REMOVING CONC (RIPRAP)
|
SY
|
290.000
|
$45.000
|
$24.000
|
$120.000
|
$65.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
945.000
|
$15.000
|
$10.500
|
$50.000
|
$20.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
5,809.000
|
$0.500
|
$0.380
|
$5.850
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
150.000
|
$15.000
|
$50.000
|
$100.000
|
$18.000
|
|
|
PLANE ASPH CONC PAV (2"-3")
|
SY
|
722.000
|
$8.000
|
$16.000
|
$28.000
|
$45.000
|
|
|
PLANE ASPH CONC PAV (2" TO 4 3/4")
|
SY
|
756.000
|
$10.000
|
$18.000
|
$28.000
|
$55.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,223.900
|
$250.000
|
$105.000
|
$320.000
|
$250.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
461.000
|
$250.000
|
$170.000
|
$290.000
|
$300.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
200.000
|
$240.000
|
$120.000
|
$338.000
|
$300.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
16.000
|
$500.000
|
$215.000
|
$1,140.000
|
$800.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,447.000
|
$75.000
|
$95.000
|
$160.000
|
$55.000
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
313.200
|
$1,000.000
|
$1,400.000
|
$1,735.000
|
$750.000
|
|
|
APPROACH SLAB
|
CY
|
384.400
|
$675.000
|
$680.000
|
$1,235.000
|
$750.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
724.000
|
$28.000
|
$8.000
|
$10.000
|
$55.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
54.000
|
$275.000
|
$200.000
|
$220.000
|
$300.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
380.000
|
$150.000
|
$200.000
|
$196.000
|
$280.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
593.000
|
$265.000
|
$150.000
|
$220.000
|
$350.000
|
|
|
CONC STR REPR(REMOV AND REPL BACKWALL)
|
CY
|
23.200
|
$2,500.000
|
$3,150.000
|
$5,830.000
|
$2,500.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
19.200
|
$2,500.000
|
$2,550.000
|
$6,210.000
|
$2,500.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
36.700
|
$1,000.000
|
$670.000
|
$1,370.000
|
$850.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
6.000
|
$265.000
|
$420.000
|
$990.000
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
141.200
|
$500.000
|
$600.000
|
$1,100.000
|
$850.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
175.000
|
$25.000
|
$40.000
|
$60.000
|
$65.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
785.000
|
$35.000
|
$25.000
|
$34.000
|
$65.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
200.000
|
$50.000
|
$40.000
|
$60.000
|
$65.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
4,278.000
|
$80.000
|
$100.000
|
$82.000
|
$80.000
|
|
|
STR STEEL (PEDESTAL)
|
LB
|
11,868.000
|
$50.000
|
$25.000
|
$15.500
|
$54.000
|
|
|
STR STEEL (SHEAR ANCHOR)
|
LB
|
20.000
|
$200.000
|
$500.000
|
$530.000
|
$250.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$1,260,000.000
|
$1,750,000.000
|
$2,156,000.000
|
$3,350,000.000
|
|
|
RAIL (TY T221)
|
LF
|
104.000
|
$350.000
|
$180.000
|
$355.000
|
$500.000
|
|
|
RAIL (CLF-RO)
|
LF
|
1,720.000
|
$150.000
|
$118.250
|
$140.000
|
$350.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
253.000
|
$200.000
|
$160.000
|
$355.000
|
$350.000
|
|
|
RETROFIT RAIL (TY T551)
|
LF
|
1,312.000
|
$450.000
|
$120.000
|
$223.000
|
$650.000
|
|
|
SHOT BLASTING
|
SY
|
4,278.000
|
$15.000
|
$3.000
|
$9.000
|
$10.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$642,000.000
|
$750,000.000
|
$190,000.000
|
$125,000.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
10.000
|
$10,000.000
|
$7,500.000
|
$17,300.000
|
$9,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$850,000.000
|
$710,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$10,000.000
|
$42,750.000
|
$11,000.000
|
$65,000.000
|
|
|
FURNISH ADDITIONAL ARROW BOARD
|
HR
|
648.000
|
$50.000
|
$12.000
|
$8.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,421.000
|
$4.750
|
$2.500
|
$9.350
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,421.000
|
$1.350
|
$1.000
|
$2.350
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,624.000
|
$85.000
|
$70.000
|
$185.000
|
$150.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
2,370.000
|
