Show Job Controls
Bid Cobra

HARRIS US 290 (0050-06-092)

Items: 258

County: HARRIS
Length: 0.0000 MILES
Highway: US 290
District: HOUSTON
Control Number: 0050-06-092
DBE Goal: 0.0%
Project: STP 2026(278)MM
Guaranty: $100,000.00
Time: 864 WORKING DAYS
Engineer's Estimate: $78,925,854.11
Date: 02/04/2026 (4 months ago)
Contract Number: 2263001
Type: HIGHWAY IMPROVEMENT
Project ID: A00121975
Contract Type: Federal
Project Description: CONSTRUCT 6-LANE UNDERPASS WITH SIDEWALKS AND BIKEWAYS WITHIN THE ROW EXTENDING UNDER US 290 AND THE UP RAILROAD CONNECTING TO SKINNER ROAD TO THE NORTH
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
HAMOON BAHRAMI
WILLIAM BURCH
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (10)
E
Engineer's Estimate
$78,925,854.11
$74,036,474.93
Over/Under Est: -6.19% -$4,889,379.18
Over/Under Est: -0.18% -$142,415.55
Amt Left: 6.41% $4,746,963.63
$79,474,317.65
Over/Under Est: 0.69% $548,463.54
Amt Left: 7.34% $5,437,842.72
Delta: -0.88% -$690,879.09
Over/Under Est: 0.77% $607,180.67
Amt Left: 7.42% $5,496,559.85
Delta: -0.07% -$58,717.13
Over/Under Est: 1.91% $1,510,271.47
Amt Left: 8.64% $6,399,650.65
Delta: -1.14% -$903,090.80
$84,127,222.00
Over/Under Est: 6.59% $5,201,367.89
Amt Left: 13.63% $10,090,747.07
Delta: -4.59% -$3,691,096.42
$88,136,213.64
Over/Under Est: 11.67% $9,210,359.53
Amt Left: 19.04% $14,099,738.71
Delta: -4.77% -$4,008,991.64
Over/Under Est: 14.49% $11,433,849.45
Amt Left: 22.05% $16,323,228.63
Delta: -2.52% -$2,223,489.92
Over/Under Est: 20.37% $16,074,905.66
Amt Left: 28.32% $20,964,284.84
Delta: -5.14% -$4,641,056.21
Over/Under Est: 24% $18,945,200.87
Amt Left: 32.19% $23,834,580.05
Delta: -3.02% -$2,870,295.21

Bid Items & Bid Tabulations

258 Total 0 of 258
HARRIS  |  US 290  |  HOUSTON  |  0050-06-092  |  02/04/2026  |  $78,925,854.11  |  STP 2026(278)MM  |  HWY IMPRV  |  864 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HARPER BROTHERS CONSTRUCTION LLC
R CONSTRUCTION CIVIL, LLC
MC2 CIVIL, LLC
SER CONSTRUCTION PARTNERS, LLC
RAGLE CONSTRUCTION, INC.
WEBBER, LLC
POSILLICO CIVIL, INC.
PULICE CONSTRUCTION, INC.
ZACHRY CONSTRUCTION CORPORATION
GRANITE CONSTRUCTION COMPANY
PREPARING ROW
STA 36.660 $4,000.000 $28,500.000 $1,254.870 $72,500.000 $56,000.000 $25,690.000 $229,479.000 $6,500.000 $201,500.000 $256,410.260 $246,000.000
REMOV CONC (PAV)
SY 18,113.000 $15.000 $5.000 $7.600 $5.000 $4.000 $6.500 $2.250 $3.630 $3.250 $2.990 $4.000
REMOV CONC (MEDIANS)
SY 704.000 $15.000 $2.710 $5.410 $5.000 $2.800 $15.000 $2.600 $3.010 $2.830 $5.110 $6.000
REMOV CONC (DRIVEWAYS)
SY 199.000 $20.000 $2.750 $5.670 $5.000 $4.800 $17.000 $2.600 $2.990 $2.810 $10.450 $6.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 414.000 $20.000 $3.000 $5.670 $5.000 $3.200 $15.000 $3.050 $66.420 $3.310 $7.090 $4.000
REMOV CONC (CURB & GUTTER)
LF 8,225.000 $4.000 $1.500 $4.680 $0.100 $1.700 $6.500 $1.550 $1.780 $1.670 $1.760 $2.000
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
SY 17,675.000 $10.000 $1.750 $2.850 $5.000 $4.500 $9.000 $1.650 $30.770 $2.360 $1.910 $2.000
EXCAV (ROADWAY)
CY 142,458.000 $15.000 $14.000 $18.000 $15.000 $15.900 $20.000 $12.800 $2.000 $18.000 $18.240 $20.000
EMBANK (FNL)(DC)(TY C)
CY 3,746.000 $30.000 $13.250 $31.540 $7.000 $2.200 $15.000 $12.600 $27.400 $18.000 $3.610 $50.000
EMBANK (FNL)(DC)(TY C)(CSBE)
CY 32,462.000 $50.000 $58.000 $44.090 $50.000 $66.300 $55.000 $76.250 $115.000 $49.000 $61.020 $60.000
BLOCK SODDING
SY 3,249.000 $7.000 $5.000 $3.410 $3.500 $4.700 $7.500 $3.250 $3.250 $3.320 $3.720 $5.250
DRILL SEED (TEMP_WARM_COOL)
SY 14,777.000 $2.000 $0.200 $0.230 $0.250 $0.200 $0.190 $0.200 $0.220 $0.220 $0.250 $0.180
DRILL SEED (OPT1)
SY 14,777.000 $1.000 $0.750 $0.340 $0.350 $0.200 $0.290 $0.300 $0.320 $0.330 $0.370 $0.220
STRAW/HAY MULCH
SY 14,777.000 $1.000 $0.270 $0.190 $0.200 $0.300 $0.420 $0.200 $0.180 $0.180 $0.210 $0.260
FERTILIZER
AC 3.900 $1,000.000 $800.000 $787.240 $800.000 $936.000 $880.630 $750.000 $750.000 $765.310 $859.190 $800.000
VEGETATIVE WATERING
TGL 468.000 $25.000 $55.000 $35.160 $30.000 $36.400 $35.000 $35.000 $41.810 $61.610 $38.950 $40.000
FL BS (CMP IN PLC)(TY D GR 1-2)(9")
SY 1,142.000 $30.000 $27.250 $34.600 $28.000 $35.500 $30.000 $27.500 $15.630 $36.950 $24.730 $23.240
GEOGRID BASE REINFORCEMENT (TYPE 1)
SY 1,142.000 $3.000 $2.000 $14.730 $5.000 $4.300 $4.500 $6.100 $3.320 $13.330 $4.850 $3.460
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 902.000 $350.000 $360.000 $341.140 $350.000 $364.500 $333.000 $334.000 $456.470 $375.000 $371.170 $328.860
LIME TRT (SUBGRADE)(12")
SY 33,258.000 $2.000 $5.000 $5.390 $7.000 $6.600 $3.450 $10.300 $3.530 $10.000 $5.680 $5.120
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
SY 33,258.000 $10.000 $22.000 $32.790 $20.000 $23.600 $19.300 $19.700 $24.800 $21.500 $22.560 $19.160
ASPHALT TRT BASE (GR 4)(PG 64)
