Show Job Controls
Bid Cobra

HARRIS SH 3 (0051-02-101)

Items: 203

County: HARRIS
Length: N/A
Highway: SH 3
District: HOUSTON
Control Number: 0051-02-101
DBE Goal: N/A
Project: STP 2019(765)TAP
Guaranty: N/A
Time: 600 WORKING DAYS
Engineer's Estimate: $12,575,140.51
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: ADD BIKE LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$12,575,140.51
$13,951,959.60
Over/Under Est: 10.95% $1,376,819.09
Over/Under Est: 16.08% $2,022,596.92
Amt Left: 4.63% $645,777.83

Bid Items & Bid Tabulations

203 Total 0 of 203
HARRIS  |  SH 3  |  HOUSTON  |  0051-02-101  |  04/03/2019  |  $12,575,140.51  |  STP 2019(765)TAP  |  ADD BIKE LANES  |  600 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
DURWOOD GREENE CONSTRUCTION CO.
PREPARING ROW
AC 8.660 $10,000.000 $28,000.000 $7,500.000
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 6.000 $1,000.000 $330.000 $900.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 1.000 $2,250.000 $995.000 $2,500.000
REMOVING CONC (MEDIANS)
SY 2,728.000 $5.000 $3.850 $90.000
REMOVING CONC (SIDEWALKS)
SY 226.000 $7.000 $5.650 $35.000
REMOVING CONC (DRIVEWAYS)
SY 5,005.000 $8.000 $4.850 $25.000
REMOVING CONC (CTB)
LF 120.000 $15.000 $11.000 $30.000
REMOVING CONC (MISC)
SY 4.000 $30.000 $82.000 $35.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 478.000 $5.000 $2.700 $35.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 188.000 $30.000 $4.900 $35.000
REMOVING CONCRETE(MOW STRIP)
LF 287.000 $15.000 $6.550 $35.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 547.000 $5.000 $8.400 $23.000
REMOVING STAB BASE & ASPH PAV (18")
SY 6,519.000 $9.000 $1.200 $25.000
EXCAVATION (SPECIAL)
CY 1,041.000 $25.000 $26.000 $45.000
SUBGRADE WIDENING (DENS CONT)
STA 597.270 $560.000 $150.000 $600.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 1,001.000 $6.500 $27.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,882.000 $8.000 $12.200 $20.000
FURNISHING AND PLACING TOPSOIL
CY 613.000 $30.000 $56.150 $25.000
EROSION CONTROL COMPOST
CY 18.000 $27.000 $70.000 $50.000
GENERAL USE COMPOST
CY 69.000 $29.000 $70.000 $50.000
BLOCK SODDING
SY 64,195.000 $3.000 $3.500 $2.750
FERTILIZER
AC 13.440 $850.000 $2,750.000 $650.000
VEGETATIVE WATERING
MG 1,612.800 $18.000 $16.000 $25.000
IRRIGATION SYSTEM (TY II)
LS 1.000 $80,000.000 $58,815.000 $54,000.000
PLANT MATERIAL (1-GAL)
EA 3,433.000 $7.500 $12.000 $7.500
PLANT MATERIAL (3-GAL)
EA 533.000 $18.000 $26.000 $25.000
PLANT MATERIAL (30 GAL) (TREE)
EA 46.000 $300.000 $280.000 $300.000
PLANT BED PREP (TYPE II)
SY 1,719.000 $2.000 $2.950 $4.000
PLANT BED PREP (TYPE IV)
SY 1,350.000 $3.000 $2.950 $5.000
LIME TRT (EXST MATL) (6")
SY 7,358.000 $2.000 $4.350 $5.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 99.000 $165.000 $200.000 $200.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 263.000 $30.000 $23.000 $50.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 31,961.000 $65.000 $100.000 $80.000
ASPH (AC-20-5TR)
GAL 96,440.000 $3.000 $3.500 $3.750
AGGR(TY-PL GR-5 SAC-B)
CY 4,037.000 $98.000 $156.000 $130.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 3,563.000 $115.000 $150.000 $105.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 1,991.000 $115.000 $100.000 $102.000
TOM (ASPHALT) PG 76-22
TON 1,498.000 $110.000 $125.000 $150.000
TOM - F (AGGREGATE) SAC - A
TON 20,636.000 $110.000 $125.000 $150.000
PLANE ASPH CONC PAV (1.5")
SY 19,048.000 $3.000 $3.000 $5.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 208.000 $65.000 $100.000 $150.000
CEM STABIL BKFL
CY 1,019.000 $40.000 $51.350 $70.000
CUT & RESTORING PAV
SY 30.000 $92.000 $94.000 $300.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 57.000 $260.000 $245.000 $340.000
CL C CONC (COLLAR)
