HARDIN US 69 (0065-06-063)

Items: 104

County: HARDIN
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0065-06-063
DBE Goal: N/A
Project: C 65-6-63
Guaranty: N/A
Time: 262 WORKING DAYS
Engineer's Estimate: $9,307,320.10
Date: 06/07/2017 (9 years ago)
Contract Number: N/A
Type: CONSTRUCT FRONTAGE ROADS OVER PINE ISLAND BAYOU
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$9,307,320.10
Over/Under Est: 14.29% $1,330,460.09
Over/Under Est: 17.03% $1,585,092.64
Amt Left: 2.39% $254,632.55
Over/Under Est: 18.18% $1,691,813.13
Amt Left: 3.4% $361,353.04
Delta: -0.98% -$106,720.49

Bid Items & Bid Tabulations

104 Total 0 of 104
HARDIN  |  US 69  |  BEAUMONT  |  0065-06-063  |  06/07/2017  |  $9,307,320.10  |  C 65-6-63  |  CONSTRUCT FRONTAGE ROADS OVER PINE I...  |  262 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STERLING DELAWARE HOLDING COMPANY, INC.
JAMES CONSTRUCTION GROUP, L.L.C.
OLDCASTLE MATERIALS TEXAS, INC.
REMOVING CONC (PAV)
SY 806.000 $24.650 $12.000 $15.000 $8.300
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 13,986.000 $7.750 $2.360 $10.000 $3.600
EXCAVATION (ROADWAY)
CY 8,832.000 $10.800 $5.000 $14.000 $11.500
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 68,013.000 $32.000 $10.000 $20.000 $24.500
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
CY 2,512.000 $35.000 $73.000 $89.000 $61.000
BLADING
HR 25.111 $87.000 $110.000 $150.000 $130.000
FURNISHING AND PLACING TOPSOIL (4")
SY 70,527.000 $1.300 $3.000 $2.500 $1.500
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 70,527.000 $0.300 $0.300 $0.280 $0.290
CELL FBR MLCH SEED(TEMP)(WARM)
SY 35,264.000 $0.250 $0.330 $0.260 $0.270
CELL FBR MLCH SEED(TEMP)(COOL)
SY 35,264.000 $0.250 $0.330 $0.260 $0.270
VEGETATIVE WATERING
MG 1,777.000 $16.000 $20.000 $21.000 $17.000
PROOF ROLLING
HR 32.000 $65.000 $70.000 $125.000 $84.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 8.000 $38.500 $145.000 $85.000 $65.000
CEMENT
TON 1,302.000 $208.000 $180.000 $160.000 $159.000
CEMENT TREAT (NEW BASE) (8")
SY 23,962.000 $2.570 $22.000 $2.000 $20.500
CEMENT TREAT (SUBGRADE) (8")
SY 26,779.000 $2.500 $3.000 $2.000 $2.800
PRIME COAT (AE-P)
GAL 400.000 $3.300 $9.000 $4.500 $10.000
ASPH (MULTI OPTION)
GAL 9,410.000 $3.000 $6.750 $4.000 $3.800
AGGR(TY-PB GR-4 SAC-B)
CY 234.000 $79.000 $110.000 $210.000 $185.000
D-GR HMA(SQ) TY-D SAC-A PG76-22
TON 2,735.000 $115.000 $125.000 $95.000 $98.000
CONC PVMT (JOINTED - CPCD) (6")
SY 2,490.000 $60.000 $58.000 $63.000 $75.500
CONC PAV (JOINT REINF) (8")
SY 181.000 $60.000 $90.000 $130.000 $135.000
STRUCT EXCAV
CY 2,512.000 $10.000 $10.000 $18.000 $10.000
CEM STABIL BKFL
CY 424.000 $77.000 $70.000 $90.000 $83.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 1,009.000 $65.000 $460.000 $110.000 $100.000
DRILL SHAFT (42 IN)
LF 5,182.000 $230.000 $295.000 $430.000 $275.000
CL C CONC (ABUT)
CY 108.400 $1,150.000 $900.000 $1,200.000 $1,200.000
CL C CONC (CAP)
CY 239.400 $1,100.000 $1,750.000 $2,500.000 $2,000.000
CL C CONC (COLUMN)
CY 181.200 $1,000.000 $2,000.000 $2,000.000 $1,220.000
CL C CONC (RAIL FOUNDATION)
CY 77.200 $204.000 $500.000 $500.000 $445.000
REINF CONC SLAB
SF 49,600.000 $17.000 $25.000 $17.000 $31.000
APPROACH SLAB
CY 128.400 $460.000 $440.000 $500.000 $518.000
RETAINING WALL (MSE)
SF 7,437.000 $42.000 $83.000 $50.000 $64.000
PRESTR CONC GIRDER (TX40)
LF 6,160.330 $150.000 $192.000 $180.000 $139.000
RIPRAP (CONC)(4 IN)
CY 86.000 $479.000 $400.000 $400.000 $582.000
RIPRAP (CONC)(5 IN)
CY 202.000 $450.000 $440.000 $575.000 $560.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 22.000 $150.000 $330.000 $135.000 $180.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 136.000 $150.000 $350.000 $180.000 $190.000
BEDDING MATERIAL (6 IN)
CY 18.000 $100.000 $210.000 $130.000 $110.000
RIPRAP (CONC)(FLUME)
CY 35.000 $410.000 $440.000 $750.000 $620.000
RIPRAP (MOW STRIP)(4 IN)
CY 18.900 $540.000 $500.000 $500.000 $610.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 47,200.000 $3.610 $5.000 $4.000 $8.750
RAIL (TY T552)
LF 3,111.000 $50.000 $45.000 $42.000 $54.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 360.000 $95.000 $75.000 $100.000 $140.000
CONC BOX CULV (6 FT X 3 FT)
LF 95.000 $300.000 $260.000 $250.000 $345.000
RC PIPE (CL III)(24 IN)
LF 485.000 $86.500 $60.000 $85.000 $59.000
INLET (COMPL)(PSL)(SL)(3FTX5FT)
