Show Job Controls
Bid Cobra

HARDIN CR (0920-03-081)

Items: 32

County: HARDIN
Length: N/A
Highway: CR
District: BEAUMONT
Control Number: 0920-03-081
DBE Goal: N/A
Project: BR 2021(530)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $871,935.60
Date: 06/29/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
PATRICK RYAN
BRYCE BROUSSARD
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$871,935.60
$937,938.80
Over/Under Est: 7.57% $66,003.20
Over/Under Est: 14.08% $122,740.90
Amt Left: 6.05% $56,737.70
Over/Under Est: 37.45% $326,506.90
Amt Left: 27.77% $260,503.70
Delta: -20.49% -$203,766.00

Bid Items & Bid Tabulations

32 Total 0 of 32
HARDIN  |  CR  |  BEAUMONT  |  0920-03-081  |  06/29/2022  |  $871,935.60  |  BR 2021(530)  |  BRIDGE REPL  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PROJECT ALLIED RESOURCES, LLC
TEXAS MATERIALS GROUP, INC.
CROSS PLUS CONSTRUCTION, LLC
PREP ROW (TREE PRUNING)
EA 5.000 $1,500.000 $5,370.000 $17,925.000 $1,100.000
EXCAVATION (ROADWAY)
CY 326.000 $23.000 $35.200 $26.000 $28.000
SUBGRADE WIDENING (ORD COMP)
STA 2.000 $800.000 $3,940.000 $1,224.000 $5,500.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 31.000 $50.000 $145.000 $65.000 $55.000
PROOF ROLLING
HR 10.000 $100.000 $177.000 $100.000 $1,100.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 80.000 $210.000 $164.000 $200.000 $110.000
PRIME COAT (AE-P)
GAL 86.000 $22.000 $21.800 $18.000 $22.000
CEM STABIL BKFL
CY 25.000 $230.000 $245.000 $236.000 $385.000
PRESTR CONC PIL (18 IN SQ)
LF 676.000 $168.000 $223.000 $186.000 $220.000
CL C CONC (ABUT)
CY 17.600 $2,000.000 $3,320.000 $2,800.000 $3,300.000
CL C CONC (BENT)
CY 13.200 $2,000.000 $3,380.000 $3,300.000 $3,300.000
REINF CONC SLAB (SLAB BEAM)
SF 2,340.000 $30.000 $38.200 $50.000 $55.000
APPROACH SLAB
CY 38.500 $800.000 $654.000 $660.000 $55.000
PRESTR CONC SLAB BEAM (5SB12)
LF 442.500 $250.000 $366.000 $249.000 $440.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 683.000 $200.000 $32.300 $167.000 $385.000
RAIL (TY T223)
LF 204.000 $160.000 $207.000 $218.000 $275.000
ARMOR JOINT
LF 44.000 $120.000 $282.000 $126.000 $550.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $35,000.000 $61,000.000 $59,800.000 $3,300.000
MOBILIZATION
LS 1.000 $140,322.600 $93,000.000 $97,000.000 $110,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,000.000 $4,580.000 $3,500.000 $5,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $60.000 $127.000 $58.000 $55.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $16.000 $36.200 $19.000 $55.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 320.000 $5.000 $10.800 $6.000 $22.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 320.000 $1.500 $3.410 $1.300 $11.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $40.000 $80.000 $44.000 $44.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,250.000 $3,190.000 $2,300.000 $4,400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $4,640.000 $3,200.000 $4,400.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $21.000 $37.100 $51.000 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $28.000 $65.000 $51.000 $110.000
TACK COAT
GAL 43.000 $16.000 $21.300 $19.000 $110.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 47.000 $250.000 $402.000 $300.000 $330.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $5,890.000 $6,000.000 $2,200.000
Totals: $871,935.600 $937,938.800 $994,676.500 $1,198,442.500