EA 6.000 $450.000 $1,115.000 $3,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 41.000 $500.000 $730.000 $1,100.000
RETROFIT RAIL (TY C221)
LF 120.000 $350.000 $285.000 $100.000
CONC BOX CULV (7 FT X 2 FT)
LF 381.000 $350.000 $390.000 $450.000
CONC BOX CULV (10 FT X 3 FT)
LF 112.000 $650.000 $680.000 $900.000
RC PIPE (CL III)(18 IN)
LF 13.000 $60.000 $101.000 $160.000
RC PIPE (CL III)(30 IN)
LF 46.000 $75.000 $98.000 $180.000
RC PIPE (CL III)(42 IN)
LF 718.000 $130.000 $154.000 $195.000
INLET (COMPL)(TY AAD)
EA 1.000 $4,400.000 $8,500.000 $6,700.000
MANH (COMPL)(TY A)
EA 1.000 $4,230.000 $3,510.000 $4,500.000
JCT BOX (COMPL)(SPL)
EA 1.000 $23,650.000 $15,885.000 $14,000.000
INLET (STAGE II)(TY AD) (SPECIAL)
EA 1.000 $3,000.000 $1,440.000 $1,500.000
SET (TY I)(S= 7 FT)(HW= 3 FT)(6:1) (P)
EA 1.000 $10,500.000 $8,075.000 $10,000.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 2.000 $6,700.000 $7,015.000 $7,000.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 2.000 $300.000 $845.000 $900.000
PIPE (PVC) (SCH 40) (8 IN)
LF 11.000 $100.000 $56.000 $50.000
REMOV STR (SET)
EA 14.000 $365.000 $305.000 $1,800.000
REMOV STR (PIPE)
LF 64.000 $20.000 $16.250 $25.000
MOBILIZATION
LS 1.000 $1,109,579.000 $1,000,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $6,000.000 $1,390.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 210.000 $45.000 $26.300 $50.000
ROCK FILTER DAMS (REMOVE)
LF 210.000 $10.000 $11.700 $16.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $30.000 $28.000 $32.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.000 $16.400 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 59,893.000 $2.500 $1.600 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 59,893.000 $1.000 $0.600 $0.750
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 138.000 $8.000 $3.200 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 536.000 $8.000 $3.500 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 674.000 $2.000 $1.200 $4.000
PORT CTB (ALIGNING)
LF 175.000 $15.000 $16.400 $18.000
LANDSCAPE PAVERS
SY 1,315.000 $55.000 $78.000 $110.000
CONC CURB (DOWEL)(SLOTTED)
LF 45.000 $20.000 $16.000 $50.000
CONC CURB (DOWEL)
LF 185.000 $15.000 $16.000 $40.000
DRIVEWAYS (ACP)
SY 17,209.000 $30.000 $16.700 $18.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 4,925.000 $75.000 $79.000 $75.000
CONC SIDEWALKS (6")
SY 3,135.000 $60.000 $61.000 $65.000
CURB RAMPS (TY 1)
SY 216.000 $120.000 $135.000 $450.000
CURB RAMPS (TY 5)
SY 115.000 $150.000 $135.000 $550.000
CURB RAMPS (TY 7)
SY 11.000 $120.000 $240.000 $550.000
CONC MEDIAN
LF 3,769.000 $55.000 $75.000 $120.000
MTL W-BEAM GD FEN (TIM POST)
LF 750.000 $30.000 $27.500 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $2,140.000 $2,600.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $30.000 $27.000 $20.000
SHORT RADIUS
LF 25.000 $30.000 $41.000 $60.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,500.000 $1,460.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 675.000 $5.000 $5.850 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $585.000 $375.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $400.000 $410.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $2,800.000 $3,210.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $300.000 $290.000 $400.000
CONDT (PVC) (SCH 80) (2")
LF 14,235.000 $7.950 $8.200 $8.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,610.000 $12.500 $12.650 $12.500
CONDT (PVC) (SCH 80) (3")
LF 465.000 $12.100 $11.500 $11.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 365.000 $20.350 $22.250 $22.000
CONDT (PVC) (SCH 80) (4")
LF 15.000 $16.550 $11.250 $11.000
ELEC CONDR (NO.6) BARE
LF 17,600.000 $1.400 $1.050 $1.000
ELEC CONDR (NO.4) BARE
LF 15.000 $1.750 $1.950 $2.000
ELEC CONDR (NO.4) INSULATED
