Show Job Controls
Bid Cobra

HARRIS IH 45 (0110-05-127)

Items: 100

County: HARRIS
Length: N/A
Highway: IH 45
District: HOUSTON
Control Number: 0110-05-127
DBE Goal: N/A
Project: C 110-5-127
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $676,107.40
Date: 09/02/2021 (4 years ago)
Contract Number: N/A
Type: ADD LEFT AND RIGHT TURN LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$676,107.40
$750,384.49
Over/Under Est: 10.99% $74,277.09
Over/Under Est: 54.05% $365,437.92
Amt Left: 38.8% $291,160.83

Bid Items & Bid Tabulations

100 Total 0 of 100
HARRIS  |  IH 45  |  HOUSTON  |  0110-05-127  |  09/02/2021  |  $676,107.40  |  C 110-5-127  |  ADD LEFT AND RIGHT TURN LANES  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAIN LANE INDUSTRIES LTD.
FORDE CONSTRUCTION COMPANY, INC.
PREPARING ROW
AC 1.200 $20,000.000 $6,000.000 $16,000.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 40.000 $572.500 $400.000 $355.000
REMOVING CONC (DRIVEWAYS)
SY 120.000 $15.000 $10.000 $22.000
REMOVING CONC (CURB)
LF 1,820.000 $10.000 $10.000 $6.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 166.700 $20.000 $10.000 $32.000
EXCAVATION (ROADWAY)
CY 1,625.600 $15.000 $25.000 $9.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 250.000 $8.000 $30.000 $32.000
BLOCK SODDING
SY 2,000.000 $4.000 $4.000 $3.950
STRAW OR HAY MULCH
SY 2,000.000 $0.500 $0.400 $0.350
BROADCAST SEED (PERM)(SPECIAL MIX)
SY 2,000.000 $0.400 $0.400 $0.250
FERTILIZER
AC 1.200 $1,100.000 $1,100.000 $975.000
VEGETATIVE WATERING
MG 3.600 $500.000 $150.000 $270.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 3,000.000 $1.200 $1.000 $2.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 2,032.000 $100.000 $110.000 $195.000
CEM STABIL BKFL
CY 94.000 $50.000 $40.000 $90.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 27.500 $40.000 $40.000 $120.000
TRENCH EXCAVATION PROTECTION
LF 302.000 $6.000 $1.000 $10.000
RIPRAP (CONC)(4 IN)
CY 5.400 $550.000 $950.000 $1,600.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.300 $500.000 $950.000 $1,100.000
RC PIPE (CL III)(18 IN)
LF 86.000 $60.000 $100.000 $110.000
RC PIPE (CL III)(24 IN)
LF 124.000 $100.000 $120.000 $110.000
INLET (COMPL)(TY AAD)
EA 2.000 $7,488.000 $6,000.000 $15,000.000
MANH (COMPL)(TY B)
EA 1.000 $5,202.160 $10,000.000 $12,000.000
INLET (COMPL)(EXT TY C)
EA 3.000 $1,000.000 $650.000 $2,500.000
INLET (COMPL)(TY C)
EA 2.000 $4,641.400 $6,000.000 $9,000.000
ADJUSTING MANHOLES & INLETS
EA 2.000 $600.000 $1,000.000 $3,500.000
PIPE (PVC) (SCH 40) (6 IN)
LF 14.000 $36.360 $40.000 $80.000
REMOV STR (PIPE)
LF 100.000 $120.000 $20.000 $17.000
MOBILIZATION
LS 1.000 $65,000.000 $75,000.000 $90,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $15,000.000 $15,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,779.000 $3.000 $1.500 $1.950
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,779.000 $0.500 $0.250 $1.050
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $9.000 $5.000 $7.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.500 $1.000 $1.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,870.000 $10.000 $12.000 $19.250
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 850.000 $5.000 $8.000 $10.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,870.000 $9.000 $12.000 $19.500
CONC CURB (MONO) (TY II)
LF 1,700.000 $8.000 $4.000 $12.000
CONC CURB (DOWEL)
LF 75.000 $15.000 $10.000 $53.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 224.000 $70.000 $75.000 $82.000
CONC SIDEWALKS (4")
SY 327.000 $70.000 $70.000 $78.000
CURB RAMPS (TY 2)
EA 1.000 $1,800.000 $2,400.000 $3,400.000
CURB RAMPS (TY 7)
EA 2.000 $1,800.000 $1,900.000 $2,700.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $30.000 $29.000 $38.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,375.000 $1,700.000 $1,600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,500.000 $3,500.000 $3,200.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,450.000 $2,500.000 $2,199.140