TON 1,835.000 $160.000 $140.000 $164.110 $140.000 $153.000 $150.000 $140.000 $170.000 $162.290 $179.630 $142.860
CONC PVMT (CRCP) (10")
SY 14,094.000 $80.000 $90.000 $78.900 $50.000 $84.700 $80.000 $94.750 $100.000 $95.000 $93.000 $87.000
CONC PVMT (CRCP) (11")
SY 17,277.000 $90.000 $93.000 $86.120 $61.000 $89.300 $85.000 $105.000 $100.000 $105.000 $150.000 $90.000
CEM STABIL BKFL
CY 11,691.000 $80.000 $70.000 $60.970 $50.000 $62.400 $50.000 $57.250 $132.000 $80.000 $62.380 $63.340
TRENCH EXCAVATION PROTECTION
LF 5,875.000 $10.000 $6.000 $13.530 $10.000 $1.000 $4.000 $8.300 $1.000 $16.140 $19.960 $30.000
TEMPORARY SPL SHORING
SF 11,651.000 $110.000 $32.000 $45.000 $75.000 $89.000 $100.000 $38.750 $150.000 $58.260 $35.000 $140.000
FOUNDATION LOAD TEST (D4945) (PILE)
EA 7.000 $20,000.000 $6,000.000 $5,248.280 $16,000.000 $15,685.700 $5,500.000 $4,400.000 $25,000.000 $5,591.230 $11,715.490 $10,000.000
STEEL H-PILING (HP 14 X 102)
LF 12,620.000 $250.000 $179.000 $267.750 $140.000 $138.900 $170.000 $135.000 $140.000 $285.000 $266.330 $300.000
SOIL NAIL ANCHORS
LF 12,110.000 $34.360 $130.000 $138.670 $100.000 $54.300 $80.000 $69.500 $68.460 $86.860 $29.790 $83.510
DRILL SHAFT (48 IN)
LF 15,311.000 $580.000 $390.000 $574.650 $530.000 $516.100 $410.000 $418.000 $600.000 $505.000 $549.040 $520.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 34.000 $800.000 $1,105.000 $671.780 $950.000 $1,560.000 $640.000 $983.000 $1,045.000 $952.670 $1,088.320 $952.670
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $395.000 $200.000 $288.660 $390.000 $395.200 $275.000 $272.000 $374.000 $276.140 $389.500 $276.140
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $650.000 $384.000 $530.080 $610.000 $499.200 $505.000 $383.000 $467.500 $388.830 $486.880 $388.830
CL B CONC (MISC)
CY 30.400 $735.000 $925.000 $1,172.320 $1,250.000 $857.500 $600.000 $363.000 $511.750 $1,100.000 $1,863.360 $617.530
CL C CONC (ABUT)
CY 5.000 $1,600.000 $1,250.000 $1,181.350 $2,300.000 $4,424.400 $3,700.000 $13,290.000 $1,508.240 $6,000.000 $14,884.990 $4,300.000
CL C CONC (CAP)
CY 377.000 $1,655.000 $800.000 $1,273.290 $1,000.000 $647.200 $720.000 $788.000 $873.330 $600.000 $636.780 $2,000.000
CL C CONC (COLUMN)
CY 466.300 $1,800.000 $1,200.000 $1,731.570 $1,000.000 $1,620.000 $1,150.000 $1,560.000 $900.000 $1,500.000 $1,196.990 $2,000.000
CL C CONC (FOOTING)(MASS)
CY 1,115.100 $1,250.000 $125.000 $1,183.770 $1,000.000 $504.000 $700.000 $626.000 $1,150.000 $850.000 $712.010 $750.000
CL C CONC (MISC)
CY 710.800 $1,120.000 $1,800.000 $1,181.200 $1,000.000 $900.000 $1,050.000 $1,200.000 $1,500.000 $800.000 $825.360 $1,000.000
CL F CONC (CAP)(INVT)
CY 459.900 $1,300.000 $1,500.000 $1,200.310 $1,550.000 $1,713.800 $1,250.000 $1,440.000 $1,437.390 $2,350.000 $1,546.130 $2,000.000
CL F CONC (FOOTING)(MASS)
CY 711.100 $1,000.000 $1,000.000 $1,200.310 $750.000 $455.900 $550.000 $514.000 $1,150.000 $750.000 $707.040 $680.000
CL F CONC (ABUT)
CY 610.700 $1,120.000 $680.000 $1,196.080 $650.000 $924.500 $550.000 $593.000 $1,088.850 $575.000 $692.650 $850.000
CL F CONC (BENT)(HPC)
CY 332.300 $1,120.000 $720.000 $1,196.080 $550.000 $716.800 $575.000 $644.000 $1,017.130 $850.000 $656.430 $680.000
REINF CONC SLAB
SF 57,728.000 $25.000 $22.000 $27.400 $23.000 $23.400 $25.000 $23.500 $30.000 $17.000 $22.630 $32.000
APPROACH SLAB
CY 351.000 $900.000 $700.000 $917.810 $700.000 $578.300 $555.000 $561.000 $821.060 $690.000 $679.350 $1,000.000
RETAINING WALL (MSE)
SF 33,227.000 $90.000 $56.750 $46.050 $70.000 $52.100 $35.000 $50.000 $55.000 $55.000 $54.890 $60.000
RET WALL (DS)(FASCIA)(VERT SCH)
SF 8,498.000 $79.000 $73.000 $62.100 $42.000 $92.900 $50.000 $54.500 $54.930 $56.000 $71.410 $45.000
PRESTR CONC GIRDER (TX46)
LF 4,309.980 $205.000 $230.000 $210.310 $215.000 $218.400 $240.000 $234.000 $297.420 $225.000 $262.720 $350.000
PRESTR CONC GIRDER (TX54)
LF 2,451.540 $245.000 $235.000 $217.580 $215.000 $218.400 $240.000 $248.000 $298.260 $250.000 $245.070 $475.000
RIPRAP (CONC)(6 IN)
CY 960.000 $300.000 $470.000 $303.580 $500.000 $482.600 $460.000 $524.000 $541.730 $530.000 $496.640 $500.000
ELASTOMERIC BEARING (SLIDING)(SPG)
EA 40.000 $5,000.000 $6,800.000 $1,574.490 $6,000.000 $3,721.900 $5,500.000 $5,400.000 $8,375.890 $8,547.210 $7,467.710 $5,217.190
STR STEEL (ROLLED BEAM)
LB 36,400.000 $4.000 $3.250 $3.200 $3.600 $3.700 $2.600 $2.550 $4.250 $2.600 $3.290 $3.900
STR STEEL (RAILROAD DECK-GIRDER)
LB 1,492,700.000 $3.000 $3.100 $3.860 $3.200 $3.700 $3.000 $2.550 $4.250 $2.630 $2.400 $2.900
STR STEEL (MISCELLANEOUS BRIDGE)
LB 5,800.000 $8.000 $3.100 $3.200 $6.500 $3.900 $4.000 $2.550 $4.250 $2.600 $4.100 $3.250
STR STEEL (DIAPHRAGM & STIFFENER)
LB 146,500.000 $3.000 $3.100 $3.360 $3.700 $3.700 $2.900 $2.550 $4.250 $2.600 $4.560 $2.000
RAIL (TY SSTR)
LF 1,980.000 $100.000 $85.000 $90.420 $85.000 $53.700 $74.000 $60.500 $60.640 $78.600 $79.740 $99.960
RAIL (TY PR11)
