HALL SH 86 (0105-02-023)

Items: 44

County: HALL
Length: N/A
Highway: SH 86
District: CHILDRESS
Control Number: 0105-02-023
DBE Goal: N/A
Project: BR 2024(528)
Guaranty: N/A
Time: 89 WORKING DAYS
Engineer's Estimate: $5,833,051.45
Date: 10/05/2023 (2 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,833,051.45
$6,639,789.50
Over/Under Est: 13.83% $806,738.05
$7,314,134.15
Over/Under Est: 25.39% $1,481,082.70
Amt Left: 10.16% $674,344.65
$7,379,932.36
Over/Under Est: 26.52% $1,546,880.91
Amt Left: 11.15% $740,142.86
Delta: -0.90% -$65,798.21
$8,165,961.56
Over/Under Est: 39.99% $2,332,910.11
Amt Left: 22.99% $1,526,172.06
Delta: -10.65% -$786,029.20
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 2.11% $145,963.33
BARRICADES UNLIMITED 0.54% $37,355.54
SURFACE PREPARATION TECHNOLOGIES, LLC 0.34% $23,520.16
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.27% $18,677.77
Total: 3.26% $225,516.80

Bid Items & Bid Tabulations

44 Total 0 of 44
HALL  |  SH 86  |  CHILDRESS  |  0105-02-023  |  10/05/2023  |  $5,833,051.45  |  BR 2024(528)  |  OVERLAY  |  89 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
DUININCK, INC.
RK HALL, LLC
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 200.000 $40.000 $45.500 $500.000 $71.500 $100.060
BACKFILL (TY A OR B)
STA 457.000 $148.000 $160.000 $250.000 $300.000 $465.970
BLADING
HR 5.000 $210.000 $510.000 $250.000 $390.000 $257.110
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 21.000 $810.000 $845.000 $500.000 $510.000 $511.750
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 21.000 $810.000 $635.000 $500.000 $510.000 $511.750
VEGETATIVE WATERING
MG 1,711.000 $50.000 $30.000 $30.000 $31.500 $48.380
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 20,335.000 $4.500 $4.000 $4.500 $4.000 $4.130
PLANE ASPH CONC PAV(0" TO 2")
SY 1,600.000 $4.000 $8.250 $12.000 $15.000 $11.230
FLOWABLE BACKFILL
CY 35.000 $350.000 $520.000 $1,000.000 $400.000 $402.500
RIPRAP (STONE PROTECTION)(24 IN)
CY 41.480 $230.000 $315.000 $1,000.000 $490.000 $698.310
CONC BOX CULV (7 FT X 3 FT)
LF 114.000 $920.000 $1,292.000 $1,500.000 $2,000.000 $1,840.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $18,750.000 $13,200.000 $10,000.000 $17,000.000 $17,250.000
REMOV STR (BOX CULVERT)
EA 1.000 $22,000.000 $25,000.000 $20,000.000 $17,000.000 $16,100.000
REMOV STR (WINGWALL)
EA 2.000 $1,600.000 $3,125.000 $5,000.000 $1,700.000 $2,875.000
MOBILIZATION
LS 1.000 $569,300.000 $661,000.000 $725,000.000 $740,000.000 $750,714.810
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $12,000.000 $30,000.000 $50,000.000 $31,000.000 $27,034.380
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 300.000 $8.000 $9.000 $10.000 $7.750 $7.760
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $8,600.000 $9,000.000 $7,000.000 $6,300.000 $7,739.420
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 300.000 $30.000 $38.000 $25.000 $34.500 $34.500
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 300.000 $30.000 $13.000 $10.000 $23.000 $23.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 300.000 $25.000 $37.500 $25.000 $34.500 $34.500
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 90,647.000 $0.300 $0.200 $0.250 $0.140 $0.130
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 45,753.000 $0.300 $0.200 $0.300 $0.210 $0.120
CRASH CUSH ATTEN (DES SOURCE)
EA 4.000 $3,050.000 $3,150.000 $1,000.000 $3,400.000 $3,450.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,200.000 $1,900.000 $1,000.000 $2,900.000 $2,875.000
CRASH CUSH ATTEN (STKPL)
EA 4.000 $1,200.000 $2,600.000 $1,000.000 $2,300.000 $230.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $150.000 $160.000 $120.000 $145.000 $143.750
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 360.000 $3.750 $6.350 $6.000 $5.750 $6.900
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,100.000 $1.000 $1.600 $1.500 $1.150 $1.730
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $15.000 $26.400 $25.000 $15.000 $28.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,400.000 $1.000 $1.600 $1.500 $1.150 $1.730
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 6,668.000 $1.100 $1.550 $1.500 $1.650 $2.730
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 24.000 $9.000 $26.400 $25.000 $16.000 $28.750
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 90,695.000 $0.950 $0.750 $0.680 $0.780 $0.780
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 9,380.000 $0.950 $0.800 $0.760 $0.790 $0.870
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 44,730.000 $0.950 $0.800 $0.740 $0.790 $0.850
REFL PAV MRKR TY II-A-A
EA 1,025.000 $3.000 $6.350 $6.000 $5.750 $6.900
ELIM EXT PAV MRK & MRKS (4")
LF 2,780.000 $0.450 $3.200 $3.000 $1.150 $3.450
D-GR HMA TY-D SAC-A PG70-28
TON 33,642.000 $125.000 $143.750 $152.700 $159.000 $176.610
TACK COAT
GAL 30,584.000 $4.000 $4.400 $5.500 $4.000 $6.320
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $8,600.000 $20,000.000 $11,500.000 $15,733.200
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 144.000 $65.000 $21.150 $20.000 $23.000 $23.000
TMA (STATIONARY)
DAY 6.000 $300.000 $380.000 $950.000 $285.000 $618.990
TMA (MOBILE OPERATION)
HR 56.000 $50.000 $85.000 $95.000 $115.000 $151.080
Totals: $5,833,051.450 $6,639,789.500 $7,314,134.150 $7,379,932.360 $8,165,961.569