HANSFORD CR (0904-08-004)

Items: 53

County: HANSFORD
Length: N/A
Highway: CR
District: AMARILLO
Control Number: 0904-08-004
DBE Goal: N/A
Project: BR 2018(472)
Guaranty: N/A
Time: 176 WORKING DAYS
Engineer's Estimate: $1,515,659.72
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: REPLACE EXISTING OFF SYSTEM BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,515,659.72
$1,745,583.16
Over/Under Est: 15.17% $229,923.44
Over/Under Est: 30.71% $465,533.72
Amt Left: 13.5% $235,610.28
Over/Under Est: 56.31% $853,435.72
Amt Left: 35.72% $623,512.28
Delta: -19.58% -$387,902.00
$2,516,769.00
Over/Under Est: 66.05% $1,001,109.28
Amt Left: 44.18% $771,185.84
Delta: -6.23% -$147,673.56
$2,851,605.26
Over/Under Est: 88.14% $1,335,945.54
Amt Left: 63.36% $1,106,022.10
Delta: -13.30% -$334,836.26

Bid Items & Bid Tabulations

53 Total 0 of 53
HANSFORD  |  CR  |  AMARILLO  |  0904-08-004  |  04/03/2019  |  $1,515,659.72  |  BR 2018(472)  |  REPLACE EXIST OFF SYSTEM BRIDGE  |  176 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
STATELINE CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
DCI CONTRACTING, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 7.000 $400.000 $700.000 $295.000 $2,000.000 $620.000 $340.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 2.000 $1,200.000 $1,200.000 $675.000 $3,000.000 $2,100.000 $1,220.000
REMOVING STAB BASE AND ASPH PAV (11")
SY 452.000 $10.000 $25.000 $12.000 $40.000 $33.000 $10.000
OBLITERATING ABANDONED ROAD
SY 1,312.000 $1.000 $10.000 $22.000 $20.000 $12.500 $7.000
EXCAVATION (ROADWAY)
CY 2,426.000 $18.000 $15.000 $18.000 $20.000 $37.000 $17.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 2,889.000 $22.000 $30.000 $22.000 $30.000 $49.000 $20.000
BLADING
HR 20.000 $160.000 $85.000 $125.000 $100.000 $140.000 $200.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 10,773.440 $0.500 $1.500 $1.000 $1.000 $0.840 $0.600
DRILL SEED (TEMP)(WARM OR COOL)
SY 10,542.000 $0.500 $1.500 $1.000 $1.000 $0.840 $0.600
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 5,602.000 $24.000 $25.000 $34.000 $30.000 $44.520 $20.000
PRIME COAT (MC-30)
GAL 444.000 $4.500 $10.000 $16.000 $20.000 $22.000 $8.000
EMULS ASPH (EROSN CONT)(MS-2)
GAL 613.000 $4.500 $10.000 $18.000 $20.000 $15.000 $8.000
ASPH (MULTI OPTION)
GAL 1,201.000 $4.500 $10.000 $19.000 $20.000 $15.000 $10.000
AGGR(TY-B GR-3 SAC-B)
CY 11.000 $150.000 $500.000 $1,000.000 $1,000.000 $420.000 $330.000
AGGR(TY-B GR-4 SAC-B)
CY 16.000 $150.000 $500.000 $1,200.000 $1,000.000 $460.000 $330.000
SUPERPAVE MIXTURES SP-C PG70-28
TON 149.000 $130.000 $280.000 $265.000 $300.000 $360.000 $160.000
CEM STABIL BKFL
CY 9.000 $200.000 $300.000 $450.000 $400.000 $730.000 $325.000
TEMPORARY SPL SHORING
SF 1,780.000 $30.000 $10.000 $45.000 $15.000 $21.000 $17.000
RAIL (TY PR11)
LF 168.000 $100.000 $120.000 $165.000 $120.000 $180.000 $110.000
GABION MATTRESSES (GALV)(12 IN)
SY 615.000 $80.000 $130.000 $185.000 $200.000 $138.000 $85.000
GABION MATTRESSES (GALV) (24 IN)
SY 153.000 $150.000 $250.000 $245.000 $220.000 $269.000 $115.000
CONC BOX CULV (8 FT X 8 FT)
LF 64.000 $1,200.000 $900.000 $1,050.000 $1,500.000 $1,250.000 $1,125.000
CONC BOX CULV (9 FT X 5 FT)