LF 2,858.000 $125.000 $135.000 $142.640 $150.000 $120.800 $130.000 $108.000 $126.840 $114.360 $126.020 $96.430
RAIL (HANDRAIL)(RR BRIDGE)
LF 284.400 $250.000 $189.000 $167.430 $190.000 $170.800 $165.000 $135.000 $488.600 $287.050 $182.790 $245.080
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 349.000 $265.000 $210.000 $166.210 $190.000 $190.000 $195.000 $221.000 $295.940 $255.300 $213.710 $287.430
WATERPROOFING (TY RR - 1)
SY 642.000 $345.000 $15.000 $519.580 $500.000 $27.400 $75.000 $495.000 $67.620 $322.930 $340.240 $542.350
CONC BOX CULV (4 FT X 3 FT)
LF 458.000 $380.000 $350.000 $400.780 $350.000 $311.900 $425.000 $256.000 $479.350 $350.000 $368.110 $253.930
CONC BOX CULV (6 FT X 4 FT)
LF 2,032.000 $500.000 $570.000 $555.120 $554.000 $527.400 $715.000 $404.000 $800.000 $650.000 $777.190 $474.220
CONC BOX CULV (12 FT X 10 FT)
LF 2,951.000 $2,300.000 $1,900.000 $1,579.000 $1,900.000 $1,625.800 $1,850.000 $1,360.000 $2,250.000 $1,915.000 $2,244.200 $2,300.000
CONC BOX CULV (12 FT X 10 FT)(C E-80)
LF 261.000 $2,500.000 $3,200.000 $5,200.000 $4,000.000 $4,920.700 $2,625.000 $1,790.000 $2,365.480 $3,500.000 $3,331.220 $2,300.000
RC PIPE (CL III)(12 IN)
LF 34.000 $90.000 $54.000 $199.930 $125.000 $86.500 $90.000 $64.250 $165.040 $140.000 $123.690 $59.860
RC PIPE (CL III)(24 IN)
LF 4,156.000 $95.000 $93.000 $215.470 $110.000 $96.600 $95.000 $72.500 $167.740 $90.000 $100.060 $71.890
RC PIPE (CL III)(30 IN)
LF 43.000 $160.000 $132.000 $120.690 $220.000 $138.500 $135.000 $117.000 $286.770 $220.000 $141.050 $315.620
RC PIPE (CL III)(36 IN)
LF 42.000 $215.000 $168.000 $153.290 $450.000 $172.000 $165.000 $210.000 $346.970 $225.000 $373.230 $352.190
RC PIPE (CL III)(48 IN)
LF 34.000 $350.000 $233.000 $135.740 $450.000 $261.400 $265.000 $308.000 $372.700 $300.000 $351.620 $468.400
RC PIPE (CL III)(66 IN)
LF 91.000 $580.000 $565.000 $378.960 $600.000 $482.800 $530.000 $429.000 $815.810 $575.000 $654.150 $617.960
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $15,000.000 $9,900.000 $8,388.560 $10,000.000 $7,114.400 $9,300.000 $7,020.000 $15,871.020 $12,436.180 $10,102.330 $7,591.110
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 1.000 $16,000.000 $11,700.000 $12,116.940 $12,000.000 $9,465.900 $12,700.000 $10,790.000 $21,140.970 $14,372.290 $11,425.490 $10,921.110
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 3.000 $20,000.000 $24,500.000 $20,725.530 $19,000.000 $23,479.200 $30,300.000 $20,210.000 $29,399.340 $26,208.870 $18,174.390 $20,672.640
INLET (COMPL)(CURB)(TY C1)(LEFT)(HOU)
EA 17.000 $4,500.000 $7,200.000 $6,608.520 $7,000.000 $7,706.700 $9,900.000 $8,410.000 $10,619.560 $12,172.850 $9,615.450 $7,391.700
INLET (COMPL)(CURB)(TY C1)(BOTH)(HOU)
EA 30.000 $8,000.000 $8,000.000 $7,192.020 $7,800.000 $8,200.600 $10,050.000 $8,910.000 $11,982.950 $13,110.230 $10,428.820 $8,572.460
INLET (COMPL)(TY AD)(HOU)
EA 6.000 $12,000.000 $4,500.000 $4,290.820 $4,500.000 $5,206.500 $7,100.000 $5,350.000 $7,947.740 $9,639.890 $7,604.940 $4,697.190
INLET (COMPL)(TY AZ2G)(HOU)
EA 1.000 $7,500.000 $7,800.000 $10,061.430 $7,500.000 $7,727.500 $10,150.000 $12,020.000 $22,254.240 $17,516.830 $10,314.260 $9,919.460
MANH (COMPL)(TY A)(HOU)
EA 11.000 $7,700.000 $4,200.000 $7,184.410 $5,500.000 $7,774.200 $8,850.000 $7,990.000 $12,195.200 $9,966.820 $7,960.070 $6,168.780
JCT BOX (COMPL)(SPL)
EA 4.000 $2,400.000 $85,000.000 $89,350.930 $140,000.000 $158,570.300 $75,000.000 $66,600.000 $88,180.560 $100,000.000 $93,045.590 $104,217.990
MANH(COMPL)(TY A)(MOD)
EA 7.000 $10,000.000 $4,000.000 $3,804.190 $3,500.000 $4,714.000 $5,250.000 $4,570.000 $9,297.100 $6,958.920 $13,000.060 $5,133.430
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
LF 58.000 $1,800.000 $1,480.000 $603.250 $1,000.000 $209.400 $1,500.000 $1,500.000 $2,239.950 $1,648.010 $1,100.000 $2,100.000
ADJUSTING MANHOLES
EA 2.000 $1,200.000 $700.000 $3,152.200 $750.000 $520.000 $1,225.000 $1,730.000 $1,523.640 $1,601.500 $3,141.810 $1,127.180
REMOV STR (INLET)
EA 14.000 $500.000 $650.000 $728.660 $600.000 $481.500 $620.000 $1,550.000 $757.600 $3,135.860 $2,663.660 $830.230
REMOV STR (MANHOLE)
EA 2.000 $1,200.000 $2,250.000 $728.230 $850.000 $772.800 $770.000 $1,550.000 $1,658.580 $3,131.340 $2,663.660 $877.370
REMOV STR (SET)
EA 4.000 $1,500.000 $550.000 $546.550 $600.000 $1,379.000 $620.000 $788.000 $829.290 $1,438.170 $1,821.600 $246.850
REMOV STR (HEADWALL)
EA 4.000 $3,000.000 $1,800.000 $2,623.420 $600.000 $1,379.000 $1,040.000 $1,600.000 $1,699.510 $1,438.170 $2,663.660 $1,383.430
REMOV STR (PIPE)
LF 220.000 $40.000 $30.000 $1,093.090 $25.000 $35.300 $25.000 $29.100 $35.370 $105.070 $58.780 $25.520
REMOV STR (BOX CULVERT)
LF 1,695.000 $30.000 $64.000 $91.670 $75.000 $161.200 $95.000 $49.000 $99.540 $55.610 $40.000 $40.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $226,900.000 $140,000.000 $375,517.800 $240,000.000 $160,492.800 $1,000,000.000 $134,108.270 $154,656.430 $205,698.890 $155,013.260 $750,000.000
