PREPARING ROW
|
AC
|
5.110
|
$9,200.000
|
$5,007.000
|
$20,000.000
|
$14,695.110
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
6,025.000
|
$11.000
|
$23.000
|
$10.000
|
$4.830
|
|
|
REMOVING CONC (CURB)
|
LF
|
381.200
|
$4.000
|
$3.500
|
$9.000
|
$16.160
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
649.000
|
$10.000
|
$17.000
|
$15.000
|
$14.800
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
114.500
|
$750.000
|
$1,250.000
|
$2,500.000
|
$1,170.440
|
|
|
BLOCK SODDING
|
SY
|
24,800.000
|
$4.000
|
$5.000
|
$4.600
|
$3.020
|
|
|
VEGETATIVE WATERING
|
MG
|
614.880
|
$18.000
|
$15.000
|
$25.000
|
$7.390
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
6,637.390
|
$71.000
|
$124.000
|
$110.000
|
$135.670
|
|
|
CEM STABIL BKFL
|
CY
|
11.130
|
$38.000
|
$45.000
|
$45.000
|
$75.940
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
72.500
|
$39.400
|
$45.000
|
$45.000
|
$58.870
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
82.000
|
$96.180
|
$96.000
|
$115.000
|
$84.130
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
232.000
|
$700.000
|
$591.000
|
$600.000
|
$396.990
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
4,477.990
|
$400.000
|
$273.000
|
$370.000
|
$367.820
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
9.000
|
$135.000
|
$265.000
|
$700.000
|
$204.960
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
23.000
|
$600.000
|
$798.000
|
$2,500.000
|
$1,100.020
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
17.000
|
$62.500
|
$250.000
|
$200.000
|
$306.100
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
106.000
|
$71.660
|
$159.000
|
$225.000
|
$106.280
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
41.000
|
$80.000
|
$176.000
|
$250.000
|
$193.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
131.000
|
$99.500
|
$209.000
|
$300.000
|
$157.910
|
|
|
MANH (COMPL)(TY A)
|
EA
|
4.000
|
$5,000.000
|
$6,000.000
|
$6,800.000
|
$5,809.040
|
|
|
INLET (STG II)(TY AD)
|
EA
|
4.000
|
$1,884.420
|
$5,500.000
|
$5,000.000
|
$6,758.710
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
2.000
|
$45,657.220
|
$32,815.000
|
$50,000.000
|
$45,857.920
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,200.000
|
$921.000
|
$1,800.000
|
$3,397.860
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
7.000
|
$1,170.000
|
$1,193.000
|
$1,700.000
|
$1,522.300
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$4,392.000
|
$4,305.000
|
$5,200.000
|
$4,822.370
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
1.000
|
$480.000
|
$1,500.000
|
$1,500.000
|
$3,950.720
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$400.000
|
$2,500.000
|
$800.000
|
$1,152.840
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,100.000
|
$2,512.000
|
$2,000.000
|
$2,775.020
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,200.000
|
$2,512.000
|
$5,000.000
|
$2,775.020
|
|
|
REMOV STR (PIPE)
|
LF
|
134.000
|
$19.000
|
$26.000
|
$35.000
|
$23.260
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
26.000
|
$49.000
|
$160.000
|
$150.000
|
$65.990
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$510,812.000
|
$560,000.000
|
$690,000.000
|
$696,838.030
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$12,000.000
|
$2,500.000
|
$10,000.000
|
$14,800.100
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,024.000
|
$2.340
|
$1.500
|
$5.000
|
$1.870
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,024.000
|
$0.740
|
$0.600
|
$1.000
|
$0.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
333.000
|
$3.160
|
$2.750
|
$4.000
|
$3.470
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
333.000
|
$0.820
|
$1.000
|
$1.500
|
$1.140
|
|
|
CONC CURB (DOWEL)
|
LF
|
61,527.000
|
$5.600
|
$7.000
|
$10.000
|
$16.650
|
|
|
DRIVEWAYS (ACP)
|
SY
|
123.690
|
$200.000
|
$154.000
|
$130.000
|
$178.830
|
|
|
INTERSECTIONS (CONC) (FAST TRACK)
|
SY
|
6.600
|
$100.000
|
$1,500.000
|
$500.000
|
$379.430
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
13,681.000
|
$0.390
|
$1.000
|
$2.000
|
$0.360
|
|
|
CONC DIRECTIONAL ISLAND (12")
|
LF
|
22,493.000
|
$22.000
|
$22.000
|
$37.000
|
$27.700
|
|
|
CONC DIRECTIONAL ISLAND (24")
|
LF
|
1,143.000
|
$25.000
|
$32.000
|
$43.000
|
$34.030
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
975.000
|
$20.000
|
$20.000
|
$22.000
|
$39.710
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,500.000
|
$1,196.000
|
$1,300.000
|
$3,165.820
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,601.250
|
$3,500.000
|
$3,000.000
|
$4,170.590
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
1,034.560
|
$20.000
|
$20.000
|
$18.450
|
$37.420
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$500.000
|
$479.000
|
$470.000
|
$603.780
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
43.000
|
$700.000
|
$479.000
|
$470.000
|
$999.450
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$900.000
|
$627.000
|
$615.000
|
$958.320
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
23.000
|
$400.000
|
$505.000
|
$495.000
|
$644.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
|
EA
|
31.000
|
$500.000
|
$505.000
|
$495.000
|
$768.130