LF 25.000 $1.850 $1.800 $2.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 655.000 $1.900 $2.000 $1.900
GROUND BOX TY D (162922)W/APRON
EA 111.000 $900.000 $1,070.000 $1,000.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 60.000 $3.000 $2.950 $3.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 120.000 $3.950 $3.500 $3.500
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $4,895.000 $3,185.000 $3,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 101.000 $500.000 $410.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $500.000 $410.000 $520.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 52.000 $500.000 $525.000 $530.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $600.000 $760.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $700.000 $925.000 $1,050.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 61.000 $375.000 $410.000 $330.000
RELOCATE SM RD SN SUP&AM TY S80
EA 140.000 $400.000 $525.000 $330.000
REMOVE SM RD SN SUP&AM
EA 82.000 $85.000 $76.000 $125.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 5,167.000 $0.180 $0.300 $0.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 401,481.000 $0.150 $0.250 $0.200
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 49,846.000 $0.200 $0.400 $0.350
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 1,966.000 $0.200 $0.400 $0.350
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 14,506.000 $0.360 $0.600 $0.500
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 28,462.000 $0.790 $0.900 $0.750
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 2,957.000 $1.900 $1.750 $1.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 210.000 $52.000 $50.000 $42.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 2.000 $200.000 $175.000 $150.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 124.000 $66.000 $58.000 $50.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 10,338.000 $0.200 $0.400 $0.350
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 143,128.000 $0.180 $0.400 $0.350
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 9,740.000 $1.100 $0.900 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 14,506.000 $1.200 $0.900 $0.750
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 28,462.000 $3.100 $2.600 $2.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,957.000 $5.800 $5.150 $4.400
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 9,740.000 $3.000 $2.600 $2.200
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 49,811.000 $0.670 $0.750 $0.650
REFL PAV MRK TY II (Y) 12" (SLD)
LF 6,010.000 $1.200 $0.900 $0.750
PAVEMENT SEALER 4"
LF 30,990.000 $0.150 $0.070 $0.060
PAVEMENT SEALER 6"
LF 15,491.000 $0.250 $0.110 $0.090
PAVEMENT SEALER 8"
LF 1,416.000 $0.380 $0.140 $0.120
PAVEMENT SEALER 12"
LF 5,399.000 $0.900 $0.200 $0.180
PAVEMENT SEALER 24"
LF 246.000 $2.300 $0.300 $0.240
PAVEMENT SEALER (ARROW)
EA 19.000 $25.000 $5.850 $5.000
PAVEMENT SEALER (WORD)
EA 19.000 $35.000 $8.200 $7.000
PAVEMENT SEALER (BIKE ARROW)
EA 28.000 $100.530 $8.200 $7.000
PAVEMENT SEALER (BIKE SYMBOL)
EA 28.000 $129.660 $8.200 $7.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,167.000 $0.590 $0.400 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 263,634.000 $0.290 $0.300 $0.260
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 49,846.000 $0.570 $0.400 $0.350
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,966.000 $1.250 $0.400 $0.330
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 10,338.000 $0.450 $0.400 $0.350
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 143,128.000 $0.510 $0.400 $0.320
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 137,847.000 $0.650 $0.900 $0.740
PREFAB PAV MRK TY C (W) (ARROW)
EA 210.000 $250.000 $230.000 $195.000
PREFAB PAV MRK TY C (W) (WORD)