MOBILIZATION
LS 1.000 $5,018,926.470 $5,140,000.000 $2,000,000.000 $7,500,000.000 $7,500,000.000 $8,000,000.000 $8,412,722.000 $7,000,000.000 $9,035,970.350 $9,400,000.000 $9,600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $10,000.000 $6,000.000 $7,100.000 $11,000.000 $5,742.400 $75,000.000 $45,963.000 $25,000.000 $11,827.470 $13,854.670 $12,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $36,000.000 $15,000.000 $18,000.000 $19,000.000 $18,200.000 $50,000.000 $22,550.000 $25,000.000 $16,900.000 $21,701.820 $12,500.000
TMA (STATIONARY)
DAY 410.000 $200.000 $300.000 $200.000 $250.000 $208.000 $350.000 $426.400 $300.000 $212.480 $236.000 $191.670
TMA (MOBILE OPERATION)
HR 100.000 $90.000 $150.000 $262.000 $75.000 $104.000 $100.000 $81.900 $350.000 $267.040 $105.600 $925.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,553.000 $4.000 $3.840 $3.150 $3.000 $1.900 $3.840 $3.000 $3.500 $3.060 $3.440 $3.050
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,553.000 $1.000 $1.000 $1.000 $1.000 $0.600 $0.960 $1.000 $1.000 $1.020 $1.150 $1.020
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 750.000 $10.000 $7.290 $5.750 $6.000 $5.200 $6.500 $5.500 $6.000 $5.610 $6.300 $5.580
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 144.000 $15.000 $7.290 $8.130 $7.000 $6.200 $7.290 $6.750 $7.000 $6.890 $7.730 $6.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 894.000 $3.000 $1.250 $2.600 $3.000 $2.100 $1.240 $2.500 $2.500 $2.550 $2.860 $2.540
CONSTRUCTING DETOURS
SY 2,480.000 $110.000 $90.000 $93.460 $100.000 $147.000 $130.000 $102.000 $85.000 $123.210 $120.930 $120.870
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 24,360.000 $60.000 $54.000 $55.340 $60.000 $46.700 $50.000 $76.000 $24.000 $52.000 $101.920 $35.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,860.000 $75.000 $14.000 $88.000 $33.000 $17.000 $30.000 $47.250 $22.000 $40.000 $88.370 $30.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 62.000 $95.000 $13.750 $88.130 $33.000 $17.000 $85.000 $79.750 $25.000 $42.000 $140.000 $45.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 11,400.000 $20.000 $7.250 $5.000 $6.000 $12.600 $9.000 $8.650 $7.000 $2.000 $11.680 $15.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 820.000 $20.000 $10.000 $12.690 $8.000 $18.200 $8.000 $21.600 $5.000 $8.000 $18.040 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $45.000 $25.000 $12.680 $8.000 $18.200 $10.500 $22.000 $5.000 $18.000 $42.860 $8.610
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 14,310.000 $50.000 $10.000 $5.690 $9.000 $11.800 $11.500 $8.750 $6.000 $15.000 $15.920 $5.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,860.000 $16.000 $12.000 $5.550 $9.000 $15.500 $10.000 $11.800 $6.000 $23.810 $16.740 $5.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 62.000 $30.000 $16.000 $6.540 $9.000 $15.500 $15.000 $12.600 $6.000 $25.000 $40.000 $12.530
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 160.000 $230.000 $325.000 $420.000 $190.000 $116.000 $270.000 $259.000 $250.000 $354.890 $289.170 $226.060
COLORED TEXTURED CONC (6")
SY 41.000 $200.000 $165.000 $272.020 $225.000 $140.400 $150.000 $102.000 $906.340 $288.140 $171.840 $130.660
CONC CURB (MONO) (TY II)
LF 14,797.000 $10.000 $4.000 $4.200 $4.000 $4.000 $6.300 $3.850 $38.050 $10.090 $4.510 $8.000
DRIVEWAYS (CONC)
SY 301.000 $110.000 $132.000 $78.570 $100.000 $92.100 $98.000 $95.750 $93.720 $156.550 $57.650 $88.570
CONC SIDEWALKS (6")
SY 2,213.000 $95.000 $69.000 $72.290 $75.000 $67.500 $65.000 $72.000 $140.680 $107.460 $77.290 $64.820
CURB RAMPS (TY 5)
EA 1.000 $3,500.000 $2,750.000 $2,220.000 $3,000.000 $1,580.100 $2,045.000 $2,540.000 $4,668.370 $3,050.420 $3,093.100 $2,000.000
CURB RAMPS (TY 7)
EA 4.000 $4,000.000 $1,850.000 $1,900.000 $2,400.000 $3,238.400 $2,370.000 $2,540.000 $3,348.650 $2,052.100 $2,062.070 $2,200.000
CURB RAMPS (TY 10)
EA 1.000 $4,300.000 $2,050.000 $2,220.000 $2,800.000 $3,132.000 $2,840.000 $2,650.000 $3,359.410 $2,273.950 $3,093.100 $2,300.000
CURB RAMPS (TY 21)
EA 1.000 $9,700.000 $2,450.000 $2,220.000 $3,500.000 $2,201.200 $3,340.000 $2,650.000 $4,482.140 $2,717.640 $3,093.100 $1,400.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $30.000 $28.500 $47.230 $45.000 $32.500 $31.250 $28.500 $28.500 $32.490 $35.800 $25.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,400.000 $1,635.000 $1,427.000 $1,400.000 $1,742.000 $1,675.000 $1,640.000 $1,635.000 $1,741.450 $1,918.870 $1,275.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $650.000 $1,525.000 $3,835.000 $1,650.000 $1,768.000 $1,700.000 $3,300.000 $1,525.000 $1,767.440 $1,947.510 $1,375.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,500.000 $3,300.000 $3,700.000 $3,600.000 $3,666.000 $3,525.000 $3,300.000 $3,300.000 $3,664.840 $4,038.220 $3,125.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $2,005.000 $1,650.000 $1,626.000 $1,200.000 $1,612.000 $1,050.000 $1,650.000 $1,650.000 $1,611.490 $1,775.670 $1,468.210
