PREPARING ROW
|
AC
|
1.300
|
$10,000.000
|
$10,000.000
|
$25,000.000
|
$100,000.000
|
$37,500.000
|
$15,236.000
|
|
|
PREPARING ROW
|
STA
|
61.000
|
$12,000.000
|
$98,750.000
|
$1,500.000
|
$12,750.000
|
$3,500.000
|
$2,899.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
2,875.000
|
$6.500
|
$5.250
|
$5.000
|
$8.400
|
$2.250
|
$7.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
239.000
|
$22.000
|
$9.250
|
$5.000
|
$5.600
|
$2.250
|
$7.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
445.000
|
$16.000
|
$3.400
|
$5.000
|
$5.800
|
$2.250
|
$8.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,716.000
|
$11.000
|
$4.700
|
$5.000
|
$14.500
|
$2.250
|
$7.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
803.000
|
$4.000
|
$1.900
|
$1.000
|
$1.100
|
$5.000
|
$5.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
186.000
|
$7.000
|
$6.900
|
$5.000
|
$4.400
|
$0.750
|
$5.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
57,866.000
|
$6.000
|
$5.000
|
$2.000
|
$10.400
|
$2.500
|
$13.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
47,424.000
|
$6.000
|
$2.000
|
$10.000
|
$18.400
|
$5.000
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
37.000
|
$10.000
|
$100.000
|
$50.000
|
$25.200
|
$50.000
|
$320.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,570.000
|
$14.000
|
$20.000
|
$25.000
|
$26.300
|
$30.000
|
$16.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
14.000
|
$45.000
|
$35.000
|
$150.000
|
$36.800
|
$75.000
|
$40.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,315.000
|
$1.000
|
$1.250
|
$5.000
|
$1.300
|
$2.500
|
$1.000
|
|
|
BLOCK SODDING
|
SY
|
13,575.000
|
$5.000
|
$3.750
|
$5.000
|
$4.300
|
$6.000
|
$4.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
1,300.000
|
$0.200
|
$0.200
|
$5.000
|
$0.200
|
$3.250
|
$0.250
|
|
|
BROADCAST SEED (PERM)(SPECIAL MIX)
|
SY
|
1,300.000
|
$0.200
|
$0.350
|
$0.500
|
$0.400
|
$1.450
|
$0.400
|
|
|
FERTILIZER
|
AC
|
3.070
|
$600.000
|
$750.000
|
$7,500.000
|
$787.500
|
$2,500.000
|
$846.000
|
|
|
VEGETATIVE WATERING
|
MG
|
369.000
|
$25.000
|
$25.000
|
$30.000
|
$19.600
|
$40.000
|
$34.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
55,601.000
|
$3.500
|
$6.500
|
$3.000
|
$3.300
|
$4.500
|
$15.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
751.000
|
$260.000
|
$305.000
|
$300.000
|
$317.600
|
$325.000
|
$332.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
55,601.000
|
$12.000
|
$15.500
|
$20.000
|
$16.500
|
$19.000
|
$17.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
3,058.000
|
$115.000
|
$68.000
|
$140.000
|
$125.200
|
$110.000
|
$135.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
52,452.000
|
$86.500
|
$105.500
|
$110.000
|
$115.800
|
$125.000
|
$105.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(15")
|
SY
|
16,204.000
|
$115.000
|
$161.500
|
$145.000
|
$175.400
|
$160.000
|
$125.000
|
|
|
CEM STABIL BKFL
|
CY
|
13,519.000
|
$52.000
|
$52.000
|
$43.000
|
$59.800
|
$65.000
|
$54.000
|
|
|
CUT & RESTORING PAV
|
SY
|
1,883.000
|
$70.000
|
$90.000
|
$150.000
|
$27.400
|
$90.000
|
$122.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
1,210.000
|
$60.000
|
$55.000
|
$43.000
|
$59.800
|
$65.000
|
$53.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
145.000
|
$200.000
|
$170.000
|
$250.000
|
$197.200
|
$250.000
|
$190.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
11,433.000
|
$2.500
|
$8.700
|
$1.000
|
$1.900
|
$3.500
|
$6.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
147,734.000
|
$6.000
|
$4.700
|
$1.000
|
$1.800
|
$0.150
|
$8.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
90.000
|
$628.390
|
$612.000
|
$1,200.000
|
$698.200
|
$1,475.000
|
$2,513.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
146.000
|
$270.000
|
$340.000
|
$400.000
|
$378.000
|
$255.000
|
$293.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$400.000
|
$406.000
|
$500.000
|
$472.500
|
$400.000
|
$460.000
|
|
|
CL C CONC (MISC)
|
CY
|
137.900
|
$550.000
|
$2,100.000
|
$350.000
|
$1,882.800
|
$2,500.000
|
$2,323.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
227.000
|
$365.000
|
$525.000
|
$350.000
|
$469.700
|
$675.000
|
$495.000
|
|
|
RIPRAP CONC (8 IN)
|
CY
|
11.000
|
$1,530.000
|
$525.000
|
$1,500.000
|
$1,832.700
|
$1,250.000
|
$1,082.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