$51.000
|
$75.000
|
$53.000
|
$105.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
4,140.000
|
$10.000
|
$10.000
|
$60.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
2,370.000
|
$20.000
|
$12.500
|
$53.000
|
$20.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,750.000
|
$30.000
|
$25.500
|
$30.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,500.000
|
$1,540.000
|
$1,800.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,500.000
|
$1,309.000
|
$1,530.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,550.000
|
$3.500
|
$2.350
|
$3.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$500.000
|
$350.000
|
$410.000
|
$250.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$1,540.000
|
$1,800.000
|
$350.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$1,000.000
|
$1,540.000
|
$1,800.000
|
$350.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,500.000
|
$3,199.000
|
$3,740.000
|
$4,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$300.000
|
$350.000
|
$410.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
9.000
|
$3,500.000
|
$2,800.000
|
$1,000.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$10,000.000
|
$2,400.000
|
$1,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
5.000
|
$12,000.000
|
$15,000.000
|
$7,500.000
|
$15,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
56.000
|
$40.000
|
$19.000
|
$23.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
56.000
|
$35.000
|
$19.000
|
$23.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
26.000
|
$40.000
|
$19.000
|
$23.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
26.000
|
$40.000
|
$19.000
|
$23.000
|
$85.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
34,723.000
|
$1.500
|
$0.650
|
$0.750
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
31,187.000
|
$1.500
|
$0.650
|
$0.750
|
$3.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
38,688.000
|
$0.300
|
$0.150
|
$0.200
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
1,844.000
|
$2.000
|
$0.850
|
$1.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
18,422.000
|
$0.650
|
$0.700
|
$0.850
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
18,422.000
|
$0.650
|
$0.700
|
$0.850
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
38,718.000
|
$0.650
|
$0.350
|
$2.750
|
$3.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
104,598.000
|
$0.080
|
$0.100
|
$0.150
|
$0.750
|
|
|
JT / CRCK SEAL (RUBBER - ASPHALT)
|
LF
|
400.000
|
$20.000
|
$5.000
|
$25.000
|
$25.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
2,900.000
|
$1.050
|
$5.000
|
$6.000
|
$25.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
290.000
|
$100.000
|
$60.000
|
$30.000
|
$85.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
90.000
|
$120.000
|
$80.000
|
$42.000
|
$165.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
880.000
|
$50.000
|
$40.000
|
$30.000
|
$100.000
|
|
|
REP STL BRDG MEMB (DRAIN HOLE RETROFIT)
|
EA
|
13.000
|
$2,000.000
|
$2,400.000
|
$2,300.000
|
$6,500.000
|
|
|
BRIDGE JOINT REPAIR (HEADER)
|
LF
|
200.000
|
$150.000
|
$50.000
|
$172.000
|
$350.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
681.000
|
$100.000
|
$175.000
|
$75.000
|
$350.000
|
|
|
TACK COAT
|
GAL
|
76.000
|
$10.000
|
$10.000
|
$25.000
|
$95.000
|
|
|
D-GR HMA TY-C SAC-A PG76-22 (EXEMPT)
|
TON
|
84.000
|
$130.000
|
$500.000
|
$400.000
|
$350.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
8.000
|
$350.000
|
$850.000
|
$500.000
|
$750.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
175.000
|
$80.000
|
$80.000
|
$130.000
|
$95.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
960.000
|
$31.000
|
$30.000
|
$40.000
|
$50.000
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
960.000
|
$2.000
|
$2.000
|
$5.000
|
$5.000
|
|
|
MODULAR GLARE SCREENS (MOVE)
|
LF
|
930.000
|
$2.500
|
$7.000
|
$10.000
|
$5.000
|
|
|
TMA (STATIONARY)
|
DAY
|
135.000
|
$290.000
|
$250.000
|
$365.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$350.000
|
$750.000
|
$900.000
|
$650.000
|
|
Totals: |
$7,925,258.140
|
$8,587,147.420
|
$9,865,738.050
|
$13,552,672.000
|