PREPARING ROW
|
STA
|
790.250
|
$700.000
|
$500.000
|
$250.000
|
$415.000
|
$250.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
106.000
|
$25.000
|
$25.000
|
$27.000
|
$11.000
|
$12.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,798.000
|
$12.000
|
$15.000
|
$13.000
|
$14.600
|
$14.000
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
397.000
|
$8.000
|
$25.000
|
$23.000
|
$20.000
|
$22.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
28,425.000
|
$10.000
|
$15.000
|
$14.000
|
$12.650
|
$15.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
380,242.000
|
$0.450
|
$0.200
|
$0.100
|
$1.250
|
$0.250
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
380,242.000
|
$0.200
|
$0.120
|
$0.120
|
$0.130
|
$0.120
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
190,121.000
|
$0.070
|
$0.100
|
$0.100
|
$0.110
|
$0.100
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
190,121.000
|
$0.070
|
$0.090
|
$0.090
|
$0.100
|
$0.090
|
|
|
|
VEGETATIVE WATERING
|
MG
|
6,454.000
|
$15.000
|
$1.000
|
$1.000
|
$20.000
|
$0.010
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
14,109.000
|
$1.000
|
$1.250
|
$1.250
|
$1.100
|
$1.000
|
|
|
|
PROOF ROLLING
|
HR
|
114.000
|
$90.000
|
$50.000
|
$68.000
|
$85.000
|
$106.200
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
41,972.000
|
$35.000
|
$45.000
|
$55.500
|
$49.900
|
$62.000
|
|
|
|
FL BS (RDWY DEL)(TY D GR 3)(FINAL POS)
|
CY
|
42,083.000
|
$35.000
|
$40.000
|
$36.000
|
$37.750
|
$43.000
|
|
|
|
REWORK BS MTL (TY C)(5.5")(ORD COMP)
|
SY
|
179,634.000
|
$2.000
|
$1.000
|
$1.250
|
$1.150
|
$2.000
|
|
|
|
CEMENT
|
TON
|
3,256.000
|
$150.000
|
$185.000
|
$180.000
|
$185.000
|
$170.000
|
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
268,775.000
|
$2.000
|
$2.500
|
$1.500
|
$2.600
|
$3.300
|
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
|
GAL
|
53,745.000
|
$1.500
|
$3.000
|
$2.350
|
$3.850
|
$3.850
|
|
|
|
ASPH (CRS-2)
|
GAL
|
113,406.000
|
$2.500
|
$3.000
|
$2.700
|
$3.450
|
$2.800
|
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
1,857.000
|
$90.000
|
$85.000
|
$125.000
|
$115.000
|
$96.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
3,200.000
|
$45.000
|
$45.000
|
$60.000
|
$58.000
|
$45.000
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
9,222.000
|
$1.750
|
$2.500
|
$1.750
|
$1.900
|
$1.750
|
|
|
|
CEM STABIL BKFL
|
CY
|
958.000
|
$115.000
|
$150.000
|
$160.000
|
$180.000
|
$150.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
707.000
|
$120.000
|
$90.000
|
$115.000
|
$178.000
|
$10.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
558.000
|
$3.000
|
$15.000
|
$6.450
|
$1.100
|
$6.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,440.000
|
$15.000
|
$20.000
|
$20.400
|
$0.010
|
$19.000
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
583.000
|
$140.000
|
$100.000
|
$197.000
|
$125.000
|
$184.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
100.000
|
$240.000
|
$275.000
|
$279.000
|
$255.000
|
$260.000
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
94.000
|
$300.000
|
$375.000
|
$372.000
|
$360.000
|
$346.000
|
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
50.000
|
$350.000
|
$475.000
|
$508.000
|
$470.000
|
$473.000
|
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
50.000
|
$500.000
|
$575.000
|
$619.000
|
$560.000
|
$576.000
|
|
|
|
CONC BOX CULV (8 FT X 7 FT)
|
LF
|
96.000
|
$900.000
|
$775.000
|
$946.000
|
$870.000
|
$880.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,248.000
|
$40.000
|
$60.000
|
$50.000
|
$0.000
|
$47.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
600.000
|
$60.000
|
$75.000
|
$70.000
|
$81.000
|
$66.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
88.000
|
$110.000
|
$100.000
|
$96.000
|
$102.000
|
$90.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
602.000
|
$140.000
|
$125.000
|
$129.000
|
$138.000
|
$120.000
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