21.000
|
$100.000
|
$135.000
|
$1,000.000
|
$212.600
|
$500.000
|
$1,062.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
8.000
|
$550.000
|
$700.000
|
$1,000.000
|
$529.600
|
$900.000
|
$380.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
293.000
|
$1,750.000
|
$1,545.000
|
$1,500.000
|
$1,539.800
|
$1,600.000
|
$1,650.000
|
|
|
CONC BOX CULV (12 FT X 4 FT)
|
LF
|
766.000
|
$1,000.000
|
$1,440.000
|
$1,300.000
|
$1,441.800
|
$1,850.000
|
$385.000
|
|
|
CONC BOX CULV (12 FT X 6 FT)
|
LF
|
4,839.000
|
$1,000.000
|
$1,635.000
|
$1,450.000
|
$1,604.700
|
$2,275.000
|
$1,675.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
426.000
|
$600.000
|
$600.000
|
$1,200.000
|
$620.500
|
$2,100.000
|
$755.000
|
|
|
CONC BOX CULV (12 FT X 5 FT)
|
LF
|
1,552.000
|
$1,000.000
|
$1,530.000
|
$1,400.000
|
$1,517.800
|
$2,175.000
|
$1,600.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
356.000
|
$100.000
|
$82.000
|
$100.000
|
$96.800
|
$115.000
|
$98.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,920.000
|
$120.000
|
$103.000
|
$135.000
|
$138.700
|
$150.000
|
$140.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
281.000
|
$150.000
|
$128.000
|
$160.000
|
$160.600
|
$125.000
|
$155.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
960.000
|
$175.000
|
$163.000
|
$190.000
|
$179.900
|
$235.000
|
$200.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
38.000
|
$200.000
|
$257.000
|
$500.000
|
$249.500
|
$525.000
|
$270.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
903.000
|
$250.000
|
$244.000
|
$310.000
|
$272.600
|
$400.000
|
$290.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
156.000
|
$400.000
|
$342.000
|
$400.000
|
$375.600
|
$550.000
|
$435.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
12.000
|
$400.000
|
$425.000
|
$1,100.000
|
$440.100
|
$925.000
|
$480.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
10.000
|
$4,852.570
|
$5,800.000
|
$7,000.000
|
$4,730.000
|
$8,475.000
|
$6,912.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
3.000
|
$6,000.000
|
$11,900.000
|
$11,000.000
|
$9,776.200
|
$17,175.000
|
$12,510.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
20.000
|
$7,500.000
|
$11,500.000
|
$10,000.000
|
$10,500.100
|
$11,400.000
|
$10,547.000
|
|
|
MANH (COMPL)(TY B)
|
EA
|
1.000
|
$10,050.000
|
$36,500.000
|
$33,000.000
|
$30,145.700
|
$38,600.000
|
$20,493.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
3.000
|
$6,500.000
|
$7,700.000
|
$7,500.000
|
$6,236.800
|
$11,125.000
|
$9,273.000
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
28.000
|
$7,500.000
|
$8,500.000
|
$8,200.000
|
$6,914.000
|
$13,500.000
|
$9,200.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
4.000
|
$45,000.000
|
$140,000.000
|
$125,000.000
|
$123,976.900
|
$260,000.000
|
$58,503.000
|
|
|
INLET (TOP) (TY AD)
|
EA
|
1.000
|
$3,500.000
|
$4,500.000
|
$4,000.000
|
$3,357.900
|
$7,175.000
|
$6,254.000
|
|
|
INLET (COMPL) (TY AD) (MOD)
|
EA
|
47.000
|
$6,000.000
|
$5,900.000
|
$8,000.000
|
$6,748.100
|
$12,250.000
|
$7,206.000
|
|
|
MANH (COMPL)(RISER ONLY)
|
EA
|
18.000
|
$2,500.000
|
$3,700.000
|
$3,750.000
|
$2,969.800
|
$5,125.000
|
$2,985.000
|
|
|
INLET EXT
|
EA
|
40.000
|
$1,500.000
|
$1,700.000
|
$1,200.000
|
$1,200.700
|
$2,000.000
|
$1,434.000
|
|
|
INLET (COMPL)(TY AAD)(MOD)
|
EA
|
1.000
|
$6,500.000
|
$7,800.000
|
$9,500.000
|
$5,256.100
|
$12,200.000
|
$9,600.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,300.000
|
$1,350.000
|
$2,600.000
|
$995.100
|
$1,825.000
|
$5,262.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,301.000
|
$1,950.000
|
$3,000.000
|
$1,759.900
|
$2,175.000
|
$2,350.000
|
|
|
JACK BOR TUN BOX CULV (10 FT X 10 FT)
|
LF
|
474.000
|
$7,500.000
|
$2,700.000
|
$5,750.000
|
$5,622.100
|
$9,500.000
|
$6,990.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$500.000
|
$3,700.000
|
$800.000
|
$441.200
|
$2,350.000
|
$821.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$5,000.000
|
$7,700.000
|
$2,000.000
|
$7,292.300
|
$31,500.000
|
$6,388.000
|
|
|
REMOV STR (INLET)
|
EA
|
39.000
|
$620.000
|
$810.000
|
$350.000
|
$215.400
|
$1,175.000
|
$820.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
4.000
|
$800.000
|
$615.000
|
$500.000
|
$316.100
|
$1,750.000
|
$820.000
|
|
|
REMOV STR (SET)
|
EA
|
20.000
|
$400.000
|
$450.000
