PREPARING ROW
|
AC
|
2.700
|
$10,000.000
|
$6,000.000
|
$125,000.000
|
$15,000.000
|
$4,000.000
|
$14,500.000
|
$10,000.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
8.000
|
$600.000
|
$700.000
|
$2,000.000
|
$500.000
|
$725.000
|
$840.000
|
$850.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
534.000
|
$50.000
|
$65.000
|
$30.000
|
$14.000
|
$25.000
|
$56.500
|
$66.500
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,581.000
|
$5.500
|
$5.000
|
$5.000
|
$13.000
|
$4.000
|
$5.650
|
$4.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (13")
|
SY
|
3,460.000
|
$6.000
|
$5.000
|
$3.000
|
$13.000
|
$10.000
|
$9.750
|
$8.500
|
|
|
REMOVING STAB BASE & ASPH PAV (18")
|
SY
|
23,400.000
|
$8.500
|
$4.500
|
$4.000
|
$15.000
|
$8.000
|
$7.000
|
$8.500
|
|
|
REMOV STAB BASE AND ASPH PAV (0" - 13")
|
SY
|
1,432.000
|
$15.000
|
$6.000
|
$3.000
|
$11.000
|
$12.000
|
$7.500
|
$8.300
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
33,858.000
|
$3.000
|
$1.000
|
$2.000
|
$1.000
|
$8.000
|
$6.950
|
$6.100
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
216,920.000
|
$6.000
|
$6.750
|
$6.000
|
$7.000
|
$7.000
|
$8.350
|
$7.050
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
5,250.000
|
$7.500
|
$10.000
|
$6.000
|
$13.000
|
$11.000
|
$18.500
|
$8.600
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
111,011.000
|
$7.000
|
$5.000
|
$4.000
|
$3.000
|
$8.000
|
$6.800
|
$7.950
|
|
|
BACKFILL (TY B)
|
STA
|
167.000
|
$165.000
|
$115.000
|
$200.000
|
$150.000
|
$115.000
|
$90.000
|
$100.000
|
|
|
BLADING
|
HR
|
71.000
|
$137.000
|
$100.000
|
$100.000
|
$125.000
|
$170.000
|
$375.000
|
$360.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
30.600
|
$368.000
|
$500.000
|
$600.000
|
$365.000
|
$349.000
|
$365.000
|
$370.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
15.300
|
$300.000
|
$385.000
|
$375.000
|
$365.000
|
$319.000
|
$335.000
|
$335.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
15.300
|
$300.000
|
$415.000
|
$475.000
|
$365.000
|
$365.000
|
$385.000
|
$385.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,177.000
|
$21.500
|
$14.000
|
$25.000
|
$20.000
|
$25.000
|
$25.500
|
$48.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
15,488.000
|
$1.200
|
$1.250
|
$2.500
|
$1.150
|
$1.050
|
$1.100
|
$1.100
|
|
|
PROOF ROLLING
|
HR
|
24.000
|
$60.000
|
$75.000
|
$100.000
|
$88.000
|
$115.000
|
$145.000
|
$75.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
37,738.000
|
$27.000
|
$72.500
|
$76.000
|
$74.000
|
$50.000
|
$87.000
|
$94.650
|
|
|
PRIME COAT (MC-30)
|
GAL
|
13,934.000
|
$4.250
|
$4.000
|
$5.000
|
$4.300
|
$5.000
|
$4.050
|
$4.300
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
27,659.000
|
$3.400
|
$3.000
|
$3.000
|
$3.300
|
$4.000
|
$3.350
|
$3.400
|
|
|
ASPH (CRS-2P)
|
GAL
|
30,261.000
|
$4.150
|
$3.050
|
$5.000
|
$3.500
|
$4.000
|
$3.750
|
$3.650
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
619.000
|
$120.000
|
$140.000
|
$150.000
|
$150.000
|
$150.000
|
$140.000
|
$138.000
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
51,949.000
|
$3.100
|
$1.300
|
$2.000
|
$2.000
|
$2.000
|
$1.550
|
$1.800
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
1,094.000
|
$8.000
|
$4.000
|
$8.000
|
$3.000
|
$11.000
|
$10.500
|
$10.300
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
23,399.000
|
$3.500
|
$1.500
|
$2.000
|
$3.000
|
$3.000
|
$2.700
|
$2.550
|
|
|
CEM STABIL BKFL
|
CY
|
306.000
|
$160.000
|
$140.000
|
$300.000
|
$275.000
|
$220.000
|
$275.000
|
$223.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,214.000
|
$18.000
|
$20.000
|
$20.000
|
$45.000
|
$30.000
|
$12.500
|
$18.200
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
296.000
|
$100.000
|
$100.000
|
$125.000
|
$88.000
|
$80.000
|
$92.500
|
$163.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,160.000
|
$220.000
|
$220.000
|
$250.000
|
$242.000
|
$210.000
|
$255.000
|
$316.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
70.000
|
$250.000
|
$275.000
|
$350.000
|
$260.000
|
$486.000
|
$265.000
|
$264.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