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,000.000 $2,500.000 $4,398.270
CRASH CUSH ATTEN (STKPL)
EA 2.000 $800.000 $500.000 $2,014.090
CONDT (PVC) (SCH 80) (2")
LF 1,547.000 $10.150 $13.000 $9.000
ELEC CONDR (NO.8) BARE
LF 1,547.000 $1.100 $2.000 $1.500
ELEC CONDR (NO.8) INSULATED
LF 3,094.000 $1.250 $2.000 $1.800
GROUND BOX TY D (162922)W/APRON
EA 4.000 $1,130.000 $1,100.000 $850.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 6.000 $600.000 $550.000 $525.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 10.000 $15.000 $28.000 $35.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 2.000 $50.000 $100.000 $90.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 2.000 $103.000 $115.000 $105.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,700.000 $0.800 $1.250 $1.180
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,250.000 $0.800 $0.900 $0.800
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,400.000 $0.800 $0.900 $0.800
PAVEMENT SEALER 6"
LF 1,749.000 $0.400 $0.010 $0.010
PAVEMENT SEALER 8"
LF 1,416.000 $0.500 $0.010 $0.010
PAVEMENT SEALER 12"
LF 160.000 $0.700 $0.010 $0.010
PAVEMENT SEALER 24"
LF 60.000 $1.000 $0.010 $0.010
PAVEMENT SEALER (ARROW)
EA 4.000 $25.000 $22.000 $20.000
PAVEMENT SEALER (WORD)
EA 6.000 $25.000 $22.000 $20.000
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $25.000 $22.000 $20.000
PAVEMENT SEALER (UTURN ARROW)
EA 2.000 $25.000 $22.000 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $205.000 $225.000 $210.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $340.000 $300.000 $270.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 2.000 $340.000 $300.000 $275.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $250.000 $250.000 $230.000
REFL PAV MRKR TY I-C
EA 55.000 $4.000 $5.500 $5.250
REFL PAV MRKR TY II-C-R
EA 77.000 $5.000 $5.500 $5.250
ELIM EXT PAV MRK & MRKS (6")
LF 1,749.000 $0.490 $0.550 $0.520
ELIM EXT PAV MRK & MRKS (8")
LF 1,613.000 $0.680 $0.750 $0.700
ELIM EXT PAV MRK & MRKS (12")
LF 120.000 $1.100 $1.750 $1.500
ELIM EXT PAV MRK & MRKS (24")
LF 60.000 $1.600 $3.250 $3.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $34.000 $50.000 $45.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 2.000 $45.000 $50.000 $45.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $45.000 $50.000 $45.000
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
EA 2.000 $45.000 $50.000 $45.000
PAV SURF PREP FOR MRK (6")
LF 1,749.000 $0.200 $0.050 $0.030
PAV SURF PREP FOR MRK (8")
LF 1,416.000 $0.300 $0.050 $0.040
PAV SURF PREP FOR MRK (12")
LF 160.000 $0.400 $0.070 $0.060
PAV SURF PREP FOR MRK (24")
LF 60.000 $0.500 $0.150 $0.120
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $12.000 $5.250 $5.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $14.000 $5.250 $5.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 2.000 $18.000 $5.250 $5.000
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $12.000 $5.250 $5.000
PAV SURF PREP FOR MRK (RPM)
EA 132.000 $0.800 $0.120 $0.100
REMOVAL OF GROUND BOXES
EA 4.000 $242.000 $220.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $80.000 $150.000 $150.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 362.000 $1.000 $1.100 $1.050
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 1,387.000 $1.000 $1.100 $1.050
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 1,416.000 $1.500 $1.750 $1.600
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 160.000 $4.000 $4.750 $4.500
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 60.000 $8.000 $9.500 $9.000
TMA (STATIONARY)
DAY 90.000 $166.000 $200.000 $350.000
TMA (MOBILE OPERATION)
HR 32.000 $65.000 $30.000 $40.000
Totals: $676,107.400 $750,384.490 $1,041,545.320