Bid Cobra

HARRIS IH 610 (0271-16-170)

Items: 107

County: HARRIS
Length: 0.0000 MILES
Highway: IH 610
District: HOUSTON
Control Number: 0271-16-170
DBE Goal: 0.0%
Project: STP 2B25(078)VRU
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $2,795,126.72
Date: 08/07/2025 (10 months ago)
Contract Number: 8253029
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00215175
Contract Type: Federal
Project Description: REBUILD TRAFFIC SIGNALS, UPGRADE PEDESTRIAN RELATED COMPONENTS, INTERSECTION SIGNING AND INTERSECTION STRIPING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$2,795,126.72
$2,464,072.63
Over/Under Est: -11.84% -$331,054.09
$2,864,016.47
Over/Under Est: 2.46% $68,889.75
Amt Left: 16.23% $399,943.84
Over/Under Est: 3.5% $97,765.28
Amt Left: 17.4% $428,819.37
Delta: -1.01% -$28,875.53
$3,015,933.86
Over/Under Est: 7.9% $220,807.14
Amt Left: 22.4% $551,861.23
Delta: -4.25% -$123,041.86
Over/Under Est: 11.63% $325,038.18
Amt Left: 26.63% $656,092.27
Delta: -3.46% -$104,231.04
Subcontractor Percentage Amount
WILSON BUILDING SERVICES, INC. 10.51% $258,974.03
TRP CONSTRUCTION GROUP, LLC 3.63% $89,445.84
Total: 14.14% $348,419.87

Bid Items & Bid Tabulations

107 Total 0 of 107
HARRIS  |  IH 610  |  HOUSTON  |  0271-16-170  |  08/07/2025  |  $2,795,126.72  |  STP 2B25(078)VRU  |  HAZARD ELIM & SAFETY  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THIRD COAST SERVICES LLC
TRAF-TEX, INC.
FLORIDA TRAFFIC CONTROL DEVICES, INC.
CREACOM, INC.
SELECT MAINTENANCE, L.L.C.
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 507.000 $65.000 $40.330 $112.000 $59.500 $29.840 $30.000
REMOV CONC (CURB)
LF 289.000 $20.000 $9.220 $28.800 $17.850 $12.940 $20.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 267.000 $450.000 $227.630 $353.750 $1,245.000 $671.520 $450.000
DRILL SHAFT (TRF SIG POLE) (42 IN)
LF 18.000 $465.000 $335.230 $639.550 $1,510.000 $326.060 $550.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $660.000 $366.030 $662.200 $1,800.000 $529.730 $600.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 2.000 $540.000 $518.580 $1,814.000 $892.000 $1,372.390 $2,000.000
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $540.000 $518.580 $1,961.000 $892.000 $1,372.390 $2,000.000
MOBILIZATION
LS 1.000 $254,000.000 $246,407.260 $190,000.000 $200,000.000 $211,114.050 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,300.000 $7,344.760 $1,559.000 $11,110.000 $9,984.280 $36,650.000
TMA (STATIONARY)
DAY 346.000 $200.000 $426.380 $251.000 $163.000 $509.990 $55.000
CONC CURB (TY II)
LF 574.000 $58.000 $14.980 $84.000 $29.750 $30.190 $65.000
CONC SIDEWALKS (4")
SY 76.000 $135.000 $149.810 $226.000 $119.000 $132.080 $170.000
CONC SIDEWALKS (6")
SY 358.000 $160.000 $161.340 $251.000 $178.000 $163.870 $170.000
CURB RAMPS (TY 1)
EA 31.000 $3,200.000 $3,226.710 $5,009.000 $2,975.000 $3,499.590 $2,800.000
CURB RAMPS (TY 2)
EA 8.000 $3,690.000 $3,687.670 $5,036.000 $3,565.000 $4,244.790 $2,800.000
CURB RAMPS (TY 5)