114.800
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
$1,500.000
|
$1,100.000
|
$1,650.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
81.200
|
$1,300.000
|
$1,300.000
|
$1,000.000
|
$1,100.000
|
$2,000.000
|
$1,100.000
|
$1,665.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
63.200
|
$990.000
|
$1,250.000
|
$1,000.000
|
$1,100.000
|
$880.000
|
$1,200.000
|
$1,475.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
19,200.000
|
$25.000
|
$25.000
|
$25.000
|
$20.000
|
$28.000
|
$21.000
|
$36.500
|
|
|
APPROACH SLAB (HPC)
|
CY
|
114.000
|
$680.000
|
$675.000
|
$1,000.000
|
$700.000
|
$900.000
|
$800.000
|
$875.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
2,384.240
|
$215.000
|
$150.000
|
$180.000
|
$163.000
|
$165.000
|
$170.000
|
$170.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
22.000
|
$150.000
|
$150.000
|
$300.000
|
$330.000
|
$260.000
|
$105.000
|
$125.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
385.000
|
$350.000
|
$600.000
|
$600.000
|
$560.000
|
$680.000
|
$630.000
|
$510.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
3,119.000
|
$95.000
|
$125.000
|
$100.000
|
$140.000
|
$95.000
|
$120.000
|
$117.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
35.000
|
$500.000
|
$625.000
|
$600.000
|
$700.000
|
$589.000
|
$630.000
|
$740.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
1,088.000
|
$97.000
|
$160.000
|
$150.000
|
$140.000
|
$130.000
|
$145.000
|
$123.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
180.000
|
$95.000
|
$125.000
|
$150.000
|
$150.000
|
$120.000
|
$155.000
|
$170.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
178.000
|
$90.000
|
$100.000
|
$100.000
|
$88.000
|
$115.000
|
$115.000
|
$161.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,400.000
|
$2,000.000
|
$2,500.000
|
$1,000.000
|
$1,400.000
|
$1,800.000
|
$3,600.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$5,000.000
|
$5,000.000
|
$100.000
|
$4,400.000
|
$3,250.000
|
$7,900.000
|
$4,665.000
|
|
|
REMOV STR (PIPE)
|
LF
|
136.000
|
$20.000
|
$10.000
|
$10.000
|
$32.000
|
$25.000
|
$21.000
|
$34.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$85,000.000
|
$50,000.000
|
$100,000.000
|
$35,000.000
|
$90,000.000
|
$36,000.000
|
$66,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,090,112.000
|
$900,000.000
|
$1,300,000.000
|
$880,000.000
|
$1,300,000.000
|
$1,400,000.000
|
$1,600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$16,000.000
|
$3,000.000
|
$5,000.000
|
$20,000.000
|
$20,000.000
|
$5,800.000
|
$9,300.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
200.000
|
$25.000
|
$30.000
|
$50.000
|
$45.000
|
$50.000
|
$42.000
|
$48.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$4.500
|
$10.000
|
$10.000
|
$11.000
|
$16.000
|
$10.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$4.500
|
$4.000
|
$4.000
|
$3.000
|
$7.000
|
$2.350
|
$5.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.950
|
$2.650
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,500.000
|
$5.000
|
$7.000
|
$5.500
|
$4.700
|
$5.000
|
$4.750
|
$7.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,000.000
|
$1.000
|
$1.000
|
$1.000
|
$0.800
|
$1.000
|
$0.790
|
$2.650
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,656.000
|
$48.000
|
$110.000
|
$100.000
|
$100.000
|
$150.000
|
$105.000
|
$105.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
6,080.000
|
$30.000
|
$50.000
|
$80.000
|
$92.000
|
$80.000
|
$86.500
|
$94.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
680.000
|
$10.000
|
$16.500
|
$10.000
|
$15.000
|
$8.000
|
$13.500
|
$12.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
6,080.000
|
$8.500
|
$18.500
|
$10.000
|
$22.000
|
$7.000
|
$6.400
|
$18.250
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
307.000
|
$55.000
|
$28.000
|
$40.000
|
$55.000
|
$43.000
|
$42.000
|
$31.750
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
1,534.000
|
$25.000
|
$55.000
|
$50.000
|
$30.000
|
$45.000
|
$46.000
|
$64.300
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
27,144.000
|
$0.400
|
$0.300
|
$0.500
|
$0.250
