HAMILTON FM 218 (0120-05-026)

Items: 107

County: HAMILTON
Length: N/A
Highway: FM 218
District: WACO
Control Number: 0120-05-026
DBE Goal: N/A
Project: STP 2020(564)
Guaranty: N/A
Time: 240 WORKING DAYS
Engineer's Estimate: $4,906,992.28
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: REHAB & WIDEN ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$4,906,992.28
$5,387,759.04
Over/Under Est: 9.8% $480,766.76
Over/Under Est: 15.44% $757,846.27
Amt Left: 5.14% $277,079.51
Over/Under Est: 30.44% $1,493,674.50
Amt Left: 18.8% $1,012,907.74
Delta: -12.99% -$735,828.23
Over/Under Est: 39.22% $1,924,690.80
Amt Left: 26.8% $1,443,924.04
Delta: -6.73% -$431,016.30
$7,946,877.60
Over/Under Est: 61.95% $3,039,885.32
Amt Left: 47.5% $2,559,118.56
Delta: -16.32% -$1,115,194.52

Bid Items & Bid Tabulations

107 Total 0 of 107
HAMILTON  |  FM 218  |  WACO  |  0120-05-026  |  02/07/2020  |  $4,906,992.28  |  STP 2020(564)  |  REHAB & WIDEN ROADWAY  |  240 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
JAMES CONSTRUCTION GROUP, L.L.C.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 86.000 $1,000.000 $500.000 $500.000 $325.000 $8,000.000 $2,873.890
REMOVING CONCRETE(MOW STRIP)
LF 1,111.000 $7.000 $10.000 $7.500 $6.000 $1.890 $20.000
EXCAVATION (ROADWAY)
CY 5,292.000 $5.370 $17.000 $15.000 $19.000 $10.000 $9.780
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 9,638.000 $13.000 $17.000 $15.000 $20.000 $15.000 $18.520
FURNISHING AND PLACING TOPSOIL (4")
SY 129,148.000 $0.910 $0.750 $0.500 $0.650 $0.150 $1.270
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 129,148.000 $0.120 $0.140 $0.130 $0.140 $0.240 $0.140
DRILL SEEDING (TEMP) (WARM)
SY 64,574.000 $0.070 $0.090 $0.100 $0.110 $0.190 $0.110
DRILL SEEDING (TEMP) (COOL)
SY 64,574.000 $0.070 $0.090 $0.100 $0.110 $0.190 $0.100
VEGETATIVE WATERING
MG 2,098.000 $9.030 $5.000 $5.000 $28.000 $38.630 $14.190
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 8,000.000 $1.410 $1.500 $1.100 $1.000 $1.290 $1.050
PROOF ROLLING
HR 72.000 $75.000 $80.000 $60.000 $98.000 $66.540 $181.700
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 14,047.000 $34.920 $45.000 $47.500 $50.000 $49.470 $79.040
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
CY 9,863.000 $30.000 $40.000 $39.000 $50.000 $54.330 $82.990
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 68,619.000 $3.000 $1.000 $1.250 $2.250 $8.000 $2.020
CEMENT
TON 1,068.000 $135.000 $150.000 $150.000 $150.000 $147.800 $207.100
CEMENT TREAT(EXIST MATL)(8")
SY 89,712.000 $2.280 $2.000 $1.500 $3.000 $2.180 $1.980
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
GAL 44,865.000 $2.200 $2.500 $1.000 $3.250 $2.810 $5.870
ASPH (CRS-2)
GAL 37,950.000 $2.150 $2.700 $2.500 $2.300 $2.300 $3.910
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 623.000 $108.000 $87.000 $104.000 $117.000 $117.000 $150.420
PLANE ASPH CONC PAV(0" TO 2")
SY 1,599.000 $3.000 $5.000 $5.500 $2.900 $4.430 $7.330
CEM STABIL BKFL
CY 930.500 $63.540 $100.000 $162.000 $171.580 $131.880 $81.620
CUT & RESTORING PAV
SY 166.000 $66.000 $100.000 $280.000 $50.000 $50.720 $113.980
TRENCH EXCAVATION PROTECTION
LF 42.000 $2.500 $20.000 $21.000 $10.000 $25.000 $18.280
TEMPORARY SPL SHORING
SF 2,301.000 $20.000 $20.000 $26.000 $17.080 $25.580 $28.450
DRILL SHAFT (24 IN)
LF 376.000 $150.000 $225.000 $210.000 $200.000 $194.930 $174.150
CL B CONC (FLUME)
CY 5.800 $970.000 $800.000 $750.000 $800.000 $600.140 $787.340
CL C CONC (ABUT)(HPC)
CY 28.400 $890.800 $2,000.000 $1,560.000 $1,650.000 $975.570 $1,608.980
CL C CONC (CAP)(HPC)
CY 22.400 $1,043.770 $2,000.000 $1,975.000 $1,850.000 $1,469.070 $1,463.650
CL C CONC (COLUMN)(HPC)
CY 10.400 $875.000 $2,000.000 $2,100.000 $2,200.000 $1,912.660 $1,680.430
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 5,175.000 $22.000 $17.000 $20.000 $31.750 $12.200 $25.630
APPROACH SLAB (HPC)