EA 2.000 $4,363.000 $4,609.580 $5,146.000 $3,865.000 $4,668.860 $2,800.000
CURB RAMPS (TY 7)
EA 9.000 $3,400.000 $3,399.570 $5,032.000 $3,565.000 $3,804.260 $3,000.000
CURB RAMPS (TY 20)
EA 2.000 $5,180.000 $4,033.380 $5,146.000 $5,350.000 $6,587.460 $3,800.000
CURB RAMPS (TY 21)
EA 2.000 $4,418.000 $3,745.280 $5,146.000 $4,160.000 $4,395.760 $4,500.000
CONC MEDIAN (MONO NOSE)
SY 43.000 $253.000 $259.290 $396.000 $300.000 $303.020 $170.000
CONDT (PVC) (SCH 80) (2")
LF 1,245.000 $20.000 $13.830 $17.800 $12.100 $12.010 $20.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 530.000 $27.450 $18.390 $30.350 $12.100 $17.040 $22.000
CONDT (PVC) (SCH 80) (3")
LF 2,170.000 $24.000 $19.700 $30.400 $14.650 $54.580 $29.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,720.000 $29.150 $27.030 $48.100 $26.600 $17.830 $31.000
CONDT (PVC) (SCH 80) (4")
LF 605.000 $31.800 $23.300 $54.300 $22.600 $51.800 $30.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,465.000 $40.150 $29.890 $54.330 $28.600 $19.800 $33.000
ELEC CONDR (NO.8) BARE
LF 6,475.000 $2.000 $1.840 $1.600 $1.600 $1.370 $1.800
ELEC CONDR (NO.8) INSULATED
LF 120.000 $2.100 $2.230 $1.920 $1.900 $2.010 $2.000
ELEC CONDR (NO.6) BARE
LF 930.000 $2.420 $2.190 $1.900 $1.750 $1.960 $2.000
ELEC CONDR (NO.6) INSULATED
LF 2,775.000 $2.750 $2.720 $2.410 $2.350 $2.420 $2.250
TRAY CABLE (4 CONDR) (12 AWG)
LF 6,730.000 $3.660 $3.460 $3.600 $3.050 $2.520 $2.700
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 3.000 $4,250.000 $4,918.560 $5,528.000 $5,965.000 $5,590.620 $6,500.000
GROUND BOX TY D (162922)
EA 1.000 $1,375.000 $907.720 $1,237.000 $786.000 $1,010.870 $2,000.000
GROUND BOX TY D (162922)W/APRON
EA 46.000 $1,650.000 $1,309.100 $1,338.000 $1,560.000 $1,319.990 $2,000.000
REMOVE GROUND BOX
EA 40.000 $467.000 $230.610 $422.000 $287.000 $439.940 $250.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 3.000 $11,000.000 $9,257.470 $14,964.000 $8,280.000 $11,304.220 $25,000.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $12,500.000 $9,663.590 $14,375.000 $8,280.000 $11,304.220 $25,000.000
ALUMINUM SIGNS (TY A)
SF 535.250 $41.500 $27.580 $16.300 $25.250 $59.600 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $890.000 $1,000.140 $800.000 $1,000.000 $947.490 $691.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $962.000 $1,081.110 $826.000 $1,128.890 $1,134.160 $827.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 8.000 $780.000 $880.650 $302.000 $777.000 $1,148.700 $837.000
REMOVE SM RD SN SUP&AM
EA 4.000 $140.000 $152.290 $302.000 $188.000 $178.410 $130.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 8.000 $345.000 $403.340 $444.400 $416.000 $205.850 $350.000
RE PM TY III (W)(6")(SLD)
LF 1,199.000 $0.750 $2.130 $1.000 $2.200 $1.370 $1.850
RE PM TY III (W)(6")(BRK)
LF 1,810.000 $1.000 $2.360 $1.000 $2.450 $1.370 $2.050
RE PM TY III (W)(6")(DOT)
LF 354.000 $0.690 $4.320 $1.700 $4.500 $4.120 $3.750
RE PM TY III (W)(8")(SLD)
LF 2,507.000 $1.290 $3.460 $1.700 $3.600 $2.400 $3.000
RE PM TY III (W)(24")(SLD)