LF 184.000 $600.000 $850.000 $1,050.000 $2,600.000 $1,280.000 $1,070.000
CONC BOX CULV (9 FT X 7 FT)
LF 64.000 $1,100.000 $1,000.000 $1,495.000 $1,500.000 $1,738.000 $4,220.000
CONC BOX CULV (9 FT X 9 FT)
LF 64.000 $1,400.000 $1,000.000 $1,680.000 $1,600.000 $1,815.000 $4,530.000
RC PIPE (CL III)(24 IN)
LF 60.000 $100.000 $100.000 $225.000 $100.000 $126.000 $117.000
WINGWALL (PW - 1) (HW=14 FT)
EA 2.000 $85,000.000 $70,000.000 $53,000.000 $90,000.000 $113,000.000 $144,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $18,000.000 $20,000.000 $29,000.000 $24,000.000 $33,000.000 $44,000.000
WINGWALL (PW - 2) (HW=13 FT)
EA 2.000 $46,000.000 $70,000.000 $48,000.000 $80,000.000 $88,700.000 $103,000.000
WINGWALL (PW - 2) (HW=9 FT)
EA 2.000 $30,000.000 $40,000.000 $39,500.000 $40,000.000 $43,000.000 $60,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,000.000 $2,000.000 $1,650.000 $2,000.000 $2,660.000 $3,135.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $22,000.000 $23,000.000 $8,500.000 $15,000.000 $16,500.000 $70,000.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $10,000.000 $18,000.000 $10,500.000 $15,000.000 $15,680.000 $85,270.000
MOBILIZATION
LS 1.000 $115,000.000 $185,000.000 $175,000.000 $160,000.000 $266,000.000 $285,000.000
BARR, SIGNS, TRAFFIC HANDLING
EA 4.000 $14,625.000 $7,500.000 $9,500.000 $8,000.000 $20,500.000 $15,000.000
BLADING WORK (EROSION & SEDMT CONT)
HR 12.000 $160.000 $85.000 $125.000 $100.000 $140.000 $170.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 475.000 $6.000 $5.000 $3.000 $6.000 $6.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 475.000 $1.000 $1.000 $1.000 $2.000 $2.000 $4.000
CONC SIDEWALKS (4")
SY 253.000 $120.000 $80.000 $58.000 $110.000 $84.000 $95.000
CURB RAMPS (TY 10)
SY 8.000 $140.000 $80.000 $1,850.000 $3,000.000 $315.000 $253.000
MTL W-BEAM GD FEN (STEEL POST)
LF 725.000 $27.000 $40.000 $35.000 $26.000 $45.000 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,300.000 $1,500.000 $1,450.000 $1,200.000 $3,200.000 $1,400.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $1,200.000 $1,200.000 $1,100.000 $1,400.000 $2,800.000 $19,450.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,650.000 $3,000.000 $3,550.000 $2,600.000 $4,000.000 $3,150.000
WIRE FENCE (TY C)
LF 70.000 $11.000 $15.000 $22.000 $25.000 $28.000 $111.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $900.000 $650.000 $800.000 $800.000 $980.000 $820.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $300.000 $400.000 $800.000 $500.000 $280.000 $1,210.000
REMOVE SM RD SN SUP&AM
EA 7.000 $105.000 $150.000 $200.000 $100.000 $140.000 $140.000
INSTL DEL ASSM (D-SR)SZ 2(WC)GND
EA 8.000 $25.000 $40.000 $30.000 $50.000 $70.000 $120.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $35.000 $40.000 $30.000 $30.000 $70.000 $40.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,340.000 $0.500 $11.000 $4.000 $12.000 $3.000 $10.000
REP STL BRIDGE MEMBER (TRUSS DIAGONAL)
EA 1.000 $2,500.000 $2,500.000 $18,000.000 $5,000.000 $3,000.000 $3,500.000
REP STL BRIDGE MEMBER (BOTTOM CHORD)
EA 2.000 $3,000.000 $4,000.000 $22,000.000 $5,000.000 $3,500.000 $3,500.000
Totals: $1,515,659.720 $1,745,583.160 $1,981,193.440 $2,369,095.440 $2,516,769.010 $2,851,605.264