CY 69.000 $523.630 $500.000 $525.000 $650.000 $498.820 $873.450
PRESTR CONC SLAB BEAM (4SB15)
LF 681.000 $132.000 $180.000 $185.000 $200.000 $146.370 $252.090
PRESTR CONC SLAB BEAM (5SB15)
LF 454.000 $153.190 $180.000 $200.000 $250.000 $165.540 $252.090
RIPRAP (CONC)(4 IN)
CY 3.000 $650.000 $600.000 $525.000 $1,000.000 $620.380 $733.500
RIPRAP (STONE PROTECTION)(12 IN)
CY 19.000 $180.000 $125.000 $105.000 $225.000 $97.300 $176.860
RIPRAP (STONE PROTECTION)(30 IN)
CY 1,031.000 $186.510 $150.000 $105.000 $125.000 $116.300 $148.170
RIPRAP (MOW STRIP)(4 IN)
CY 83.000 $440.180 $450.000 $550.000 $414.000 $411.460 $759.890
RAIL (TY T1W)
LF 254.000 $230.000 $200.000 $205.000 $170.000 $159.870 $191.250
ARMOR JOINT (SEALED)
LF 82.000 $85.000 $100.000 $94.000 $85.000 $54.310 $90.090
GABION MATTRESSES (GALV)(18 IN)
SY 215.400 $164.030 $200.000 $140.000 $330.000 $128.000 $141.570
GABIONS (3' X 3')(GALV)
CY 90.200 $195.570 $400.000 $210.000 $450.000 $389.000 $449.300
CONC BOX CULV (4 FT X 2 FT)
LF 272.000 $200.000 $300.000 $315.000 $360.000 $252.030 $316.010
RC PIPE (CL III)(18 IN)
LF 374.000 $50.650 $60.000 $58.000 $52.000 $67.770 $62.160
RC PIPE (CL III)(30 IN)
LF 146.000 $96.000 $110.000 $152.000 $92.000 $155.980 $133.480
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $6,800.000 $7,215.000 $7,850.000 $6,000.000 $8,160.590 $6,332.200
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
EA 12.000 $4,600.000 $6,500.000 $6,300.000 $2,800.000 $4,388.040 $8,515.460
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $780.000 $800.000 $895.000 $950.000 $999.260 $1,753.700
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 3.000 $1,800.000 $1,200.000 $2,600.000 $1,200.000 $2,503.100 $3,419.360
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,425.000 $1,400.000 $3,100.000 $1,500.000 $2,344.480 $4,156.510
CLEAN EXIST CULVERTS
EA 2.000 $2,114.510 $2,500.000 $2,100.000 $2,000.000 $3,011.270 $1,967.260
REMOV STR (SET)
EA 12.000 $397.630 $345.000 $785.000 $750.000 $272.030 $580.400
REMOV STR (PIPE)
LF 531.000 $10.760 $12.000 $31.000 $10.000 $21.760 $19.490
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $17,769.000 $25,000.000 $45,000.000 $52,000.000 $27,467.630 $48,897.270
SALV MATRL (CREDIT ITEM)
LS 1.000 $1.000 $1.000 $0.010 $1.000 $0.010 $1.220
MOBILIZATION
LS 1.000 $431,273.640 $504,000.000 $555,000.000 $753,485.000 $613,613.840 $733,459.060
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $5,000.000 $5,000.000 $9,350.000 $3,500.000 $8,269.700 $18,336.480
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,300.000 $26.000 $20.000 $31.500 $30.420 $24.450 $33.470
ROCK FILTER DAMS (REMOVE)
LF 3,300.000 $4.710 $3.000 $8.680 $8.680 $6.880 $9.210
TEMP SEDMT CONT FENCE (INSTALL)
LF 13,658.000 $2.730 $3.000 $3.700 $2.500 $2.890 $3.010
TEMP SEDMT CONT FENCE (REMOVE)
LF 13,658.000 $0.350 $0.500 $0.500 $0.500 $0.440 $0.930
CONSTRUCTING DETOURS
SY 640.000 $58.040 $50.000 $60.000 $29.000 $38.420 $88.920
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 7.000 $3,660.000 $5,000.000 $5,500.000 $4,200.000 $3,553.970 $5,733.370
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 1,140.000 $19.000 $12.000 $12.500 $8.200 $8.660 $21.410
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,140.000 $14.000 $7.000 $13.000 $9.150 $2.250 $6.910
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,140.000 $14.000 $10.000 $12.000 $7.450 $6.730 $16.210
PORT CTB (FUR&INST)(F-SHAPE)(TY1)(MOD)
LF 120.000 $210.000 $250.000 $210.000 $215.000 $197.990 $36.670
DRIVEWAYS (ACP)
SY 1,900.000 $28.570 $25.000 $35.000 $26.550 $31.080 $36.370
TURNOUTS (ACP)
SY 148.000 $32.710 $40.000 $50.000 $31.050 $88.200 $50.970
INTERSECTIONS (ACP) (TYPE 1)
SY 1,373.000 $35.000 $30.000 $30.000 $26.650 $33.650 $16.020
INTERSECTIONS (ACP) (TYPE 2)
SY 1,245.000 $50.000 $35.000 $40.000 $35.800 $33.530 $29.340
MTL W-BEAM GD FEN (STEEL POST)