|
$200.000
|
$111.600
|
$625.000
|
$615.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,800.000
|
$700.000
|
$900.000
|
$483.200
|
$2,125.000
|
$2,459.000
|
|
|
REMOV STR (PIPE)
|
LF
|
6,541.000
|
$28.000
|
$15.000
|
$18.000
|
$20.100
|
$50.000
|
$18.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
16.000
|
$100.000
|
$250.000
|
$500.000
|
$178.900
|
$420.000
|
$154.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
164.000
|
$45.000
|
$19.250
|
$5.000
|
$23.800
|
$70.000
|
$21.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,305,000.000
|
$6,200,000.000
|
$1,500,000.000
|
$5,500,000.000
|
$2,750,000.000
|
$7,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
39.000
|
$8,500.000
|
$9,000.000
|
$25,000.000
|
$15,748.200
|
$75,000.000
|
$8,986.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
2,000.000
|
$115.000
|
$45.000
|
$25.000
|
$23.600
|
$50.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,000.000
|
$10.000
|
$8.750
|
$1.000
|
$7.600
|
$7.500
|
$17.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,285.000
|
$3.000
|
$4.000
|
$3.000
|
$3.000
|
$5.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,285.000
|
$0.850
|
$0.900
|
$0.500
|
$1.100
|
$2.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
560.000
|
$5.000
|
$3.750
|
$15.000
|
$5.500
|
$7.500
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,232.000
|
$6.000
|
$4.750
|
$20.000
|
$5.800
|
$8.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,792.000
|
$7.000
|
$0.750
|
$1.000
|
$1.500
|
$1.500
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
16,630.000
|
$105.000
|
$125.000
|
$80.000
|
$121.100
|
$130.000
|
$120.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
1,120.000
|
$85.000
|
$65.000
|
$75.000
|
$63.200
|
$90.000
|
$111.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
3,800.000
|
$12.000
|
$9.000
|
$8.000
|
$15.000
|
$15.000
|
$6.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
4,100.000
|
$8.000
|
$5.000
|
$5.000
|
$14.200
|
$5.000
|
$13.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,240.000
|
$9.000
|
$5.000
|
$5.000
|
$12.900
|
$5.000
|
$13.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
3,800.000
|
$15.000
|
$8.250
|
$5.000
|
$15.000
|
$10.000
|
$6.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
1,120.000
|
$20.000
|
$7.500
|
$5.000
|
$15.000
|
$10.000
|
$7.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
478.000
|
$80.000
|
$100.000
|
$200.000
|
$78.800
|
$130.000
|
$108.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
7,480.000
|
$6.000
|
$4.500
|
$4.000
|
$3.600
|
$8.500
|
$5.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
565.000
|
$8.500
|
$6.500
|
$7.000
|
$8.100
|
$10.500
|
$11.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
6,076.000
|
$83.000
|
$105.000
|
$65.000
|
$92.800
|
$135.000
|
$95.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
4,912.000
|
$75.000
|
$80.000
|
$55.000
|
$73.900
|
$105.000
|
$55.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
10.000
|
$2,000.000
|
$2,900.000
|
$1,500.000
|
$1,648.000
|
$3,600.000
|
$1,956.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,420.000
|
$3,400.000
|
$2,500.000
|
$2,964.000
|
$4,075.000
|
$1,956.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
16.000
|
$2,000.000
|
$3,100.000
|
$1,500.000
|
$1,903.200
|
$3,000.000
|
$1,955.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,800.000
|
$5,800.000
|
$12,500.000
|
$2,551.300
|
$9,325.000
|
$1,956.000
|
|
|
CONC MEDIAN
|
SY
|
24.000
|
$85.000
|
$62.000
|
$250.000
|
$85.100
|
$250.000
|
$54.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
100.000
|
$85.000
|
$40.000
|
$45.000
|
$28.400
|
$40.000
|
$45.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,000.000
|
$1,250.000
|
$1,000.000
|
$2,625.000
|
$1,250.000
|
$1,411.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,200.000
|
$2,650.000
|
$2,500.000
|
$262.500
|
$2,650.000
|
$2,991.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,500.000
|
$1,650.000
|
$1,300.000
|
$2,625.000
|
$1,650.000
|
$1,862.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
255.000
|
$2.400
|
$5.000
|
$3.000
|
$5.300
|
$5.000
|
$6.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
1.000
|
$16,500.000
|
$21,000.000
|
$25,000.000
|
$29,400.000
|
$24,770.000
|
$26,269.000
|
|
|