50.000
|
$100.000
|
$85.000
|
$74.000
|
$70.000
|
$69.000
|
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
180.000
|
$125.000
|
$125.000
|
$124.000
|
$95.000
|
$116.000
|
|
|
|
RC PIPE (CL III) (24 IN) (ALT)
|
LF
|
624.000
|
$60.000
|
$70.000
|
$62.000
|
$0.000
|
$58.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
9.000
|
$5,500.000
|
$4,500.000
|
$7,400.000
|
$5,500.000
|
$6,897.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
12.000
|
$7,000.000
|
$7,500.000
|
$8,400.000
|
$9,900.000
|
$7,904.000
|
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$10,000.000
|
$7,500.000
|
$8,700.000
|
$8,600.000
|
$8,172.000
|
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$12,500.000
|
$12,500.000
|
$10,600.000
|
$12,100.000
|
$9,880.000
|
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$15,000.000
|
$20,000.000
|
$12,500.000
|
$21,250.000
|
$11,647.000
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$22,000.000
|
$35,000.000
|
$20,400.000
|
$33,000.000
|
$19,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$25,000.000
|
$45,000.000
|
$26,800.000
|
$40,700.000
|
$25,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$950.000
|
$1,000.000
|
$850.000
|
$937.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
52.000
|
$1,200.000
|
$1,000.000
|
$1,175.000
|
$985.000
|
$1,097.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,100.000
|
$1,150.000
|
$1,120.000
|
$950.000
|
$1,041.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
19.000
|
$1,300.000
|
$1,200.000
|
$1,200.000
|
$1,050.000
|
$1,128.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$1,400.000
|
$1,250.000
|
$1,420.000
|
$1,200.000
|
$1,321.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,800.000
|
$2,000.000
|
$1,625.000
|
$1,400.000
|
$1,513.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$2,500.000
|
$3,500.000
|
$2,950.000
|
$2,500.000
|
$2,753.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
2,201.000
|
$15.000
|
$15.000
|
$9.600
|
$16.000
|
$9.000
|
|
|
|
REMOV STR (MASONARY)
|
LF
|
29.000
|
$1,000.000
|
$50.000
|
$19.000
|
$50.000
|
$18.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,249,000.000
|
$1,200,000.000
|
$1,365,000.000
|
$1,250,000.000
|
$1,389,380.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
$12,800.000
|
$36,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
5,598.000
|
$30.000
|
$20.000
|
$28.500
|
$30.000
|
$26.500
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
5,598.000
|
$10.000
|
$3.000
|
$9.500
|
$10.000
|
$9.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
35,925.000
|
$3.000
|
$2.500
|
$3.400
|
$2.750
|
$2.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
35,925.000
|
$1.000
|
$0.500
|
$0.250
|
$0.500
|
$0.250
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,300.000
|
$50.000
|
$60.000
|
$92.000
|
$167.000
|
$1.000
|
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$8.000
|
$30.000
|
$50.000
|
$16.000
|
$42.200
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,940.000
|
$5.000
|
$5.000
|
$32.000
|
$18.500
|
$23.350
|
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$6.000
|
$25.000
|
$50.000
|
$16.000
|
$41.700
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
106.000
|
$90.000
|
$100.000
|
$100.000
|
$150.000
|
$90.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
11,497.000
|
$35.000
|
$20.000
|
$42.000
|
$46.000
|
$36.050
|
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
1,543.000
|
$35.000
|
$45.000
|
$52.000
|
$56.000
|
$46.500
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
54.000
|
$1,800.000
|
$1,500.000
|
$2,200.000
|
$1,600.000
|
$985.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$700.000
|
$1,000.000
|
$1,200.000
|
$2,300.000
|
$690.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$9,000.000
|
$9,200.000
|
$9,950.000
|
$8,600.000
|
|
|
|
WIRE FENCE (TY A)
|
LF
|
925.000
|
$15.000
|
$25.000
|
$16.000
|
$20.000
|