EA 124.000 $320.000 $290.000 $250.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $590.000 $585.000 $500.000
PREFAB PAV MRK TY C (W)(BIKE ARROW)
EA 315.000 $180.000 $215.000 $185.000
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
EA 316.000 $180.000 $290.000 $250.000
REFL PAV MRKR TY I-C
EA 3,216.000 $3.730 $4.600 $3.950
REFL PAV MRKR TY II-A-A
EA 6,089.000 $3.870 $4.600 $3.950
ELIM EXT PAV MRK & MRKS (6")
LF 26,451.000 $0.440 $0.450 $0.380
ELIM EXT PAV MRK & MRKS (8")
LF 1,416.000 $0.300 $0.600 $0.500
ELIM EXT PAV MRK & MRKS (12")
LF 3,129.000 $1.000 $0.900 $0.750
ELIM EXT PAV MRK & MRKS (24")
LF 1,305.000 $2.370 $1.750 $1.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 19.000 $47.290 $41.000 $35.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 19.000 $47.290 $41.000 $35.000
PAV SURF PREP FOR MRK (4")
LF 406,647.000 $0.070 $0.010 $0.010
PAV SURF PREP FOR MRK (6")
LF 255,088.000 $0.030 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 14,506.000 $0.070 $0.050 $0.040
PAV SURF PREP FOR MRK (12")
LF 38,201.000 $0.120 $0.070 $0.060
PAV SURF PREP FOR MRK (24")
LF 2,957.000 $1.000 $0.150 $0.120
PAV SURF PREP FOR MRK (ARROW)
EA 210.000 $15.430 $3.500 $3.000
PAV SURF PREP FOR MRK (WORD)
EA 124.000 $15.430 $3.500 $3.000
PAV SURF PREP FOR MRK (RR XING)
EA 2.000 $44.100 $5.850 $5.000
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 315.000 $4.000 $3.500 $3.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 316.000 $4.000 $3.500 $3.000
INSTALL HWY TRF SIG (ISOLATED)
EA 2.000 $30,405.000 $37,420.000 $35,000.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $3,880.000 $2,885.000 $3,000.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $215.000 $235.000 $220.000
VEH SIG SEC (12")LED(GRN ARW)
EA 1.000 $210.000 $235.000 $220.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $215.000 $235.000 $220.000
VEH SIG SEC (12")LED(YEL ARW)
EA 1.000 $215.000 $235.000 $220.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $215.000 $235.000 $220.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $210.000 $235.000 $220.000
PED SIG SEC (LED)(2 INDICATIONS)
EA 2.000 $335.000 $610.000 $600.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $430.000 $625.000 $650.000
BACK PLATE (12")(3 SEC)
EA 8.000 $95.000 $82.000 $80.000
BACK PLATE (12")(4 SEC)
EA 1.000 $105.000 $110.000 $110.000
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 580.000 $1.250 $1.100 $1.100
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 590.000 $1.450 $1.150 $1.200
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 2,305.000 $1.800 $1.300 $1.300
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 69,150.000 $1.200 $0.900 $0.850
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 1.000 $5,555.000 $9,800.000 $8,700.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $7,565.000 $10,350.000 $9,700.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $6,190.000 $9,750.000 $9,000.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $8,460.000 $13,730.000 $12,700.000
PED DETECT PUSH BUTTON (APS)
EA 1.000 $705.000 $630.000 $600.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,150.000 $3,815.000 $3,700.000
VEH LP DETECT (SAWCUT)
LF 24,020.000 $11.850 $10.000 $9.500
LANDSCAPE SOIL AMENDMENT (TYPE I)
SY 1,719.000 $1.000 $0.600 $1.000
LANDSCAPE SOIL AMENDMENT (TYPE II)
SY 2,700.000 $1.000 $0.600 $1.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,426.000 $40.000 $11.000 $100.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $6,590.000 $8,620.000 $7,700.000
GPS COMMUNICATIONS UNIT
EA 1.000 $815.000 $885.000 $800.000
TMA (STATIONARY)
DAY 443.000 $278.000 $90.000 $150.000
TMA (MOBILE OPERATION)
DAY 153.000 $300.000 $290.000 $150.000
Totals: $12,575,140.510 $13,951,959.600 $14,597,737.430