MAILBOX INSTALL-S (RR-POST) TY 4
|
EA
|
1.000
|
$165.000
|
$250.000
|
$500.000
|
$262.500
|
$300.000
|
$318.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
11.000
|
$285.000
|
$250.000
|
$550.000
|
$262.500
|
$315.000
|
$334.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$365.000
|
$350.000
|
$450.000
|
$262.500
|
$350.000
|
$371.000
|
|
|
MAILBOX INSTALL-S (TIM-POST) TY 5
|
EA
|
4.000
|
$300.000
|
$250.000
|
$450.000
|
$262.500
|
$300.000
|
$318.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
1.000
|
$300.000
|
$350.000
|
$450.000
|
$262.500
|
$400.000
|
$424.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,360.000
|
$14.000
|
$6.580
|
$18.000
|
$18.900
|
$14.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
960.000
|
$25.000
|
$21.400
|
$18.000
|
$18.900
|
$17.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
260.000
|
$25.000
|
$14.060
|
$32.000
|
$33.600
|
$24.000
|
$25.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
15.000
|
$31.000
|
$25.160
|
$32.000
|
$33.600
|
$40.000
|
$42.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
180.000
|
$30.000
|
$20.330
|
$34.500
|
$36.200
|
$32.000
|
$34.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
2,025.000
|
$40.000
|
$29.850
|
$34.500
|
$36.200
|
$26.000
|
$27.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
14,380.000
|
$2.000
|
$1.810
|
$1.000
|
$1.100
|
$2.000
|
$2.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
685.000
|
$3.000
|
$2.250
|
$1.500
|
$1.600
|
$2.300
|
$2.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
1,370.000
|
$3.500
|
$2.720
|
$2.000
|
$2.100
|
$2.600
|
$3.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,950.000
|
$2.700
|
$3.160
|
$2.500
|
$2.600
|
$2.650
|
$3.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
28.000
|
$1,520.000
|
$993.000
|
$1,100.000
|
$1,155.000
|
$1,050.000
|
$1,101.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
28.000
|
$1,200.000
|
$1,263.000
|
$1,300.000
|
$1,365.000
|
$1,150.000
|
$1,206.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
4.000
|
$6,000.000
|
$6,025.000
|
$7,500.000
|
$7,875.000
|
$7,100.000
|
$7,446.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$520.000
|
$500.000
|
$650.000
|
$577.500
|
$500.000
|
$515.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$1,050.000
|
$800.000
|
$700.000
|
$1,134.000
|
$800.000
|
$824.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$66.500
|
$100.000
|
$85.000
|
$131.300
|
$100.000
|
$103.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,000.000
|
$0.300
|
$0.600
|
$0.500
|
$2.300
|
$0.600
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
11,606.000
|
$0.300
|
$0.600
|
$0.500
|
$2.300
|
$0.600
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
87.000
|
$0.500
|
$1.500
|
$0.750
|
$7.400
|
$1.000
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
326.000
|
$2.700
|
$3.100
|
$5.000
|
$12.600
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$70.000
|
$200.000
|
$120.000
|
$262.500
|
$125.000
|
$103.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
2.000
|
$80.000
|
$250.000
|
$120.000
|
$273.000
|
$150.000
|
$103.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
11,985.000
|
$0.300
|
$0.600
|
$0.500
|
$2.300
|
$0.600
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
300.000
|
$4.000
|
$3.100
|
$5.000
|
$12.600
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
5,270.000
|
$1.000
|
$1.350
|
$2.000
|
$2.300
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
447.000
|
$2.000
|
$2.250
|
$2.500
|
$2.300
|
$2.750
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
15,953.000
|
$0.850
|
$1.350
|
$1.500
|
$2.300
|
$1.200
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
420.000
|
$2.000
|
$4.500
|
$2.500
|
$4.700
|
$3.750
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,474.000
|
$1.750
|
$2.250
|
$2.500
|
$4.700
|
$2.400
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
632.000
|
$8.000
|
$8.500
|
$9.000
|
$12.600
|
$10.500
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
5.000
|
$175.000
|
$200.000
|
$200.000
|
$262.500
|
$195.000
|
$206.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
5.000
|
$190.000
|
$250.000
|
$350.000
|
$262.500
|
$205.000
|
$309.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
24,578.000
|
$0.830
|
$1.350
|
$1.500
|
$2.300
|