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
291.000
|
$0.300
|
$1.530
|
$1.000
|
$1.230
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
11,714.000
|
$0.500
|
$0.660
|
$0.730
|
$0.840
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
33,396.000
|
$1.040
|
$0.870
|
$0.880
|
$0.760
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
7,163.000
|
$2.900
|
$1.480
|
$2.580
|
$2.590
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,634.000
|
$6.070
|
$3.570
|
$5.880
|
$4.670
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
238.000
|
$3.450
|
$1.840
|
$2.580
|
$2.960
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
36,757.000
|
$0.690
|
$0.450
|
$0.630
|
$0.590
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
37,490.000
|
$1.120
|
$0.820
|
$1.250
|
$0.490
|
|
|
PAVEMENT SEALER 4"
|
LF
|
18,104.000
|
$0.200
|
$0.050
|
$0.120
|
$0.040
|
|
|
PAVEMENT SEALER 6"
|
LF
|
10,552.000
|
$0.200
|
$0.080
|
$0.160
|
$0.060
|
|
|
PAVEMENT SEALER 8"
|
LF
|
3,480.000
|
$0.230
|
$0.120
|
$0.200
|
$0.110
|
|
|
PAVEMENT SEALER 12"
|
LF
|
4,573.000
|
$0.680
|
$0.160
|
$0.260
|
$0.150
|
|
|
PAVEMENT SEALER 24"
|
LF
|
303.000
|
$1.200
|
$0.330
|
$0.500
|
$0.250
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
23.000
|
$38.000
|
$7.100
|
$12.000
|
$12.330
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
20.000
|
$37.000
|
$7.100
|
$12.000
|
$12.330
|
|
|
PAVEMENT SEALER (BIKE ARROW)
|
EA
|
6.000
|
$22.000
|
$7.100
|
$12.000
|
$12.330
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
6.000
|
$22.000
|
$7.100
|
$12.000
|
$12.330
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,830.000
|
$0.790
|
$0.510
|
$0.450
|
$0.330
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
136,013.000
|
$0.500
|
$0.410
|
$0.430
|
$0.300
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
36,757.000
|
$0.530
|
$0.460
|
$0.520
|
$0.380
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,608.000
|
$0.450
|
$0.460
|
$0.620
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
95,918.000
|
$0.480
|
$0.410
|
$0.520
|
$0.380
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
131,520.000
|
$0.650
|
$0.360
|
$0.650
|
$0.570
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
202.000
|
$204.000
|
$219.000
|
$180.000
|
$222.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$350.000
|
$438.000
|
$350.000
|
$493.340
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
202.000
|
$250.000
|
$291.000
|
$180.000
|
$271.340
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$575.000
|
$438.000
|
$500.000
|
$801.670
|
|
PREFAB PAV MRK TY C (W)(BIKE ARROW)
|
EA
|
113.000
|
$165.000
|
$219.000
|
$70.000
|
$148.000
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
113.000
|
$165.000
|
$1.940
|
$160.000
|
$160.330
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,409.000
|
$4.000
|
$3.820
|
$4.200
|
$3.820
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,513.000
|
$3.870
|
$3.820
|
$4.150
|
$3.820
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
402,859.000
|
$0.320
|
$0.250
|
$0.180
|
$0.220
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
131,423.000
|
$0.400
|
$0.310
|
$0.200
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
9,880.000
|
$0.520
|
$0.460
|
$0.250
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
6,672.000
|
$1.230
|
$0.760
|
$0.280
|
$1.170
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,284.000
|
$2.100
|
$1.430
|
$0.330
|
$104.830
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
89.000
|
$46.000
|
$30.600
|
$20.000
|
$18.500
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
87.000
|
$50.000
|
$30.600
|
$20.000
|
$24.670
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
281,368.000
|
$0.050
|
$0.040
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
171,040.000
|
$0.070
|
$0.060
|
$0.010
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
33,396.000
|
$0.150
|
$0.080
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
44,891.000
|
$0.190
|
$0.100
|
$0.100
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,634.000
|
$0.500
|
$0.200
|
$0.200
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
203.000
|
$9.460
|
$5.100
|
$5.000
|
$3.700
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
202.000
|
$10.500
|
$5.100
|
$5.000
|
$4.930
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
1.000
|
$18.500
|
$10.000
|
$5.000
|
$30.830
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
113.000
|
$5.000
|
$10.000
|
$5.000
|
$2.470
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
113.000
|
$5.000
|
$10.000
|
$5.000
|
$2.470
|
|
|
TACK COAT
|
GAL
|
324.910
|
$3.350
|
$3.700
|
$5.000
|
$4.320
|
|
|
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
|
TON
|
485.960
|
$109.000
|
$159.000
|
$250.000
|
$185.000
|
|
|
D-GR HMA TY-D PG70-22(LEVEL-UP)(EXEMPT)
|
TON
|
564.580
|
$161.000
|
$159.000
|
$250.000
|
$185.000
|
|
|
TMA (STATIONARY)
|
DAY
|
190.000
|
$200.000
|
$346.000
|
$600.000
|
$123.330
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
9.000
|
$350.000
|
$750.000
|
$600.000
|
$148.000
|
|
Totals: |
$5,618,935.988
|
$5,450,259.587
|
$6,965,912.302
|
$7,013,146.175
|