LF 975.000 $25.090 $30.000 $23.500 $22.500 $22.000 $25.710
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,946.540 $2,000.000 $2,100.000 $1,500.000 $1,700.000 $1,783.840
REMOVE METAL BEAM GUARD FENCE
LF 1,111.000 $2.730 $3.000 $3.400 $3.250 $3.000 $2.730
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,375.000 $3,000.000 $2,700.000 $2,575.000 $2,600.000 $2,673.700
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,400.000 $4,000.000 $2,000.000 $1,375.000 $3,950.000 $4,275.940
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $3,500.000 $2,500.000 $1,375.000 $3,250.000 $1,440.890
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,000.000 $3,500.000 $1,000.000 $800.000 $1,500.000 $1,423.310
WIRE FENCE (TY D)
LF 40.000 $25.000 $60.000 $40.000 $25.000 $95.000 $45.520
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 6.000 $200.000 $200.000 $210.000 $166.650 $190.000 $247.240
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $261.110 $250.000 $236.000 $204.410 $220.000 $281.900
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $500.000 $400.000 $473.000 $339.500 $420.000 $449.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 55.000 $463.780 $500.000 $448.000 $481.950 $425.000 $519.050
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $500.000 $550.000 $500.000 $505.860 $475.000 $618.670
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 15.000 $515.810 $575.000 $500.000 $549.100 $475.000 $726.200
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $552.830 $700.000 $579.000 $665.000 $550.000 $717.330
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $759.110 $750.000 $684.000 $702.310 $650.000 $801.950
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 4.000 $700.000 $1,000.000 $789.000 $906.010 $750.000 $989.290
REMOVE SM RD SN SUP&AM
EA 78.000 $72.210 $100.000 $100.000 $73.040 $100.000 $91.450
INSTL OM ASSM (OM-2Y)(WC)GND
EA 14.000 $77.270 $100.000 $105.000 $84.500 $100.000 $85.010
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $36.680 $30.000 $38.000 $36.000 $18.000 $36.180
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,203.000 $0.200 $1.000 $1.000 $0.650 $0.650 $0.280
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 3,956.000 $0.200 $1.000 $1.000 $0.800 $0.800 $0.310
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 96.000 $4.400 $7.000 $6.350 $6.000 $6.000 $5.610
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,846.000 $0.450 $2.500 $2.110 $2.000 $2.000 $0.980
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 20.000 $10.000 $35.000 $31.000 $30.000 $30.000 $17.460
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,460.000 $0.900 $1.000 $1.250 $1.000 $0.790 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 228.000 $4.960 $8.000 $7.370 $7.000 $7.000 $7.850
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 49,183.000 $0.530 $0.750 $0.680 $0.650 $0.650 $0.660
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 3,855.000 $0.710 $1.000 $0.790 $0.750 $0.750 $0.680
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 30,931.000 $0.580 $0.750 $0.720 $0.680 $0.680 $0.680
REFL PAV MRKR TY II-A-A
EA 474.000 $4.000 $5.000 $4.480 $4.250 $4.250 $3.570
FULL - WIDTH MOWING
CYC 3.000 $4,879.740 $2,500.000 $2,100.000 $3,100.000 $4,879.000 $4,740.960
D-GR HMA TY-C SAC-B PG64-22
TON 9,200.000 $65.000 $72.000 $84.000 $96.000 $86.000 $99.020
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,125.000 $10,000.000 $7,500.000 $6,000.000 $593.750 $8,505.040
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $3.370 $25.000 $22.000 $21.000 $21.000 $4.910
TMA (STATIONARY)
DAY 133.000 $190.000 $150.000 $250.000 $235.000 $387.500 $366.730
TMA (MOBILE OPERATION)
HR 48.000 $40.000 $50.000 $65.000 $10.000 $68.010 $122.240
Totals: $4,906,992.284 $5,387,761.040 $5,664,838.550 $6,400,668.780 $6,831,683.102 $7,946,880.054