$1.200
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
107.000
|
$3.750
|
$8.250
|
$8.000
|
$12.600
|
$10.500
|
$8.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
326.000
|
$5.500
|
$5.250
|
$6.000
|
$7.400
|
$6.500
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
568.000
|
$5.500
|
$6.950
|
$6.000
|
$7.400
|
$6.500
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
135.000
|
$5.500
|
$6.000
|
$6.000
|
$7.400
|
$6.500
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,821.000
|
$0.250
|
$0.600
|
$1.000
|
$0.300
|
$0.440
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,540.000
|
$0.500
|
$0.800
|
$2.000
|
$0.600
|
$0.680
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,093.000
|
$1.000
|
$1.000
|
$3.500
|
$1.100
|
$1.500
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
309.000
|
$2.000
|
$2.000
|
$7.000
|
$3.200
|
$3.000
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$36.000
|
$100.000
|
$85.000
|
$15.800
|
$55.000
|
$88.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
1.000
|
$70.000
|
$200.000
|
$125.000
|
$15.800
|
$55.000
|
$129.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$64.000
|
$100.000
|
$85.000
|
$15.800
|
$55.000
|
$88.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
20,903.000
|
$0.250
|
$0.100
|
$0.050
|
$0.100
|
$0.020
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
14,351.000
|
$0.250
|
$0.150
|
$0.100
|
$0.100
|
$0.030
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,395.000
|
$0.300
|
$0.200
|
$0.200
|
$0.100
|
$0.040
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
414.000
|
$0.500
|
$0.200
|
$0.500
|
$0.100
|
$0.060
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
3,178.000
|
$0.800
|
$0.250
|
$1.000
|
$0.100
|
$0.120
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
36.000
|
$8.000
|
$25.000
|
$5.000
|
$26.300
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
5.000
|
$11.000
|
$25.000
|
$10.000
|
$26.300
|
$5.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
19.000
|
$10.000
|
$25.000
|
$5.000
|
$26.300
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
1,029.000
|
$0.500
|
$1.000
|
$0.500
|
$5.300
|
$0.250
|
$0.500
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
4.000
|
$28,500.000
|
$71,580.000
|
$46,500.000
|
$49,087.500
|
$53,200.000
|
$55,793.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
4.000
|
$3,900.000
|
$2,112.000
|
$3,500.000
|
$3,675.000
|
$1,950.000
|
$2,045.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
4.000
|
$38,100.000
|
$57,209.000
|
$100,000.000
|
$65,625.000
|
$58,500.000
|
$61,352.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
33.000
|
$255.000
|
$220.000
|
$246.000
|
$257.300
|
$290.000
|
$304.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
16.000
|
$260.000
|
$220.000
|
$245.000
|
$257.300
|
$290.000
|
$304.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
45.000
|
$255.000
|
$220.000
|
$245.000
|
$257.300
|
$290.000
|
$304.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
14.000
|
$265.000
|
$220.000
|
$245.000
|
$257.300
|
$290.000
|
$304.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
39.000
|
$255.000
|
$220.000
|
$245.000
|
$257.300
|
$290.000
|
$304.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
14.000
|
$260.000
|
$220.000
|
$245.000
|
$257.300
|
$290.000
|
$304.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
20.000
|
$620.000
|
$790.000
|
$550.000
|
$577.500
|
$700.000
|
$734.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
51.000
|
$160.000
|
$144.000
|
$170.000
|
$178.500
|
$170.000
|
$178.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
2.000
|
$175.000
|
$1,700.000
|
$210.000
|
$220.500
|
$220.000
|
$231.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
|
LF
|
5,160.000
|
$1.700
|
$2.090
|
$1.500
|
$1.600
|
$2.000
|
$2.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
5,270.000
|
$3.000
|
$2.530
|
$1.750
|
$1.800
|
$2.500
|
$3.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
12,855.000
|
$3.000
|
$3.250
|
$2.500
|
$2.600
|
$3.250
|
$3.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
35,700.000
|
$1.600
|
$1.940
|
$1.400
|
$1.500
|
$1.800
|
$2.000
|
|
|
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
|
LF
|
3,985.000
|
$3.000
|
$1.500
|
$1.100
|
$1.200
|
$1.400
|
$1.000