CRASH CUSH ATTEN (REMOVE)
EA 11.000 $1,450.000 $1,100.000 $850.000 $500.000 $842.400 $1,040.000 $1,100.000 $1,100.000 $842.130 $927.930 $365.740
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 2.000 $6,800.000 $18,900.000 $2,700.000 $8,000.000 $7,763.600 $17,200.000 $13,000.000 $6,995.000 $7,761.150 $8,551.840 $6,896.290
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 11.000 $8,510.000 $7,850.000 $6,290.000 $8,000.000 $8,195.200 $7,500.000 $7,850.000 $7,850.000 $8,192.610 $9,027.260 $7,690.140
CHAIN LINK FENCE (INSTALL) (8')
LF 154.000 $75.000 $75.000 $53.000 $75.000 $52.000 $50.000 $75.000 $50.000 $51.980 $57.280 $75.000
CHAIN LINK FENCE (REMOVE)
LF 260.000 $5.000 $10.000 $12.000 $5.000 $11.400 $11.000 $5.000 $11.000 $11.440 $12.600 $5.000
PIPE UNDERDRAINS (TY 6) (6")
LF 2,862.000 $50.000 $13.000 $52.390 $48.000 $4.400 $35.000 $28.800 $86.010 $51.270 $29.390 $25.000
PIPE UNDERDRAINS (TY 8)(8")
LF 730.000 $75.000 $128.000 $56.600 $80.000 $29.100 $40.000 $204.000 $113.160 $56.360 $20.000 $30.120
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 41.000 $5,000.000 $4,068.000 $1,495.000 $2,400.000 $2,652.000 $1,425.000 $2,100.000 $4,383.500 $2,126.900 $4,565.180 $2,126.900
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 16.000 $2,662.000 $4,200.000 $1,360.000 $1,250.000 $2,652.000 $1,295.000 $1,610.000 $1,100.000 $1,629.440 $1,145.600 $1,629.440
LED HI MST IL ASM (6 FIXT) (TY A)
EA 1.000 $40,000.000 $8,115.000 $8,230.000 $53,000.000 $59,280.000 $7,795.000 $8,390.000 $7,150.000 $8,515.740 $7,446.350 $8,515.740
CONDT (PVC) (SCH 40) (3")
LF 4,247.000 $10.000 $14.650 $15.900 $25.000 $22.900 $15.150 $17.300 $8.800 $17.540 $9.160 $17.540
CONDT (PVC) (SCH 40) (4")
LF 361.000 $20.000 $20.000 $35.000 $23.000 $27.000 $33.250 $25.400 $11.000 $67.730 $11.460 $25.000
CONDT (PVC) (SCH 40) (6")
LF 347.000 $25.000 $20.000 $48.000 $47.000 $39.500 $45.000 $33.750 $16.500 $33.250 $17.180 $30.000
CONDT (PVC) (SCH 80) (2")
LF 4,263.000 $16.000 $13.820 $11.700 $14.000 $19.800 $11.500 $10.300 $12.100 $10.410 $12.600 $10.410
CONDT (PVC) (SCH 80) (3")
LF 2,066.000 $23.000 $16.300 $15.800 $20.000 $23.900 $15.050 $15.000 $23.100 $15.200 $24.060 $15.200
CONDT (PVC) (SCH 80) (4")
LF 2,330.000 $20.000 $19.350 $32.300 $23.000 $31.200 $30.750 $18.800 $25.300 $19.130 $26.350 $19.130
CONDT (PVC) (SCH 80) (4") (BORE)
LF 82.000 $150.000 $27.850 $215.180 $29.500 $56.200 $205.000 $19.100 $35.200 $19.380 $36.660 $19.380
CONDT (RM) (3/4")
LF 860.000 $25.000 $16.660 $34.380 $33.000 $29.100 $32.750 $19.300 $29.700 $19.560 $30.930 $19.560
CONDT (RM) (2")
LF 64.000 $35.000 $32.220 $52.750 $45.000 $35.400 $50.250 $29.100 $49.500 $29.500 $51.550 $29.500
CONDT (RM) (6")
LF 882.000 $100.000 $75.000 $288.660 $100.000 $57.200 $275.000 $125.000 $165.000 $126.900 $171.840 $126.900
ITS MULTI-DUCT CND (PVC-40)
LF 2,357.000 $30.000 $44.520 $30.000 $20.000 $45.800 $28.250 $31.750 $13.150 $32.130 $13.690 $32.130
ITS MULTI-DUCT CND (PVC-80)
LF 4,918.000 $40.000 $45.160 $57.730 $30.000 $49.900 $55.000 $33.250 $30.800 $33.830 $32.080 $33.830
ELEC CONDR (NO.12) BARE
LF 860.000 $1.340 $1.750 $2.000 $1.500 $1.600 $1.650 $1.400 $1.930 $1.430 $2.000 $1.430
ELEC CONDR (NO.12) INSULATED
LF 1,720.000 $1.700 $1.750 $2.000 $1.500 $1.800 $1.750 $1.400 $2.090 $1.430 $2.180 $1.430
ELEC CONDR (NO.8) BARE
LF 1,800.000 $2.500 $2.250 $2.300 $2.000 $2.100 $2.150 $1.800 $2.310 $1.850 $2.410 $1.850
ELEC CONDR (NO.8) INSULATED
LF 80.000 $2.000 $2.700 $6.000 $2.250 $2.300 $5.000 $2.100 $2.480 $2.110 $2.580 $2.110
ELEC CONDR (NO.6) BARE
LF 4,562.000 $2.000 $2.850 $2.600 $2.500 $2.600 $2.450 $2.300 $2.860 $2.360 $2.980 $2.360
ELEC CONDR (NO.6) INSULATED
LF 7,765.000 $3.000 $3.170 $2.600 $2.750 $2.900 $2.500 $2.500 $2.970 $2.560 $3.090 $2.560
TRAY CABLE (3 CONDR) (12 AWG)
LF 2,155.000 $3.500 $3.970 $3.500 $4.000 $2.100 $3.350 $3.000 $3.960 $3.060 $4.120 $3.060
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 11.000 $6,000.000 $4,385.000 $6,114.250 $4,700.000 $4,680.000 $5,825.000 $5,890.000 $4,620.000 $5,974.620 $4,811.490 $5,974.620
GROUND BOX TY D (162922)W/APRON
EA 17.000 $1,375.000 $1,246.000 $1,422.280 $1,200.000 $1,612.000 $1,355.000 $1,070.000 $1,430.000 $1,086.290 $1,489.270 $1,086.290
REMOVE GROUND BOX
EA 5.000 $680.000 $107.000 $450.000 $500.000 $884.000 $425.000 $50.000 $137.500 $50.760 $143.200 $50.760
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $9,000.000 $10,530.000 $7,600.000 $8,500.000 $8,840.000 $7,200.000 $7,760.000 $7,700.000 $7,873.100 $8,019.150 $7,873.100
