PREPARING ROW
|
AC
|
1.200
|
$20,000.000
|
$6,000.000
|
$16,000.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
40.000
|
$572.500
|
$400.000
|
$355.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
120.000
|
$15.000
|
$10.000
|
$22.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,820.000
|
$10.000
|
$10.000
|
$6.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
166.700
|
$20.000
|
$10.000
|
$32.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,625.600
|
$15.000
|
$25.000
|
$9.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
250.000
|
$8.000
|
$30.000
|
$32.000
|
|
|
BLOCK SODDING
|
SY
|
2,000.000
|
$4.000
|
$4.000
|
$3.950
|
|
|
STRAW OR HAY MULCH
|
SY
|
2,000.000
|
$0.500
|
$0.400
|
$0.350
|
|
|
BROADCAST SEED (PERM)(SPECIAL MIX)
|
SY
|
2,000.000
|
$0.400
|
$0.400
|
$0.250
|
|
|
FERTILIZER
|
AC
|
1.200
|
$1,100.000
|
$1,100.000
|
$975.000
|
|
|
VEGETATIVE WATERING
|
MG
|
3.600
|
$500.000
|
$150.000
|
$270.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
3,000.000
|
$1.200
|
$1.000
|
$2.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
2,032.000
|
$100.000
|
$110.000
|
$195.000
|
|
|
CEM STABIL BKFL
|
CY
|
94.000
|
$50.000
|
$40.000
|
$90.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
27.500
|
$40.000
|
$40.000
|
$120.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
302.000
|
$6.000
|
$1.000
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.400
|
$550.000
|
$950.000
|
$1,600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
12.300
|
$500.000
|
$950.000
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
86.000
|
$60.000
|
$100.000
|
$110.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
124.000
|
$100.000
|
$120.000
|
$110.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
2.000
|
$7,488.000
|
$6,000.000
|
$15,000.000
|
|
|
MANH (COMPL)(TY B)
|
EA
|
1.000
|
$5,202.160
|
$10,000.000
|
$12,000.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
3.000
|
$1,000.000
|
$650.000
|
$2,500.000
|
|
|
INLET (COMPL)(TY C)
|
EA
|
2.000
|
$4,641.400
|
$6,000.000
|
$9,000.000
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
2.000
|
$600.000
|
$1,000.000
|
$3,500.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
14.000
|
$36.360
|
$40.000
|
$80.000
|
|
|
REMOV STR (PIPE)
|
LF
|
100.000
|
$120.000
|
$20.000
|
$17.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$65,000.000
|
$75,000.000
|
$90,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$5,000.000
|
$15,000.000
|
$15,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,779.000
|
$3.000
|
$1.500
|
$1.950
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,779.000
|
$0.500
|
$0.250
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
200.000
|
$9.000
|
$5.000
|
$7.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$1.500
|
$1.000
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,870.000
|
$10.000
|
$12.000
|
$19.250
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
850.000
|
$5.000
|
$8.000
|
$10.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,870.000
|
$9.000
|
$12.000
|
$19.500
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,700.000
|
$8.000
|
$4.000
|
$12.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
75.000
|
$15.000
|
$10.000
|
$53.000
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
224.000
|
$70.000
|
$75.000
|
$82.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
327.000
|
$70.000
|
$70.000
|
$78.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$1,800.000
|
$2,400.000
|
$3,400.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$1,800.000
|
$1,900.000
|
$2,700.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$30.000
|
$29.000
|
$38.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,375.000
|
$1,700.000
|
$1,600.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,500.000
|
$3,500.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$2,450.000
|
$2,500.000
|
$2,199.140
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,000.000
|
$2,500.000
|
$4,398.270
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$800.000
|
$500.000
|
$2,014.090
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,547.000
|
$10.150
|
$13.000
|
$9.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,547.000
|
$1.100
|
$2.000
|
$1.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,094.000
|
$1.250
|
$2.000
|
$1.800
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$1,130.000
|
$1,100.000
|
$850.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
6.000
|
$600.000
|
$550.000
|
$525.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
10.000
|
$15.000
|
$28.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
2.000
|
$50.000
|
$100.000
|
$90.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
|
EA
|
2.000
|
$103.000
|
$115.000
|
$105.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,700.000
|
$0.800
|
$1.250
|
$1.180
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,250.000
|
$0.800
|
$0.900
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,400.000
|
$0.800
|
$0.900
|
$0.800
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,749.000
|
$0.400
|
$0.010
|
$0.010
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,416.000
|
$0.500
|
$0.010
|
$0.010
|
|
|
PAVEMENT SEALER 12"
|
LF
|
160.000
|
$0.700
|
$0.010
|
$0.010
|
|
|
PAVEMENT SEALER 24"
|
LF
|
60.000
|
$1.000
|
$0.010
|
$0.010
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$25.000
|
$22.000
|
$20.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
6.000
|
$25.000
|
$22.000
|
$20.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
2.000
|
$25.000
|
$22.000
|
$20.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
2.000
|
$25.000
|
$22.000
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$205.000
|
$225.000
|
$210.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$340.000
|
$300.000
|
$270.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
2.000
|
$340.000
|
$300.000
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$250.000
|
$250.000
|
$230.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
55.000
|
$4.000
|
$5.500
|
$5.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
77.000
|
$5.000
|
$5.500
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,749.000
|
$0.490
|
$0.550
|
$0.520
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,613.000
|
$0.680
|
$0.750
|
$0.700
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
120.000
|
$1.100
|
$1.750
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
60.000
|
$1.600
|
$3.250
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$34.000
|
$50.000
|
$45.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
2.000
|
$45.000
|
$50.000
|
$45.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$45.000
|
$50.000
|
$45.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
2.000
|
$45.000
|
$50.000
|
$45.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,749.000
|
$0.200
|
$0.050
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,416.000
|
$0.300
|
$0.050
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
160.000
|
$0.400
|
$0.070
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
60.000
|
$0.500
|
$0.150
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$12.000
|
$5.250
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$14.000
|
$5.250
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
$18.000
|
$5.250
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$12.000
|
$5.250
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
132.000
|
$0.800
|
$0.120
|
$0.100
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
4.000
|
$242.000
|
$220.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$80.000
|
$150.000
|
$150.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
362.000
|
$1.000
|
$1.100
|
$1.050
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
1,387.000
|
$1.000
|
$1.100
|
$1.050
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
1,416.000
|
$1.500
|
$1.750
|
$1.600
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
160.000
|
$4.000
|
$4.750
|
$4.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
60.000
|
$8.000
|
$9.500
|
$9.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$166.000
|
$200.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
32.000
|
$65.000
|
$30.000
|
$40.000
|
|
Totals: |
$676,107.400
|
$750,384.490
|
$1,041,545.320
|