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$9,500.000
|
$9,826.000
|
$12,450.000
|
$13,072.500
|
$11,550.000
|
$12,113.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
2.000
|
$11,000.000
|
$11,419.000
|
$13,700.000
|
$14,385.000
|
$12,850.000
|
$13,476.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
2.000
|
$13,500.000
|
$13,279.000
|
$16,765.000
|
$17,603.300
|
$15,200.000
|
$15,941.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
1.000
|
$12,000.000
|
$12,744.000
|
$15,765.000
|
$15,828.800
|
$13,800.000
|
$14,473.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
4.000
|
$15,000.000
|
$13,895.000
|
$16,100.000
|
$16,905.000
|
$14,800.000
|
$15,521.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
1.000
|
$29,500.000
|
$32,881.000
|
$41,500.000
|
$43,575.000
|
$38,200.000
|
$40,062.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
2.000
|
$31,500.000
|
$34,139.000
|
$41,750.000
|
$43,837.500
|
$36,700.000
|
$38,489.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
1.000
|
$32,000.000
|
$35,136.000
|
$43,540.000
|
$444,717.000
|
$37,800.000
|
$39,643.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
15.000
|
$2,200.000
|
$2,049.000
|
$2,500.000
|
$2,625.000
|
$2,250.000
|
$2,585.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
20.000
|
$900.000
|
$386.000
|
$680.000
|
$714.000
|
$800.000
|
$919.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$3,000.000
|
$4,161.000
|
$3,500.000
|
$3,675.000
|
$3,800.000
|
$4,365.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
12.000
|
$4,000.000
|
$2,500.000
|
$650.000
|
$1,099.400
|
$3,500.000
|
$847.000
|
|
|
LITTER REMOVAL
|
CYC
|
12.000
|
$2,200.000
|
$3,000.000
|
$1,500.000
|
$819.000
|
$3,500.000
|
$847.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
12.000
|
$1,000.000
|
$2,500.000
|
$1,500.000
|
$819.000
|
$4,500.000
|
$847.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
12.000
|
$1,500.000
|
$2,500.000
|
$500.000
|
$1,005.900
|
$1,400.000
|
$847.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$15,500.000
|
$14,000.000
|
$15,000.000
|
$22,428.000
|
$18,250.000
|
$16,506.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
350.000
|
$2.700
|
$2.530
|
$4.200
|
$4.400
|
$1.750
|
$2.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
7,035.000
|
$5.300
|
$3.900
|
$6.100
|
$6.400
|
$5.350
|
$6.000
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
4.000
|
$1,800.000
|
$1,468.000
|
$2,050.000
|
$2,152.500
|
$1,625.000
|
$1,704.000
|
|
|
RACK MOUNTED FO SPLICE ENCLOSURE
|
EA
|
4.000
|
$3,800.000
|
$1,190.000
|
$3,075.000
|
$3,228.800
|
$2,150.000
|
$2,255.000
|
|
|
FIBER OPTIC RS-232 DATA MODEM(S/M)
|
EA
|
4.000
|
$1,150.000
|
$879.000
|
$2,500.000
|
$2,625.000
|
$2,600.000
|
$2,727.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
2,070.000
|
$27.500
|
$29.410
|
$35.000
|
$36.800
|
$61.000
|
$64.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)(CONC ENCSE)
|
LF
|
3,815.000
|
$70.000
|
$27.920
|
$35.000
|
$36.800
|
$32.000
|
$34.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
2,302.000
|
$3.000
|
$1.550
|
$2.000
|
$0.900
|
$2.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(BRK)
|
LF
|
50.000
|
$3.250
|
$2.000
|
$2.000
|
$0.900
|
$2.250
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(DOT)
|
LF
|
155.000
|
$4.000
|
$2.000
|
$3.500
|
$0.900
|
$4.000
|
$4.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
1,047.000
|
$0.730
|
$2.000
|
$2.500
|
$1.100
|
$2.100
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
6,682.000
|
$0.800
|
$2.000
|
$2.500
|
$1.100
|
$2.150
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
2,395.000
|
$1.000
|
$2.500
|
$3.500
|
$1.700
|
$4.500
|
$4.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
414.000
|
$3.000
|
$4.950
|
$5.000
|
$3.700
|
$7.500
|
$5.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
2,530.000
|
$6.000
|
$9.000
|
$10.000
|
$7.400
|
$14.000
|
$10.000
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
16,346.000
|
$3.000
|
$1.550
|
$2.000
|
$0.900
|
$1.650
|
$2.000
|
|
MULTIPOLYMER PAV MRK (Y)(4")(BRK)
|
LF
|
2,050.000
|
$1.000
|
$2.000
|
$2.000
|
$0.900
|
$2.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
648.000
|
$6.500
|
$9.000
|
$10.000
|
$7.400
|
$14.000
|
$10.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
6,622.000
|
$0.850
|