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $700.000 $557.000 $590.000 $600.000 $764.400 $735.000 $557.000 $535.000 $742.430 $638.100 $325.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 19.000 $800.000 $590.000 $620.000 $625.000 $858.000 $825.000 $590.000 $635.000 $833.330 $675.900 $350.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $1,000.000 $730.000 $770.000 $750.000 $946.400 $910.000 $730.000 $985.000 $919.190 $836.280 $440.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,300.000 $900.000 $950.000 $950.000 $1,242.800 $1,195.000 $900.000 $1,035.000 $1,207.070 $1,031.040 $510.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $1,000.000 $3,700.000 $450.000 $450.000 $769.600 $740.000 $425.000 $535.000 $747.480 $486.880 $342.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $750.000 $425.000 $520.000 $500.000 $832.000 $740.000 $490.000 $595.000 $747.470 $561.340 $432.000
REMOVE SM RD SN SUP&AM
EA 10.000 $105.000 $95.000 $100.000 $100.000 $98.800 $110.000 $95.000 $115.000 $111.110 $108.830 $95.960
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 2.000 $100.000 $35.000 $37.000 $40.000 $124.800 $75.000 $35.000 $85.000 $75.760 $40.100 $35.360
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 130.000 $1.000 $1.000 $1.100 $1.000 $0.500 $0.450 $1.000 $1.000 $1.030 $1.150 $1.010
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 102.000 $1.000 $1.000 $1.100 $1.000 $0.500 $0.450 $1.000 $1.000 $1.550 $1.150 $1.010
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,371.000 $0.500 $1.000 $1.100 $1.000 $0.500 $0.450 $1.000 $1.000 $0.770 $1.150 $1.010
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 140.000 $1.000 $1.000 $1.100 $2.000 $0.600 $0.600 $1.000 $1.000 $1.800 $1.150 $1.010
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 56.000 $8.000 $6.000 $6.500 $6.000 $3.300 $3.200 $6.000 $6.000 $6.190 $6.870 $6.060
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 3.000 $100.000 $110.000 $116.000 $120.000 $78.000 $75.000 $110.000 $110.000 $180.410 $126.020 $111.110
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 3.000 $120.000 $110.000 $116.000 $120.000 $78.000 $75.000 $110.000 $110.000 $180.410 $126.020 $111.110
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 123.000 $1.000 $1.000 $1.100 $1.000 $0.500 $0.450 $1.000 $1.000 $1.030 $1.150 $1.010
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 36.000 $7.000 $4.000 $4.200 $4.000 $3.100 $3.000 $4.000 $4.000 $6.190 $4.580 $4.040
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 230.000 $1.000 $1.500 $1.600 $1.500 $1.600 $1.500 $1.500 $1.500 $2.730 $1.720 $1.520
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 22.000 $2.000 $2.500 $2.600 $2.500 $1.600 $1.500 $2.500 $2.500 $3.870 $2.860 $2.530
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,886.000 $1.500 $0.800 $1.000 $0.800 $1.600 $1.500 $0.800 $0.800 $1.130 $0.920 $0.810
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 2,000.000 $1.420 $1.400 $1.500 $1.400 $1.300 $1.250 $1.400 $1.400 $2.730 $1.600 $1.410
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 492.000 $2.550 $1.800 $2.000 $1.800 $1.300 $1.250 $1.800 $1.800 $3.870 $2.060 $1.820
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 61,109.000 $1.540 $0.800 $1.000 $0.800 $1.300 $1.250 $0.800 $0.800 $1.130 $0.920 $0.810
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 450.000 $2.500 $1.400 $1.500 $1.400 $2.100 $2.000 $1.400 $1.400 $2.270 $1.600 $1.410
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 108.000 $17.000 $8.000 $9.000 $8.000 $5.200 $5.000 $8.000 $8.000 $12.890 $9.160 $8.080
WK ZN PAV MRK REMOV (W)(ARROW)
EA 3.000 $300.000 $150.000 $159.000 $150.000 $156.000 $150.000 $150.000 $150.000 $201.030 $171.840 $151.520
WK ZN PAV MRK REMOV (W)(WORD)
EA 3.000 $300.000 $150.000 $159.000 $150.000 $156.000 $150.000 $150.000 $150.000 $231.960 $171.840 $151.520
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,161.000 $1.550 $0.800 $1.000 $0.800 $1.600 $1.500 $0.800 $0.800 $1.130 $0.920 $0.810
WK ZN PAV MRK REMOV (Y)24"(SLD)
LF 4,645.000 $1.500 $8.000 $9.000 $8.000 $5.200 $5.000 $8.000 $8.000 $10.820 $9.160 $8.080
RE PM TY II (W) (ENTR GORE)
EA 2.000 $150.000 $450.000 $475.000 $450.000 $468.000 $450.000 $450.000 $450.000 $1,117.270 $515.520 $454.550
RE PM TY II (W) (EXIT GORE)
EA 2.000 $150.000 $450.000 $475.000 $450.000 $468.000 $450.000 $450.000 $450.000 $584.500 $515.520 $454.550
RE PM TY II (Y)(CURB)
LF 1,332.000 $5.000 $1.100 $1.200 $1.100 $2.300 $2.250 $1.100 $1.100 $1.910 $1.260 $1.110
RE PM TY III (W)(6")(SLD)
LF 20,345.000 $1.300 $0.950 $1.000 $1.000 $0.800 $0.800 $0.950 $0.950 $0.980 $1.090 $0.960
RE PM TY III (W)(6")(BRK)
LF 10,513.000 $1.400 $0.950 $1.000 $1.000 $0.800 $0.800 $0.950 $0.950 $0.980 $1.090 $0.960
RE PM TY III (W)(6")(DOT)
LF 690.000 $1.620 $1.250 $1.300 $1.250 $0.800 $0.800 $1.250 $1.250 $2.580 $1.430 $1.260
RE PM TY III (W)(8")(SLD)
LF 3,971.000 $3.000 $1.800 $2.000 $2.000 $1.400 $1.300 $1.800 $1.800 $2.840 $2.060 $1.820
RE PM TY III (W)(24")(SLD)
LF 692.000 $15.000 $11.500 $12.000 $12.000 $12.500 $12.000 $11.500 $11.500 $10.820 $13.170 $11.620
RE PM TY III (Y)(6")(SLD)
