Show Job Controls
Bid Cobra

HARDIN US 69 (0200-10-067)

Items: 58

County: HARDIN
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0200-10-067
DBE Goal: N/A
Project: NH 1802(598)
Guaranty: N/A
Time: 141 WORKING DAYS
Engineer's Estimate: $2,168,704.20
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: GR, BS, STR, PVMT, SIGN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,168,704.20
$1,853,959.54
Over/Under Est: -14.51% -$314,744.66
$2,444,886.00
Over/Under Est: 12.73% $276,181.80
Amt Left: 31.87% $590,926.46
Over/Under Est: 19.21% $416,578.60
Amt Left: 39.45% $731,323.26
Delta: -5.74% -$140,396.80
Over/Under Est: 19.59% $424,811.04
Amt Left: 39.89% $739,555.70
Delta: -0.32% -$8,232.44

Bid Items & Bid Tabulations

58 Total 0 of 58
HARDIN  |  US 69  |  BEAUMONT  |  0200-10-067  |  01/09/2019  |  $2,168,704.20  |  NH 1802(598)  |  GR, BS, STR, PVMT, SIGN  |  141 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
PTSS INVESTMENTS, LLC
HERITAGE ASPHALT COMPANY LLC
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 1.000 $1,000.000 $3,175.000 $10,000.000 $1,500.000 $5,000.000
SUBGRADE WIDENING (DENS CONT)
STA 42.000 $214.000 $925.000 $350.000 $750.000 $2,750.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 827.000 $16.500 $16.450 $25.000 $14.000 $40.000
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 13,886.000 $0.400 $0.280 $0.300 $1.000 $0.300
VEGETATIVE WATERING
MG 19.400 $19.500 $80.000 $30.000 $25.000 $50.000
ASPHALT STAB BASE (GR 1)(PG 64)
TON 3,164.000 $90.000 $64.750 $100.000 $93.000 $90.000
ASPH (CRS-2P)
GAL 27,809.000 $2.900 $2.800 $3.250 $4.300 $3.600
AGGR(TY-D GR-3 SAC-A)
CY 637.000 $118.000 $145.000 $150.000 $120.000 $140.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 1,905.000 $86.000 $72.000 $110.000 $100.000 $115.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 9,201.000 $114.000 $102.000 $130.000 $115.000 $145.000
RIPRAP (MOW STRIP)(4 IN)
CY 33.000 $445.000 $490.000 $475.000 $425.000 $750.000
RC PIPE (CL III)(36 IN)
LF 42.000 $116.000 $145.000 $125.000 $115.000 $250.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $3,215.000 $2,350.000 $3,500.000 $6,500.000 $4,500.000
MOBILIZATION
LS 1.000 $193,248.000 $86,010.000 $175,000.000 $235,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,500.000 $865.000 $5,000.000 $7,500.000 $4,500.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 186.000 $32.000 $46.000 $47.250 $45.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 186.000 $8.000 $12.000 $12.600 $12.000 $12.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,840.000 $6.000 $4.550 $4.750 $4.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,840.000 $1.500 $1.030 $1.050 $1.000 $1.000
INTERSECTIONS (ACP)
SY 392.000 $72.000 $28.850 $46.000 $12.000 $60.000
MTL W-BEAM GD FEN (TIM POST)
LF 875.000 $20.000 $21.000 $22.000 $30.000 $22.000
SHORT RADIUS
LF 72.000 $32.500 $29.000 $29.400 $70.000 $30.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 4.000 $800.000 $980.000 $1,024.000 $1,200.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 437.000 $3.000 $2.550 $2.620 $4.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $222.000 $226.000 $236.250 $150.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,156.000 $2,360.000 $2,468.000 $3,000.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $364.000 $228.000 $236.250 $300.000 $250.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 10.000 $270.000 $255.000 $236.250 $400.000 $250.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 4.000 $1,500.000 $1,210.000 $2,500.000 $3,000.000 $2,500.000
CONDT (PVC) (SCH 40) (2")
LF 750.000 $7.000 $15.050 $7.500 $11.000 $11.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 750.000 $15.000 $19.100 $18.500 $30.000 $23.000
ELEC CONDR (NO.12) INSULATED
LF 750.000 $1.000 $1.520 $1.250 $2.000 $2.350
GROUND BOX TY A (122311)W/APRON
EA 2.000 $723.000 $910.000 $875.000 $2,000.000 $1,250.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 5.000 $630.000 $1,320.000 $588.000 $1,200.000 $600.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 21.000 $330.000 $400.000 $383.250 $550.000 $400.000
REMOVE SM RD SN SUP&AM
EA 5.000 $76.000 $77.250 $78.750 $100.000 $80.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $50.000 $61.000 $56.700 $100.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 105.000 $17.000 $28.500 $28.350 $50.000 $28.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,610.000 $0.100 $0.270 $0.280 $0.350 $0.280
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 14,634.000 $0.250 $0.270 $0.280 $0.300 $0.280
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,810.000 $0.400 $0.560 $0.580 $0.600 $0.600
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,840.000 $0.100 $0.270 $0.280 $0.300 $0.280
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 16,440.000 $0.200 $0.270 $0.280 $0.300 $0.280
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,338.000 $0.900 $1.100 $2.250 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,152.000 $1.600 $1.100 $2.250 $1.000 $1.000
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 207.000 $1.800 $1.000 $1.050 $1.000 $1.100
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,810.000 $0.800 $0.760 $0.790 $0.750 $0.800
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,610.000 $0.350 $0.370 $0.390 $0.400 $0.380
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 14,634.000 $0.350 $0.370 $0.390 $0.350 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,840.000 $0.350 $0.370 $0.390 $0.300 $0.380
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 16,440.000 $0.350 $0.370 $0.390 $0.300 $0.380
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 88.000 $12.000 $13.250 $13.650 $14.000 $14.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 36.000 $200.000 $36.500 $37.800 $225.000 $38.000
PREFAB PAV MRK TY C (W) (WORD)
EA 3.000 $265.000 $226.000 $236.250 $275.000 $250.000
REFL PAV MRKR TY I-C
EA 255.000 $3.400 $3.550 $3.680 $4.000 $4.000
REFL PAV MRKR TY II-A-A
EA 386.000 $3.500 $3.550 $3.680 $4.000 $4.000
TMA (STATIONARY)
DAY 134.000 $143.000 $260.000 $275.000 $1,500.000 $100.000
TMA (MOBILE OPERATION)
DAY 22.000 $990.000 $51.000 $52.500 $1,200.000 $75.000
Totals: $2,168,704.200 $1,853,959.540 $2,444,886.000 $2,585,282.800 $2,593,515.240