$2.000
|
$2.500
|
$1.100
|
$2.150
|
$3.000
|
|
|
PREFB PAV MK TY B (W)(ARROW)
|
EA
|
36.000
|
$150.000
|
$250.000
|
$665.000
|
$262.500
|
$325.830
|
$685.000
|
|
|
PREFB PAV MK TY B (W)(DBL ARW)
|
EA
|
5.000
|
$250.000
|
$300.000
|
$650.000
|
$288.800
|
$397.000
|
$670.000
|
|
|
PREFB PAV MK TY B (W)(WORD)
|
EA
|
19.000
|
$150.000
|
$350.000
|
$1,000.000
|
$262.500
|
$355.000
|
$1,030.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
4.000
|
$7,900.000
|
$9,572.000
|
$9,500.000
|
$9,975.000
|
$8,500.000
|
$8,914.000
|
|
|
GPS COMMUNICATIONS UNIT
|
EA
|
4.000
|
$700.000
|
$866.000
|
$850.000
|
$892.500
|
$1,300.000
|
$1,363.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
|
EA
|
18.000
|
$3,100.000
|
$4,319.000
|
$3,850.000
|
$4,042.500
|
$4,020.000
|
$4,216.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
5.000
|
$5,500.000
|
$6,337.000
|
$5,800.000
|
$6,090.000
|
$6,200.000
|
$6,502.000
|
|
|
VIVDS TEMPORARY
|
EA
|
4.000
|
$10,000.000
|
$18,433.000
|
$21,665.000
|
$22,748.300
|
$19,000.000
|
$47,742.000
|
|
|
CASING (STEEL) (SANITARY SEWER) (12 IN)
|
LF
|
19.000
|
$200.000
|
$442.610
|
$500.000
|
$289.800
|
$325.000
|
$627.000
|
|
|
MANHOLE (SAN SEWER) ( 4' DIA)
|
EA
|
17.000
|
$7,200.000
|
$8,298.990
|
$7,500.000
|
$4,136.500
|
$35,000.000
|
$6,756.000
|
|
|
MANHOLE (SAN SEWER) (5' DIA)
|
EA
|
19.000
|
$8,400.000
|
$9,405.520
|
$17,500.000
|
$8,872.300
|
$38,750.000
|
$12,144.000
|
|
|
JACK BOR OR TUN(SANSWR)(PVC)(8IN (C900)
|
LF
|
1,921.000
|
$720.000
|
$354.090
|
$750.000
|
$365.100
|
$175.000
|
$1,255.000
|
|
|
JCK BOR OR TUN SAN SWR(PVC)(10IN)(C900)
|
LF
|
1,755.000
|
$840.000
|
$376.220
|
$1,100.000
|
$676.000
|
$165.000
|
$924.000
|
|
|
JCK BOR OR TUN SAN SWR(PVC)(12IN)(C900)
|
LF
|
1,022.000
|
$960.000
|
$420.480
|
$1,500.000
|
$1,110.800
|
$285.000
|
$1,200.000
|
|
|
JCK BOR OR TUN SAN SWR(PVC)(24IN)(C900)
|
LF
|
2,144.000
|
$1,560.000
|
$663.920
|
$2,300.000
|
$1,868.600
|
$175.000
|
$1,636.000
|
|
|
SERVICE CONNECTION (SANITARY SEWER)
|
EA
|
57.000
|
$1,500.000
|
$5,532.660
|
$5,500.000
|
$5,291.100
|
$7,000.000
|
$2,838.000
|
|
|
ABANDON SANITARY SEWER (LIFT STATION)
|
EA
|
2.000
|
$27,600.000
|
$226,759.000
|
$100,000.000
|
$60,119.700
|
$137,500.000
|
$143,602.000
|
|
|
REMOVE EXISTING MANHOLE(SANITARY SEWER)
|
EA
|
7.000
|
$1,680.000
|
$2,213.060
|
$4,500.000
|
$454.500
|
$1,735.000
|
$1,054.000
|
|
|
CONNECT EXIST SAN SWR TO MANHOLE
|
EA
|
6.000
|
$2,880.000
|
$4,426.130
|
$20,000.000
|
$868.800
|
$3,500.000
|
$1,469.000
|
|
|
MANHOLE (SAN SEWER)(6' DIA)
|
EA
|
16.000
|
$9,600.000
|
$13,278.390
|
$20,000.000
|
$18,141.200
|
$60,855.000
|
$18,419.000
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (8IN)
|
LF
|
2,528.000
|
$24.000
|
$22.130
|
$4.000
|
$8.500
|
$10.000
|
$30.000
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (10IN)
|
LF
|
7,069.000
|
$29.000
|
$24.340
|
$4.500
|
$9.400
|
$11.000
|
$27.000
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (12IN)
|
LF
|
325.000
|
$34.000
|
$27.660
|
$6.000
|
$22.800
|
$20.000
|
$30.000
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (24IN)
|
LF
|
1,680.000
|
$39.000
|
$44.260
|
$30.000
|
$24.100
|
$30.000
|
$58.000
|
|
|
ABANDON MANHOLE
|
EA
|
30.000
|
$1,000.000
|
$1,106.530
|
$2,500.000
|
$1,017.500
|
$2,215.000
|
$2,596.000
|
|
|
JCK BOR TUN SAN SWR (PVC)(15IN)(C900)
|
LF
|
2,330.000
|
$1,080.000
|
$464.740
|
$1,500.000
|
$1,891.000
|
$1,320.000
|
$1,205.000
|
|
|
JCK BOR TUN SAN SWR (PVC)(18 IN)(C900)
|
LF
|
1,250.000
|
$1,200.000
|
$509.000
|
$1,500.000
|
$1,770.700
|
$1,620.000
|
$1,302.000
|
|
|
JCK BOR TUN SAN SWR (PCV)(21 IN)(C900)
|
LF
|
465.000
|
$1,440.000
|
$553.270
|
$1,850.000
|
$3,348.500
|
$170.000
|
$1,616.000
|
|
|
JCK BOR TUN SAN SWR (PCV)(30 IN)(C900)
|
LF
|
92.000
|
$1,920.000
|
$885.230
|
$2,000.000
|
$8,120.200
|
$7,200.000
|
$2,423.000
|
|
|
MH(SAN SWR)(CORROSION REST)(FM DIS)(5FT
|
EA
|
2.000
|
$15,000.000
|
$14,384.920
|
$30,000.000
|
$22,961.300
|
$26,100.000
|
$12,250.000
|
|
|
WATER MAIN PIPE (PVC)(12IN)(DR18)(C900)
|
LF
|
5,034.000
|
$100.000
|
$146.060
|
$320.000
|
$119.200
|
$160.000
|
$208.000
|
|
|
WTR MAIN PIPE (PVC)(RESTRAINED JT) 8IN
|
LF
|
60.000
|
$90.000
|
$293.230
|
$500.000
|
$130.900
|
$335.000
|
$227.000
|
|
|
WTR MAIN PIPE (PVC)(RESTRAINED JT) 12IN
|
LF
|
1,415.000
|
$90.000
|
$309.830
|
$900.000
