HARRIS IH 69 (0027-13-237)

Items: 112

County: HARRIS
Length: 16.0050 MILES
Highway: IH 69
District: HOUSTON
Control Number: 0027-13-237
DBE Goal: 3.0%
Project: STP 2025(477)MM
Guaranty: $100,000.00
Time: 413 WORKING DAYS
Engineer's Estimate: $39,796,142.58
Date: 01/07/2025 (1 year ago)
Contract Number: 1253004
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00130702
Contract Type: Federal
Project Description: 2 INCH MILLING, SEAL COAT, LEVEL-UP AND 1 INCH TOM OVERLAY ON MAINLANES
Mail/Deliver Bids To: N/A
HAMOON BAHRAMI
WILLIAM BURCH
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$39,796,142.58
$44,841,587.31
Over/Under Est: 12.68% $5,045,444.73
Over/Under Est: 17.56% $6,989,374.99
Amt Left: 4.34% $1,943,930.26
Subcontractor Percentage Amount
MC2 CIVIL, LLC 8.49% $3,801,881.02
HIGHWAY 1 LLC 3.73% $1,670,319.93
TRP CONSTRUCTION GROUP, LLC 3.70% $1,656,885.72
KINGZ INDUSTRIAL LLC 2.87% $1,285,205.95
AMERICAN CONCRETE COMPANY 1.68% $752,315.68
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 1.67% $747,837.61
DUSTROL, INC. 0.22% $98,517.53
SCOTT DERR PAINTING CO, LLC 0.22% $98,517.53
CPAVE, INC. 0.21% $94,039.46
Total: 22.79% $10,205,520.43

