $1,387.000 $822.990
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 4.000 $1,410.000 $1,079.400 $743.000 $788.908 $966.560 $1,468.000 $920.630
IN RD IL (TY SA) 40B-8 (250W EQ) LED
EA 3.000 $3,250.000 $2,516.700 $2,853.000 $2,531.050 $2,244.480 $3,451.000 $3,200.540
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 5.000 $3,850.000 $2,755.400 $3,029.000 $2,954.495 $2,421.440 $3,609.000 $3,633.350
HI MST IL POLE (150 FT)(100 MPH)
EA 4.000 $32,575.000 $28,511.300 $31,428.000 $32,565.598 $29,896.160 $33,948.000 $32,792.670
HI MST IL POLE (175 FT)(100 MPH)
EA 16.000 $45,960.000 $35,623.900 $38,481.000 $39,999.566 $37,955.680 $41,664.000 $39,336.390
CONDT (PVC) (SCH 80) (2")
LF 3,980.000 $10.000 $8.140 $12.300 $6.165 $10.460 $10.310 $9.440
CONDT (PVC) (SCH 80) (2") (BORE)
LF 9,260.000 $18.000 $17.340 $13.750 $8.328 $17.330 $13.910 $14.600
CONDT (RM) (3/4")
LF 2,765.000 $20.000 $15.820 $9.550 $10.702 $12.010 $11.280 $12.130
CONDT (RM) (1")
LF 1,395.000 $20.000 $18.770 $15.150 $9.886 $15.260 $13.670 $13.750
CONDT (RM) (2")
LF 395.000 $25.000 $22.000 $32.000 $16.495 $21.330 $20.310 $17.060
ELEC CONDR (NO.12) BARE
LF 2,825.000 $1.000 $0.840 $0.820 $0.387 $0.800 $0.850 $0.700
ELEC CONDR (NO.12) INSULATED
LF 5,650.000 $1.100 $0.840 $0.840 $0.431 $0.790 $0.850 $0.720
ELEC CONDR (NO.8) BARE
LF 14,920.000 $1.150 $0.970 $0.910 $0.552 $0.910 $0.950 $0.840
ELEC CONDR (NO.8) INSULATED
LF 35,700.000 $1.300 $1.020 $1.120 $0.666 $1.090 $1.110 $0.930
GROUND BOX TY D (162922)W/APRON
EA 75.000 $1,100.000 $712.000 $602.000 $976.023 $791.840 $894.280 $803.080
REMOVE ELECTRICAL SERVICES
EA 15.000 $495.000 $426.000 $450.000 $582.483 $327.040 $250.000 $248.060
ELC SRV TY A 240/480 060(SS)SS(E)GC(O)
EA 14.000 $6,500.000 $5,844.500 $6,394.000 $5,695.156 $5,964.000 $6,925.000 $5,483.920
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 1.000 $6,150.000 $4,508.000 $6,712.000 $4,403.468 $4,880.410 $7,225.000 $5,224.930
TREE REMOVAL (4" - 12" DIA)
EA 8.000 $3,000.000 $852.000 $735.000 $1,144.444 $327.040 $488.790 $998.570
REMOVE HIGH MAST ILLUM FIXTURE
EA 1.000 $1,200.000 $1,065.000 $1,237.000 $546.770 $500.000 $1,221.000 $281.600
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 176.000 $60.000 $120.130 $150.000 $133.030 $163.520 $175.000 $249.740
REMOVE HIGH MAST ILLUMINATION
EA 19.000 $5,890.000 $3,137.500 $2,230.000 $4,098.998 $4,435.200 $6,257.000 $5,138.790
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
EA 3.000 $27,460.000 $22,019.400 $19,590.000 $20,612.759 $21,293.440 $26,032.000 $25,986.240
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
EA 18.000 $21,260.000 $22,019.400 $20,395.000 $21,457.359 $22,120.000 $26,770.000 $23,777.200
HI MAST POLE HPS WITH LED FIXTURES
EA 1.000 $9,500.000 $6,357.200 $6,268.000 $6,221.852 $5,500.320 $7,577.000 $8,077.640
TMA (MOBILE OPERATION)
HR 920.000 $40.000 $32.010 $25.000 $133.971 $30.000 $75.980 $204.230
Totals: $3,603,274.680 $2,822,019.390 $2,845,214.200 $2,957,839.571 $3,070,114.330 $3,576,164.200 $3,591,603.260