|
$491.300
|
$365.000
|
$402.000
|
|
|
SERVICE LINE (SHORT SIDE) (5/8" TO 1")
|
EA
|
29.000
|
$1,000.000
|
$3,319.600
|
$2,000.000
|
$1,103.800
|
$2,800.000
|
$1,731.000
|
|
|
SERVICE LINE (LONG SIDE) (5/8" TO 1")
|
EA
|
16.000
|
$2,500.000
|
$5,532.660
|
$3,000.000
|
$2,229.300
|
$3,925.000
|
$4,314.000
|
|
|
SERVICE LINE (SHORT SIDE) (1-1/2"TO 2")
|
EA
|
8.000
|
$2,000.000
|
$4,426.130
|
$3,500.000
|
$2,355.200
|
$3,630.000
|
$3,074.000
|
|
|
SERVICE LINE (LONG SIDE) (1-1/2"TO 2")
|
EA
|
7.000
|
$4,800.000
|
$6,639.190
|
$4,500.000
|
$3,775.100
|
$5,050.000
|
$5,716.000
|
|
|
TAPPING VALVE AND VALVE (6IN X 6IN)
|
EA
|
1.000
|
$4,440.000
|
$8,298.990
|
$9,500.000
|
$5,220.800
|
$7,725.000
|
$6,770.000
|
|
|
TAPPING SLEEVE AND VALVE (8IN X 8IN)
|
EA
|
2.000
|
$7,080.000
|
$13,278.390
|
$12,000.000
|
$6,436.800
|
$8,035.000
|
$8,079.000
|
|
|
TAPPING SLEEVE AND VALVE (12IN X 6IN)
|
EA
|
1.000
|
$9,500.000
|
$11,065.320
|
$9,000.000
|
$4,624.200
|
$7,555.000
|
$6,132.000
|
|
|
TAPPING SLEEVE AND VALVE (12IN X 8IN)
|
EA
|
2.000
|
$10,000.000
|
$12,171.860
|
$12,500.000
|
$5,840.200
|
$7,575.000
|
$7,435.000
|
|
|
TAPPING SLEEVE AND VALVE (12IN X 12IN)
|
EA
|
1.000
|
$11,000.000
|
$19,917.580
|
$15,000.000
|
$10,092.300
|
$12,675.000
|
$12,057.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
20.000
|
$6,000.000
|
$7,745.730
|
$12,000.000
|
$7,975.400
|
$13,600.000
|
$8,827.000
|
|
|
REMOVING FIRE HYDRANT
|
EA
|
11.000
|
$300.000
|
$885.230
|
$1,500.000
|
$690.400
|
$985.000
|
$840.000
|
|
|
CUT AND PLUG WATER MAIN (2IN)
|
EA
|
4.000
|
$1,300.000
|
$553.270
|
$1,500.000
|
$1,058.200
|
$1,730.000
|
$677.000
|
|
|
CUT AND PLUG WATER MAIN (6IN)
|
EA
|
2.000
|
$1,400.000
|
$1,106.530
|
$2,000.000
|
$1,224.100
|
$3,000.000
|
$1,301.000
|
|
|
CUT AND PLUG WATER MAIN (8IN)
|
EA
|
7.000
|
$1,900.000
|
$2,213.060
|
$2,000.000
|
$1,296.500
|
$3,000.000
|
$1,379.000
|
|
|
CUT AND PLUG WATER MAIN (12IN)
|
EA
|
2.000
|
$2,000.000
|
$3,319.600
|
$1,500.000
|
$2,738.000
|
$3,200.000
|
$2,091.000
|
|
|
WET CONNECTION (6IN)
|
EA
|
1.000
|
$2,500.000
|
$1,659.800
|
$2,000.000
|
$2,980.400
|
$3,100.000
|
$1,909.000
|
|
|
WET CONNECTION (12IN)
|
EA
|
2.000
|
$10,000.000
|
$3,319.600
|
$3,000.000
|
$4,809.500
|
$5,225.000
|
$3,953.000
|
|
|
WTR MAIN PIPE (PVC) (RESTRAINED JT) 6IN
|
LF
|
33.000
|
$82.000
|
$221.310
|
$300.000
|
$122.500
|
$290.000
|
$216.000
|
|
|
GATE VALVE (12 IN)
|
EA
|
11.000
|
$4,500.000
|
$5,532.660
|
$6,500.000
|
$3,528.100
|
$5,750.000
|
$4,599.000
|
|
|
ABAND/FILL EXIST WATER PIPE (8")
|
LF
|
4,396.000
|
$42.000
|
$22.130
|
$2.500
|
$15.900
|
$6.250
|
$15.000
|
|
|
WTR MAIN PIPE(PVC)(6 IN)(DR 18) (C900)
|
LF
|
360.000
|
$50.000
|
$99.590
|
$150.000
|
$62.800
|
$125.000
|
$149.000
|
|
|
WTR MAIN PIPE(PVC)(8 IN)(DR 18) (C900)
|
LF
|
127.000
|
$65.000
|
$154.910
|
$175.000
|
$84.600
|
$185.000
|
$283.000
|
|
|
ABAND/FILL EXIST WATER PIPE (12IN)
|
LF
|
2,312.000
|
$60.000
|
$33.200
|
$5.000
|
$19.600
|
$9.500
|
$15.000
|
|
|
WET CONNECTION (42IN)
|
EA
|
2.000
|
$20,000.000
|
$27,663.310
|
$20,000.000
|
$11,932.400
|
$25,725.000
|
$21,296.000
|
|
|
AIR RELEASE/VACUUM RELEASE VALVE (6 IN)
|
EA
|
1.000
|
$60,000.000
|
$49,793.950
|
$60,000.000
|
$31,419.000
|
$72,800.000
|
$67,147.000
|
|
|
JCK TUN BOR OR AUG CSG (STL)(60IN)
|
LF
|
265.000
|
$2,500.000
|
$1,881.100
|
$7,500.000
|
$5,257.100
|
$3,575.000
|
$3,050.000
|
|
|
SERVICE LINE (SHORT SIDE)(2-1/2" TO 4")
|
EA
|
2.000
|
$5,000.000
|
$5,532.660
|
$3,500.000
|
$3,050.500
|
$3,725.000
|
$4,544.000
|
|
|
CUT AND PLUG EXIST WATER LINE (42IN)
|
EA
|
2.000
|
$9,000.000
|
$44,261.290
|
$25,000.000
|
$40,250.400
|
$33,185.000
|
$7,307.000
|
|
|
WATER MAIN PIPE (STEEL) (RSTR JT)942IN)
|
LF
|
390.000
|
$700.000
|
$774.570
|
$1,200.000
|
$800.100
|
$1,765.000
|
$1,863.000
|
|
|
ACCESS MANWAY
|
EA
|
1.000
|
$45,000.000
|
$27,663.310
|
$25,000.000
|
$22,728.400
|
$42,400.000
|
$50,311.000
|
|
|
REMOVAL OF DISHED HEAD PLUG (42IN)
|
EA
|
2.000
|
$5,000.000
|
$5,532.660
|
$5,000.000
|
$1,771.500
|
$9,850.000
|
$7,555.000
|
|
|
NEW SAN SWR LIFT STATION (COMPLETE)
|
EA
|
1.000
|
$1,550,000.000
|
$5,500,000.000
|
$5,000,000.000
|
$3,163,605.800
|
$8,010,000.000
|
$9,000,000.000
|
|
Totals: |
$51,205,205.350
|
$62,500,910.130
|
$65,586,481.500
|
$68,458,560.945
|
$74,351,539.860
|
$74,884,296.520
|