Bid Items & Bid Tabulations

112 Total 0 of 112
HARRIS  |  IH 69  |  HOUSTON  |  0027-13-237  |  01/07/2025  |  $39,796,142.58  |  STP 2025(477)MM  |  SURF/ROADWAY RESTOR  |  413 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
REMOV CONC (MOWSTRIP)
SY 1,427.000 $7.250 $32.000 $25.300
REMOV CONC (RIPRAP)
SY 885.000 $25.000 $54.000 $53.400
REMOV CONC (CURB)
LF 165.000 $25.000 $12.000 $2.400
REMOV CONC (RAIL)
LF 26.000 $40.000 $100.000 $22.500
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 865.000 $17.000 $63.000 $5.000
EXCAV (ROADWAY)
CY 651.000 $48.000 $50.000 $120.000
BLOCK SODDING
SY 1,745.000 $7.000 $8.000 $4.500
FERTILIZER
AC 0.410 $2,000.000 $2,900.000 $750.000
VEGETATIVE WATERING
TGL 49.200 $50.000 $109.000 $132.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 231,855.000 $4.400 $3.800 $3.500
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 5,589.000 $320.000 $230.000 $324.000
TOM-C PG76-22 SAC-A
TON 40,951.000 $193.000 $222.500 $189.000
TOM-F PG76-22 SAC-B
TON 40,951.000 $180.000 $211.000 $189.000
TACK COAT
GAL 43,488.000 $3.000 $6.500 $3.400
PLANE CONC PAV(0" TO 1.5")
SY 14,537.000 $1.950 $10.250 $12.300
PLANE ASPH CONC PAV (2.5")
SY 642,539.000 $2.150 $2.900 $5.900
FULL - DEPTH REPAIR CRCP (13")
CY 625.000 $1,940.000 $1,750.000 $1,500.000
CL C CONC (RAIL FOUNDATION)
CY 793.000 $700.000 $822.000 $850.000
BLAST FINISH
SF 387,106.000 $1.300 $0.300 $4.500
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 120.000 $100.000 $76.000 $65.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,144.000 $300.000 $304.000 $260.000
RIPRAP (CONC)(4 IN)
CY 67.000 $600.000 $1,318.000 $730.000
RIPRAP (MOW STRIP)(4 IN)
CY 154.000 $600.000 $1,377.000 $750.000
CLEANING AND SEALING EXISTING JOINTS
LF 576.000 $50.000 $82.000 $70.000
RAIL (TY SSTR)
LF 7,186.000 $66.000 $130.000 $115.000
RETROFIT RAIL (TY SSTR)
LF 330.000 $350.000 $493.000 $330.000
REMOVE STR (BARRIER GATE)
EA 8.000 $2,500.000 $5,365.000 $5,000.000
MOBILIZATION
LS 1.000 $3,500,876.610 $2,100,000.000 $4,700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $50,000.000 $11,000.000 $60,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 974.000 $150.000 $140.000 $80.000
TMA (STATIONARY)
DAY 1,184.000 $300.000 $280.000 $258.000
TMA (MOBILE OPERATION)
DAY 284.000 $300.000 $522.000 $258.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 59,469.000 $75.000 $113.250 $100.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,320.000 $14.000 $66.000 $23.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 60,900.000 $8.000 $4.750 $6.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,320.000 $12.500 $66.000 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 61,269.000 $11.000 $17.000 $9.000
PORT CTB (CONNECTION HARDWARE)
EA 1,725.000 $100.000 $5.000 $1.000
PERM CTB (TRAN SSCB TO CTB) (MOD)
LF 1,800.000 $350.000 $427.000 $200.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $35.000 $37.000 $46.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $3,000.000 $2,450.000 $3,560.000
REMOVE METAL BEAM GUARD FENCE
LF 3,233.000 $3.150 $2.350 $6.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $350.000 $251.000 $553.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 18.000 $225.000 $269.000 $371.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 17.000 $250.000 $298.000 $506.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,600.000 $3,415.000 $5,303.000
GUARDRAIL END TREATMENT (REMOVE)
EA 32.000 $220.000 $380.000 $506.000
CRASH CUSH ATTEN (STKPL)
EA 54.000 $925.000 $1,150.000 $2,535.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 21.000 $25,000.000 $37,350.000 $35,682.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 54.000 $10,000.000 $8,250.000 $10,809.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
EA 591.000 $60.000 $103.000 $110.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 591.000 $35.000 $21.000 $21.400
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 86,609.000 $0.400 $0.500 $0.420
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 413,772.000 $0.400 $0.450 $0.390
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 45,418.000 $0.850 $0.910 $0.780
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
LF 18,738.000 $1.200 $3.330 $2.850
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 21,934.000 $1.300 $3.330 $2.850
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 55.000 $135.000 $99.310 $85.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 55.000 $150.000 $134.360 $115.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 110,852.000 $0.400 $0.460 $0.390
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 10,600.000 $2.250 $2.750 $2.350
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 46,076.000 $1.150 $1.290 $1.100
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 27,730.000 $1.200 $1.290 $1.100
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 521.000 $2.000 $1.030 $0.880
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 31,603.000 $1.750 $1.870 $1.600
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 7,082.000 $3.000 $2.060 $1.760
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 22,683.000 $3.600 $4.320 $3.700
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 76,838.000 $1.150 $0.840 $0.720
RE PM TY II (W) 6" (BRK)
LF 76,838.000 $0.350 $0.490 $0.420
RE PM TY II (W) 6" (LNDP)
LF 521.000 $3.000 $0.490 $0.420
RE PM TY II (W) 6" (SLD)
LF 166,212.000 $0.210 $0.460 $0.390
RE PM TY II (W) 8" (SLD)
LF 31,603.000 $0.700 $0.910 $0.780
RE PM TY II (W) 12" (LNDP)
LF 7,082.000 $2.750 $3.330 $2.850
RE PM TY II (W) 12" (SLD)
LF 22,683.000 $1.300 $3.330 $2.850
RE PM TY II (Y) 6" (SLD)
LF 92,090.000 $0.350 $0.460 $0.390
RE PM TY II (BLK)(6")(SHADOW)
LF 76,838.000 $0.520 $0.490 $0.420
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 76,838.000 $0.830 $0.810 $0.690
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 166,212.000 $0.500 $0.780 $0.670
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 92,090.000 $1.150 $0.780 $0.670
PREFAB PM TY C (W)(ARROW)
EA 77.000 $295.000 $360.450 $308.520
PREFAB PM TY C (W)(DBL ARROW)
EA 3.000 $385.000 $510.160 $436.660
PREFAB PM TY C (W)(WORD)
EA 97.000 $350.000 $486.050 $416.020
PREFAB PM TY C (W)(SYMBOL)
EA 37.000 $350.000 $376.580 $322.320
PREFAB PM TY C (MULTI)(SHIELD)
EA 67.000 $2,900.000 $2,917.430 $2,497.090
REFL PAV MRKR TY II-C-R
EA 7,216.000 $5.000 $6.720 $5.750
ELIM EXT PM & MRKS (6")
LF 171,479.000 $0.350 $0.550 $0.470
ELIM EXT PM & MRKS (8")
LF 9,292.000 $0.700 $0.980 $0.840
ELIM EXT PM & MRKS (12")
LF 6,047.000 $2.100 $1.690 $1.450
ELIM EXT PM & MRKS (ARROW)
EA 12.000 $100.000 $81.780 $70.000
ELIM EXT PM & MRKS (WORD)
EA 26.000 $107.000 $81.780 $70.000
ELIM EXT PM & MRKS (SYMBOL)
EA 12.000 $70.000 $81.780 $70.000
ELIM EXT PM & MRKS (SHIELD)
EA 11.000 $160.000 $292.080 $250.000
PAV SURF PREP FOR MRK (6")
LF 412,499.000 $0.070 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 31,603.000 $0.100 $0.040 $0.030
PAV SURF PREP FOR MRK (12")
LF 29,765.000 $0.200 $0.050 $0.040
PAV SURF PREP FOR MRK (ARROW)
EA 77.000 $10.000 $5.840 $5.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 3.000 $15.000 $5.840 $5.000
PAV SURF PREP FOR MRK (WORD)
EA 97.000 $15.000 $5.840 $5.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 37.000 $2.500 $5.840 $5.000
PAV SURF PREP FOR MRK (SHIELD)
EA 67.000 $32.000 $5.840 $5.000
PAV SURF PREP FOR MRK (RPM)
EA 7,216.000 $0.400 $1.170 $1.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 129,434.000 $3.000 $3.500 $3.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 2.000 $1,000.000 $4,150.000 $2,000.000
SLOTTED DRAIN CLEANING
LF 6,612.000 $2.500 $9.000 $10.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 1,375.000 $750.000 $1,460.000 $1,250.000
REPLACING ELASTOMERIC BEARING PADS
EA 13.000 $10,000.000 $17,500.000 $15,000.000
CONCRETE BEAM REPAIR
EA 34.000 $10,000.000 $2,700.000 $2,300.000
PEDESTRIAN BARRIER (FURN & INSTALL)
LF 760.000 $100.000 $49.000 $45.000
PEDESTRIAN BARRIER (REMOVE & REINSTALL)
LF 21,714.000 $15.000 $8.650 $15.000
BARRIER GATE
EA 8.000 $30,000.000 $47,000.000 $25,000.000
COVER (ADJUST)
EA 26.000 $2,000.000 $2,700.000 $1,000.000
BENT CAP/ABUTMENT CAP CLEANING
EA 12.000 $1,985.710 $1,165.000 $1,000.000
Totals: $39,796,142.580 $44,841,587.310 $46,785,517.570