LF 1,977.000 $11.400 $12.390 $9.440 $12.800 $13.720 $10.750
RE PM TY III (Y)(6")(SLD)
LF 530.000 $0.760 $2.130 $1.000 $2.200 $1.370 $1.850
RE PM TY III (W)(ARROW)
EA 23.000 $200.000 $374.530 $222.220 $385.000 $528.370 $325.000
RE PM TY III (W)(DBL ARROW)
EA 7.000 $400.000 $432.150 $333.330 $446.000 $724.200 $375.000
RE PM TY III (W)(WORD)
EA 17.000 $200.000 $409.100 $277.750 $422.000 $720.500 $355.000
RE PM TY III (BLK)(6")(SHADOW)
LF 1,160.000 $1.850 $2.600 $1.000 $2.700 $2.740 $2.250
PREFAB PM TY C (W)(ARROW)
EA 6.000 $300.000 $355.540 $222.220 $367.000 $343.100 $310.000
PREFAB PM TY C (W)(DBL ARROW)
EA 2.000 $450.000 $503.200 $344.400 $520.000 $658.740 $437.000
PREFAB PM TY C (W)(WORD)
EA 14.000 $300.000 $450.250 $311.000 $465.000 $425.440 $391.000
REFL PAV MRKR TY I-C
EA 58.000 $6.100 $6.910 $7.000 $7.500 $8.230 $6.000
REFL PAV MRKR TY II-A-A
EA 60.000 $6.300 $6.910 $7.000 $7.500 $8.230 $6.000
REFL PAV MRKR TY II-C-R
EA 229.000 $6.500 $6.910 $6.700 $7.500 $8.230 $6.000
ELIM EXT PM & MRKS (4")
LF 35.000 $0.500 $0.720 $0.400 $0.750 $1.370 $0.620
ELIM EXT PM & MRKS (6")
LF 3,272.000 $0.500 $0.760 $0.600 $0.800 $0.690 $0.660
ELIM EXT PM & MRKS (8")
LF 2,690.000 $1.000 $1.440 $0.800 $1.500 $1.130 $1.250
ELIM EXT PM & MRKS (12")
LF 1,184.000 $2.000 $2.170 $1.110 $2.250 $1.370 $1.880
ELIM EXT PM & MRKS (24")
LF 1,804.000 $3.000 $4.320 $2.220 $4.500 $2.740 $3.750
ELIM EXT PM & MRKS (ARROW)
EA 25.000 $100.000 $80.670 $83.350 $83.000 $68.620 $70.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 6.000 $100.000 $109.480 $95.000 $113.000 $82.350 $95.000
ELIM EXT PM & MRKS (WORD)
EA 23.000 $100.000 $86.430 $89.000 $90.000 $68.620 $75.000
PAV SURF PREP FOR MRK (6")
LF 5,464.000 $0.300 $0.120 $0.110 $0.150 $0.010 $0.100
PAV SURF PREP FOR MRK (8")
LF 2,507.000 $0.300 $0.150 $0.220 $0.150 $0.140 $0.130
PAV SURF PREP FOR MRK (24")
LF 1,977.000 $0.500 $0.460 $1.110 $0.500 $0.690 $0.400
PAV SURF PREP FOR MRK (ARROW)
EA 29.000 $50.000 $5.760 $27.800 $6.000 $13.720 $5.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 9.000 $50.000 $5.760 $44.450 $6.000 $13.720 $5.000
PAV SURF PREP FOR MRK (WORD)
EA 31.000 $50.000 $5.760 $39.000 $6.000 $13.720 $5.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 4.000 $119.800 $5.760 $61.000 $6.000 $13.720 $5.000
INSTALL HWY TRF SIG (SYSTEM)
EA 4.000 $42,450.000 $55,890.680 $62,152.000 $68,390.000 $58,471.120 $82,000.000
REMOVING TRAFFIC SIGNALS (DIAMOND)
EA 4.000 $10,950.000 $9,746.610 $14,769.000 $13,815.000 $10,673.330 $10,000.000
VEH SIG SEC (12")LED(GRN)
EA 58.000 $260.000 $244.730 $256.000 $310.000 $361.160 $350.000
VEH SIG SEC (12")LED(GRN ARW)
EA 9.000 $265.000 $244.790 $256.000 $313.000 $377.630 $350.000
VEH SIG SEC (12")LED(YEL)
EA 58.000 $260.000 $244.730 $256.000 $310.000 $365.270 $350.000
VEH SIG SEC (12")LED(YEL ARW)
EA 9.000 $265.000 $244.790 $256.000 $313.000 $370.760 $350.000
VEH SIG SEC (12")LED(RED)
EA 58.000 $260.000 $244.730 $256.000 $310.000 $361.160 $350.000
VEH SIG SEC (12")LED(RED ARW)