LF 15,029.000 $1.300 $0.950 $1.000 $1.000 $0.800 $0.800 $0.950 $0.950 $0.980 $1.090 $0.960
RE PM TY III (BLK)(6")(SHADOW)
LF 10,513.000 $1.500 $1.600 $1.700 $1.600 $0.900 $0.850 $1.600 $1.600 $0.980 $1.830 $1.620
PREFAB PM TY C (W)(ARROW)
EA 26.000 $400.000 $250.000 $265.000 $250.000 $260.000 $250.000 $250.000 $250.000 $292.390 $286.390 $252.530
PREFAB PM TY C (W)(DBL ARROW)
EA 3.000 $450.000 $460.200 $490.000 $500.000 $364.000 $350.000 $460.000 $460.200 $399.320 $526.970 $464.850
PREFAB PM TY C (W)(UTURN ARROW)
EA 3.000 $400.000 $535.000 $565.000 $600.000 $260.000 $250.000 $534.000 $534.280 $411.320 $612.070 $539.680
PREFAB PM TY C (W)(WORD)
EA 26.000 $410.000 $360.000 $380.000 $400.000 $260.000 $250.000 $360.000 $360.000 $327.960 $412.410 $363.640
REFL PAV MRKR TY I-C
EA 137.000 $8.000 $5.000 $5.300 $5.000 $6.800 $6.500 $5.000 $5.000 $6.190 $5.730 $5.050
REFL PAV MRKR TY II-A-A
EA 22.000 $5.000 $5.000 $5.300 $5.000 $6.800 $6.500 $5.000 $5.000 $6.190 $5.730 $5.050
REFL PAV MRKR TY II-C-R
EA 577.000 $5.900 $5.000 $5.300 $5.000 $6.800 $6.500 $5.000 $5.000 $6.190 $5.730 $5.050
ELIM EXT PM & MRKS (6")
LF 29,218.000 $1.460 $0.400 $0.500 $0.400 $0.700 $0.690 $0.400 $0.400 $0.400 $0.460 $0.400
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $60.000 $55.000 $58.000 $55.000 $26.000 $25.000 $55.000 $55.000 $72.170 $63.010 $55.560
ELIM EXT PM & MRKS (WORD)
EA 2.000 $65.000 $55.000 $58.000 $55.000 $26.000 $25.000 $55.000 $55.000 $77.320 $63.010 $55.560
PAV SURF PREP FOR MRK (6")
LF 8,474.000 $1.000 $0.100 $0.150 $0.100 $0.010 $0.010 $0.100 $0.100 $0.060 $0.110 $0.100
PAV SURF PREP FOR MRK (8")
LF 3,971.000 $0.400 $0.200 $0.200 $0.200 $0.020 $0.020 $0.200 $0.200 $0.080 $0.230 $0.200
PAV SURF PREP FOR MRK (24")
LF 692.000 $2.000 $0.400 $0.400 $0.400 $0.100 $0.060 $0.400 $0.400 $0.250 $0.460 $0.400
PAV SURF PREP FOR MRK (ARROW)
EA 26.000 $30.000 $5.000 $5.300 $5.000 $10.400 $10.000 $5.000 $5.000 $5.150 $5.730 $5.050
PAV SURF PREP FOR MRK (DBL ARROW)
EA 3.000 $70.000 $5.000 $5.300 $5.000 $0.010 $15.000 $5.000 $5.000 $5.150 $5.730 $5.050
PAV SURF PREP FOR MRK (UTURN ARR)
EA 3.000 $25.000 $15.000 $16.000 $15.000 $15.600 $15.000 $15.000 $15.000 $5.150 $17.180 $15.150
PAV SURF PREP FOR MRK (WORD)
EA 26.000 $30.000 $15.000 $16.000 $15.000 $10.400 $10.000 $15.000 $15.000 $5.150 $17.180 $15.150
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $36,300.000 $39,000.000 $40,672.000 $42,000.000 $57,564.000 $38,750.000 $33,570.000 $47,850.000 $34,079.190 $49,833.270 $34,079.190
REMOVING TRAFFIC SIGNALS (DIAMOND)
EA 1.000 $15,000.000 $3,361.000 $4,000.000 $11,000.000 $5,720.000 $3,575.000 $3,500.000 $8,250.000 $3,553.300 $8,591.940 $3,553.300
TEMP TRAF SIGNALS
EA 3.000 $50,000.000 $35,600.000 $48,806.000 $56,000.000 $43,680.000 $46,500.000 $27,700.000 $31,900.000 $28,121.830 $33,222.180 $28,121.830
VEH SIG SEC (12")LED(GRN)
EA 14.000 $305.000 $290.000 $330.000 $250.000 $260.000 $315.000 $285.000 $401.500 $289.340 $418.140 $289.340
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $305.000 $290.000 $330.000 $250.000 $260.000 $315.000 $285.000 $401.500 $289.340 $418.140 $289.340
VEH SIG SEC (12")LED(YEL)
EA 14.000 $312.000 $290.000 $330.000 $250.000 $260.000 $315.000 $285.000 $401.500 $289.340 $418.140 $289.340
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $305.000 $290.000 $330.000 $250.000 $260.000 $315.000 $285.000 $401.500 $289.340 $418.140 $289.340
VEH SIG SEC (12")LED(RED)
EA 14.000 $312.000 $290.000 $330.000 $250.000 $260.000 $315.000 $285.000 $401.500 $289.340 $418.140 $289.340
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $305.000 $290.000 $330.000 $250.000 $260.000 $315.000 $285.000 $401.500 $289.340 $418.140 $289.340
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $700.000 $640.000 $771.500 $700.000 $884.000 $735.000 $700.000 $770.000 $710.660 $801.910 $710.660
BACKPLATE W/REFL BRDR(4 SEC)
EA 4.000 $200.000 $247.000 $240.000 $250.000 $208.000 $225.000 $200.000 $225.500 $203.050 $234.850 $203.050
BACKPLATE W/REFL BRDR(3 SEC)
EA 14.000 $180.000 $185.000 $210.000 $210.000 $156.000 $200.000 $150.000 $203.500 $152.280 $211.940 $152.280
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,340.000 $2.200 $2.300 $2.500 $2.300 $2.300 $2.250 $1.950 $2.750 $1.970 $2.860 $1.970
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,330.000 $2.800 $3.620 $3.500 $3.500 $2.600 $3.100 $2.950 $4.130 $3.010 $4.300 $3.010
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 3,130.000 $3.200 $5.750 $4.500 $5.400 $3.100 $4.350 $4.950 $5.230 $5.010 $5.440 $5.010
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $15,300.000 $14,750.000 $16,650.000 $15,700.000 $18,876.000 $15,750.000 $14,370.000 $17,325.000 $14,588.830 $18,043.080 $14,588.830
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $18,600.000 $16,500.000 $18,300.000 $17,500.000 $20,644.000 $17,250.000 $16,870.000 $20,234.500 $17,123.860 $21,073.170 $17,123.860