$81.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
41.000
|
$200.000
|
$160.000
|
$215.000
|
$200.000
|
$160.000
|
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
7.000
|
$230.000
|
$250.000
|
$265.000
|
$235.000
|
$225.000
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
7.000
|
$550.000
|
$700.000
|
$590.000
|
$650.000
|
$680.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
274.000
|
$450.000
|
$450.000
|
$590.000
|
$580.000
|
$450.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
12.000
|
$600.000
|
$600.000
|
$645.000
|
$740.000
|
$580.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$685.000
|
$625.000
|
$695.000
|
$715.000
|
$615.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
2.000
|
$1,650.000
|
$1,500.000
|
$1,075.000
|
$1,210.000
|
$1,456.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$700.000
|
$860.000
|
$750.000
|
$1,100.000
|
$855.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$950.000
|
$825.000
|
$800.000
|
$910.000
|
$810.000
|
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
212.000
|
$200.000
|
$250.000
|
$215.000
|
$175.000
|
$225.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
138.000
|
$75.000
|
$70.000
|
$86.000
|
$90.000
|
$66.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
157,500.000
|
$0.250
|
$0.120
|
$0.120
|
$0.120
|
$0.110
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
120.000
|
$0.300
|
$5.000
|
$2.420
|
$2.500
|
$2.250
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
157,500.000
|
$0.250
|
$0.120
|
$0.390
|
$0.400
|
$0.360
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
141,400.000
|
$0.650
|
$0.010
|
$0.010
|
$0.010
|
$0.010
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,938.000
|
$1.000
|
$1.250
|
$1.400
|
$1.700
|
$1.150
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
28.000
|
$1.000
|
$2.000
|
$2.150
|
$2.500
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
331.000
|
$8.500
|
$7.500
|
$7.740
|
$8.000
|
$7.200
|
|
|
|
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
|
LF
|
28.000
|
$1.000
|
$2.000
|
$2.150
|
$2.500
|
$2.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
15,026.000
|
$0.350
|
$0.450
|
$0.450
|
$0.460
|
$0.420
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
95.000
|
$0.300
|
$1.000
|
$1.080
|
$1.100
|
$1.000
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
17,307.000
|
$0.300
|
$0.500
|
$0.540
|
$0.550
|
$0.500
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
137,886.000
|
$0.600
|
$0.700
|
$0.720
|
$0.740
|
$0.670
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
9,555.000
|
$0.400
|
$0.800
|
$0.840
|
$0.860
|
$0.780
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
89,817.000
|
$0.700
|
$0.750
|
$0.810
|
$0.830
|
$0.750
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,860.000
|
$3.500
|
$4.500
|
$4.570
|
$4.680
|
$4.250
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$2,500.000
|
$4,000.000
|
$4,800.000
|
$3,500.000
|
$8,300.000
|
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
28,817.000
|
$95.000
|
$79.500
|
$107.000
|
$105.000
|
$115.000
|
|
|
|
UNDERSEAL COURSE
|
GAL
|
65,548.000
|
$3.000
|
$3.000
|
$3.000
|
$5.000
|
$0.010
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$8,750.000
|
$5,000.000
|
$14,300.000
|
$9,205.000
|
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
80.000
|
$3.500
|
$35.000
|
$35.000
|
$37.000
|
$33.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$150.000
|
$200.000
|
$25.000
|
$55.000
|
$240.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
544.000
|
$60.000
|
$25.000
|
$5.000
|
$30.000
|
$15.000
|
|
1
|
|
THERMO PIPE(18")(HDPE)(TY S)(CSB)
|
LF
|
1,248.000
|
$40.000
|
$0.000
|
$0.000
|
$52.000
|
$0.000
|
|
1
|
|
THERMO PIPE(24")(HDPE)(TY S)(CSB)
|
LF
|
624.000
|
$60.000
|
$0.000
|
$0.000
|
$75.000
|
$0.000
|
|
Totals: |
$13,812,615.940
|
$13,587,882.830
|
$14,971,009.490
|
$16,341,799.180
|
$16,586,021.590
|