EA 16.000 $265.000 $244.730 $256.000 $313.000 $370.760 $350.000
PED SIG SEC (LED)(COUNTDOWN)
EA 58.000 $812.000 $557.520 $721.000 $740.000 $920.720 $1,000.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 7.000 $220.000 $199.780 $267.000 $319.000 $278.810 $300.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 60.000 $200.000 $138.120 $243.000 $255.000 $200.580 $300.000
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 18,045.000 $3.500 $1.650 $1.850 $2.000 $2.190 $1.750
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 18,375.000 $3.400 $1.960 $2.300 $2.250 $2.760 $2.050
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 24,007.000 $3.700 $2.300 $2.800 $2.900 $3.340 $2.500
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 1.000 $13,945.000 $12,677.990 $12,990.000 $11,870.000 $15,491.000 $15,500.000
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 3.000 $14,500.000 $12,875.560 $13,233.000 $12,470.000 $15,777.830 $15,700.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 2.000 $15,000.000 $13,514.760 $14,027.000 $13,110.000 $16,542.240 $16,500.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 4.000 $15,700.000 $13,816.930 $14,329.000 $14,080.000 $17,452.570 $16,250.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 1.000 $16,800.000 $13,427.610 $13,619.000 $11,570.000 $16,614.040 $16,555.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 4.000 $17,000.000 $14,717.640 $15,357.000 $16,000.000 $18,680.860 $17,500.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 4.000 $17,500.000 $15,037.260 $15,682.000 $16,700.000 $19,065.120 $18,250.000
INS TRF SIG PL AM(S)2 ARM(44-36')LUM
EA 1.000 $24,800.000 $18,430.900 $19,333.000 $24,800.000 $24,057.920 $21,700.000
INS TRF SIG PL AM(S)2 ARM(55-40')LUM
EA 1.000 $49,225.000 $37,634.820 $35,647.000 $39,750.000 $43,699.530 $39,000.000
PED POLE ASSEMBLY
EA 57.000 $2,965.000 $2,149.420 $3,815.000 $3,685.000 $3,891.390 $2,500.000
PED DETECT PUSH BUTTON (APS)
EA 57.000 $995.000 $729.120 $838.000 $875.000 $1,088.640 $2,000.000
PED DETECTOR CONTROLLER UNIT
EA 4.000 $4,335.000 $3,471.920 $4,302.000 $3,630.000 $4,010.420 $8,500.000
VIVDS PROSR SYS
EA 4.000 $5,000.000 $15,746.470 $12,201.000 $15,050.000 $14,294.020 $6,000.000
VIVDS CAM ASSY FXD LNS
EA 23.000 $7,200.000 $2,398.420 $2,094.000 $2,185.000 $2,680.480 $2,500.000
VIVDS CNTRL SOFTWARE
EA 1.000 $610.000 $10,452.510 $394.000 $425.000 $616.800 $5,000.000
VIVDS CABLING
LF 8,166.000 $2.600 $3.280 $2.250 $1.750 $1.530 $3.000
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 4.000 $9,880.000 $8,324.380 $13,983.000 $8,040.000 $9,982.600 $15,000.000
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 500.000 $2.790 $5.490 $9.100 $6.550 $8.650 $3.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 1.000 $3,300.000 $3,122.370 $504.000 $967.000 $1,928.810 $1,500.000
Totals: $2,795,126.715 $2,464,072.625 $2,864,016.465 $2,892,892.002 $3,015,933.860 $3,120,164.900
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $45,000.00