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 2.000 $31,700.000 $40,000.000 $33,326.600 $34,000.000 $40,196.000 $31,750.000 $28,490.000 $36,850.000 $28,921.830 $38,377.350 $28,921.830
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 2.000 $33,000.000 $40,000.000 $34,927.330 $35,000.000 $41,548.000 $33,275.000 $29,810.000 $3,850.000 $30,265.990 $40,095.740 $30,265.990
PED POLE ASSEMBLY
EA 4.000 $3,000.000 $2,405.000 $2,750.000 $3,800.000 $3,640.000 $2,595.000 $2,000.000 $2,585.000 $2,030.460 $2,692.140 $2,030.460
PED DETECT PUSH BUTTON (APS)
EA 7.000 $1,000.000 $925.000 $870.000 $800.000 $884.000 $825.000 $776.000 $852.500 $787.820 $887.830 $787.820
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,000.000 $4,100.000 $3,900.000 $4,000.000 $3,640.000 $3,675.000 $3,470.000 $4,345.000 $3,517.770 $4,525.090 $3,517.770
REMOVAL OF CONDUIT
LF 3,518.000 $15.000 $10.180 $7.700 $11.000 $17.300 $7.250 $2.000 $2.200 $2.030 $2.290 $2.030
REMOVAL OF SIGNAL POLE ASSM
EA 2.000 $3,000.000 $268.000 $1,150.000 $850.000 $1,560.000 $1,075.000 $1,500.000 $935.000 $1,522.850 $973.760 $1,522.850
REMOVE PED POLE ASSM
EA 9.000 $900.000 $169.000 $290.000 $500.000 $1,248.000 $275.000 $500.000 $385.000 $507.610 $400.960 $507.610
DECK DRAINS
LF 280.000 $30.000 $10.000 $94.000 $40.000 $61.500 $375.000 $64.250 $30.000 $178.340 $84.030 $148.890
STORMWATER PUMP STATION
EA 1.000 $10,540,390.000 $13,443,882.750 $12,000,000.000 $11,700,000.000 $12,316,967.300 $12,500,000.000 $14,500,000.000 $14,000,000.000 $14,000,000.000 $14,000,000.000 $15,500,000.000
RAILROAD TRACK CONSTRUCTION
LS 1.000 $3,806,300.000 $3,800,000.000 $6,000,000.000 $4,800,000.000 $4,591,508.700 $5,570,000.000 $4,310,600.000 $4,145,000.000 $4,875,000.000 $4,539,032.070 $4,500,000.000
VIVDS TEMPORARY
EA 1.000 $54,600.000 $13,649.000 $35,600.000 $15,000.000 $26,884.000 $33,750.000 $13,500.000 $16,500.000 $13,705.580 $17,183.890 $13,705.580
VIVDS CABLING
LF 1,185.000 $4.250 $2.800 $3.000 $3.000 $2.600 $2.500 $3.950 $2.480 $4.010 $2.580 $4.010
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 2.000 $9,100.000 $8,800.000 $9,500.000 $9,500.000 $8,840.000 $8,975.000 $8,010.000 $8,250.000 $8,126.910 $8,591.940 $8,126.910
RVDS (PRESENCE DETECTION ONLY)
EA 6.000 $8,150.000 $8,460.000 $6,166.730 $9,000.000 $7,800.000 $5,875.000 $7,900.000 $7,150.000 $8,016.240 $7,446.350 $8,016.240
RVDS (ADVANCE DETECTION ONLY)
EA 4.000 $8,720.000 $8,500.000 $6,822.770 $9,000.000 $8,840.000 $6,500.000 $8,020.000 $7,810.000 $8,144.160 $8,133.710 $8,144.160
RADAR PRESENCE DETECTOR COMM CABLE
LF 3,650.000 $2.500 $2.780 $2.000 $3.000 $2.600 $1.750 $2.900 $2.150 $2.960 $2.230 $2.960
ITS POLE MNT CAB (TY 2) (CONF 2)
EA 1.000 $6,000.000 $6,671.000 $6,200.000 $7,000.000 $6,448.000 $5,875.000 $4,710.000 $10,450.000 $4,776.650 $10,883.130 $4,776.650
ITS POLE (55 FT)(110 MPH)
EA 1.000 $19,000.000 $20,800.000 $24,272.000 $22,000.000 $29,640.000 $23,125.000 $19,920.000 $25,300.000 $20,223.350 $26,348.620 $20,223.350
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $5,300.000 $2,700.000 $9,000.000 $3,000.000 $9,880.000 $8,575.000 $8,510.000 $9,075.000 $8,634.520 $9,451.130 $8,634.520
REMOVE CCTV FIELD EQUIPMENT
EA 1.000 $600.000 $1,400.000 $800.000 $1,500.000 $1,560.000 $750.000 $500.000 $220.000 $507.610 $229.120 $507.610
CTMS RELOCATION (HUB BLDG)
EA 1.000 $14,500.000 $3,360.000 $9,400.000 $3,500.000 $19,084.000 $8,875.000 $4,250.000 $11,000.000 $4,314.720 $11,455.920 $4,314.720
RELOCATE HIGH MAST LIGHTING ASSEMBLY
EA 2.000 $20,000.000 $11,821.000 $16,000.000 $13,000.000 $9,880.000 $15,250.000 $23,000.000 $16,500.000 $23,350.260 $17,183.890 $23,350.260
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
LF 12,199.000 $4.000 $3.850 $9.390 $4.000 $9.600 $8.950 $5.550 $5.450 $5.630 $5.670 $5.630
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 2,082.000 $2.000 $1.610 $4.500 $2.000 $5.800 $4.350 $3.500 $4.680 $3.550 $4.870 $3.550
REMOVE FIBER OPTIC CABLE
LF 11,269.000 $2.000 $0.600 $2.500 $1.000 $4.100 $2.400 $1.000 $0.550 $1.020 $0.570 $1.020
INSTALL GND MT COMM CABINET FOUNDATION
EA 1.000 $7,000.000 $4,520.000 $2,800.000 $5,000.000 $3,640.000 $2,675.000 $3,030.000 $5,500.000 $3,071.070 $5,727.960 $3,071.070
REMOVE EXISTING CABLES (POWER)
LF 590.000 $2.000 $1.150 $3.000 $2.000 $3.600 $2.500 $2.000 $1.100 $2.030 $1.150 $2.030
Totals: $78,925,854.110 $74,036,474.930 $78,783,438.565 $79,474,317.650 $79,533,034.778 $80,436,125.577 $84,127,222.000 $88,136,213.637 $90,359,703.559 $95,000,759.757 $97,871,054.984
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $400,000.00
RAILROAD FORCE ACCOUNT WORK (NON-PART) $956,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $250,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $386,173.29
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,450.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $14,500.00
Total: $2,008,123.29