EA 3.000 $3,370.000 $5,200.000 $4,600.000 $5,824.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 2.000 $5,400.000 $7,500.000 $6,500.000 $8,320.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,200.000 $1,600.000 $4,000.000 $1,080.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $1,160.000 $2,100.000 $3,500.000 $1,195.000
REMOV STR (INLET)
EA 2.000 $900.000 $1,500.000 $950.000 $580.000
REMOV STR (MANHOLE)
EA 1.000 $1,100.000 $800.000 $2,000.000 $580.000
REMOV STR (HEADWALL)
EA 5.000 $1,300.000 $1,200.000 $1,200.000 $1,160.000
REMOV STR (PIPE)
LF 121.000 $16.000 $27.000 $25.000 $24.000
MOBILIZATION
LS 1.000 $880,000.000 $1,060,000.000 $1,080,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $4,800.000 $800.000 $8,500.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 180.000 $26.500 $31.550 $32.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 180.000 $9.000 $11.000 $8.000 $8.300
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $25.000 $32.510 $30.000 $27.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $13.000 $10.000 $7.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 360.000 $2.750 $5.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 360.000 $0.750 $3.000 $0.500 $0.520
CONSTRUCTING DETOURS
SY 140.000 $50.000 $80.000 $145.000 $95.000
CONC SIDEWALKS (5")
SY 19.170 $50.000 $70.000 $80.000 $116.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $1,535.000 $1,325.000 $1,378.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,100.000 $2,350.000 $2,050.000 $2,132.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 3.000 $1,600.000 $1,375.000 $1,050.000 $1,872.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 2.000 $1,400.000 $1,510.000 $1,120.000 $2,080.000
CONDT (PVC) (SCH 40) (2")
LF 377.000 $8.250 $10.000 $9.500 $10.400
CONDT (RM) (1")
LF 332.000 $23.000 $9.250 $19.000 $33.000
CONDT (RM) (2")
LF 37.000 $29.000 $30.000 $12.500 $52.000
ELEC CONDR (NO.8) BARE
LF 816.000 $1.250 $1.200 $0.800 $2.000
ELEC CONDR (NO.8) INSULATED
LF 1,632.000 $1.250 $1.300 $1.200 $1.700
GROUND BOX TY A (122311)W/APRON
EA 3.000 $900.000 $970.000 $750.000 $1,144.000
ELC SRV TY A 120/240 100(NS)SS(E)SP(O)
EA 1.000 $7,000.000 $6,580.000 $7,200.000 $6,240.000
ALUMINUM SIGNS (TY A)
SF 6.000 $24.000 $31.000 $25.000 $26.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 25.000 $500.000 $485.000 $600.000 $450.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $1,500.000 $1,700.000 $1,500.000 $2,080.000
REMOVE SM RD SN SUP&AM
EA 16.000 $100.000 $75.000 $220.000 $57.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 17.000 $19.000 $20.000 $15.000 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 14.000 $20.000 $20.000 $15.000 $15.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $52.000 $49.000 $48.000 $49.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 37.000 $2.100 $1.370 $1.250 $5.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 467.000 $0.200 $0.120 $1.000 $0.520
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 699.000 $0.600 $0.680 $1.200 $2.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 296.000 $0.900 $0.710 $0.500 $1.200
PAVEMENT SEALER 4"
LF 1,796.000 $0.100 $0.040 $0.100 $0.050
PAVEMENT SEALER (ARROW)
EA 3.000 $0.300 $14.720 $12.000 $5.200
PAVEMENT SEALER (SYMBOL)
EA 3.000 $650.000 $1.000 $15.000 $5.200
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 1,618.000 $1.000 $0.290 $0.900 $0.470
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 9,365.000 $0.350 $0.260 $1.000 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 7,973.000 $0.300 $0.270 $0.300 $0.420
PREFAB PAV MRK TY B (W)(ARROW)
EA 3.000 $100.000 $325.050 $200.000 $192.000
PREFAB PAV MRK TY B (W)(SYMBOL)
EA 3.000 $775.000 $600.000 $240.000 $260.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 45.000 $11.000 $12.930 $8.000 $14.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $180.000 $212.480 $200.000 $187.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $260.000 $290.920 $270.000 $239.000
REFL PAV MRKR TY II-C-R
EA 100.000 $4.000 $3.100 $3.500 $3.650
ELIM EXT PAV MRK & MRKS (4")
LF 50.000 $0.300 $0.340 $0.500 $1.040
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $45.000 $37.260 $35.000 $26.000
PAV SURF PREP FOR MRK (4")
LF 1,796.000 $0.300 $0.010 $0.050 $0.010
PAV SURF PREP FOR MRK (ARROW)
EA 3.000 $15.000 $4.770 $10.000 $5.200
PAV SURF PREP FOR MRK (ACC PRK)(LRG)
EA 3.000 $500.000 $185.310 $25.000 $10.400
WHEEL STOPS
EA 23.000 $150.000 $170.000 $25.000 $62.000
Totals: $9,307,320.097 $10,637,780.190 $10,892,412.740 $10,999,133.230