|
$0.400
|
$0.170
|
$0.350
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,025.000
|
$25.500
|
$28.000
|
$30.000
|
$29.000
|
$41.000
|
$28.500
|
$35.650
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,100.000
|
$1,800.000
|
$2,000.000
|
$2,000.000
|
$2,210.000
|
$1,900.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,700.000
|
$3.000
|
$2.000
|
$2.000
|
$3.200
|
$1.750
|
$3.150
|
$3.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,400.000
|
$2,200.000
|
$2,500.000
|
$3,000.000
|
$2,890.000
|
$2,900.000
|
$3,456.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
1.000
|
$1,200.000
|
$1,300.000
|
$1,500.000
|
$1,200.000
|
$600.000
|
$1,200.000
|
$2,110.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$240.000
|
$250.000
|
$500.000
|
$430.000
|
$205.000
|
$420.000
|
$320.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,600.000
|
$1,000.000
|
$1,000.000
|
$1,700.000
|
$1,524.850
|
$3,400.000
|
$2,640.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,450.000
|
$1,250.000
|
$500.000
|
$800.000
|
$641.620
|
$2,600.000
|
$1,055.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$7,000.000
|
$8,500.000
|
$7,500.000
|
$8,000.000
|
$10,929.470
|
$10,500.000
|
$7,900.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
3.000
|
$1,900.000
|
$2,200.000
|
$2,500.000
|
$2,200.000
|
$1,900.000
|
$2,100.000
|
$2,000.000
|
|
|
IN RD IL (TY SA) 50T-8-8 (400W EQ) LED
|
EA
|
4.000
|
$4,600.000
|
$7,500.000
|
$9,000.000
|
$7,400.000
|
$5,000.000
|
$7,400.000
|
$7,390.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,368.000
|
$11.000
|
$27.000
|
$30.000
|
$26.000
|
$22.000
|
$26.500
|
$26.400
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
960.000
|
$1.000
|
$0.550
|
$1.000
|
$0.550
|
$1.100
|
$0.530
|
$0.550
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
960.000
|
$1.000
|
$0.500
|
$1.000
|
$0.550
|
$1.250
|
$0.530
|
$0.550
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,368.000
|
$1.250
|
$1.750
|
$2.000
|
$1.600
|
$1.350
|
$1.600
|
$1.600
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,736.000
|
$1.250
|
$2.000
|
$2.000
|
$2.000
|
$1.550
|
$1.850
|
$1.850
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,100.000
|
$1,750.000
|
$3,000.000
|
$1,600.000
|
$900.000
|
$1,600.000
|
$1,585.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
4.000
|
$1,100.000
|
$850.000
|
$1,250.000
|
$1,200.000
|
$700.000
|
$1,100.000
|
$1,160.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
20.000
|
$1,000.000
|
$575.000
|
$1,000.000
|
$750.000
|
$750.000
|
$750.000
|
$900.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
21.000
|
$600.000
|
$525.000
|
$750.000
|
$610.000
|
$500.000
|
$610.000
|
$740.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$250.000
|
$200.000
|
$150.000
|
$120.000
|
$65.000
|
$115.000
|
$105.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
6.000
|
$70.000
|
$50.000
|
$100.000
|
$75.000
|
$75.000
|
$73.500
|
$130.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
38.000
|
$30.000
|
$25.000
|
$50.000
|
$32.000
|
$28.000
|
$31.500
|
$16.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
12.000
|
$40.000
|
$25.000
|
$50.000
|
$32.000
|
$37.000
|
$31.500
|
$19.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
16.000
|
$120.000
|
$50.000
|
$50.000
|
$32.000
|
$27.000
|
$31.500
|
$145.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
6.000
|
$180.000
|
$50.000
|
$50.000
|
$32.000
|
$45.000
|
$31.500
|
$145.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
19.000
|
$75.000
|
$50.000
|
$50.000
|
$32.000
|
$25.000
|
$31.500
|
$145.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
42.000
|
$110.000
|
$50.000
|
$50.000
|
$32.000
|
$165.000
|
$31.500
|
$145.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
37,022.000
|
$0.250
|
$0.250
|
$0.300
|
$0.250
|
$0.250
|
$0.160
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
37,022.000
|
$0.250
|
$0.250
|
$0.300
|
$0.250
|
$0.250
|
$0.160
|
$0.260
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
96.000
|
$5.500
|
$10.000
|
$11.000
|
$11.000
|
$10.000
|
$2.650
|
$10.550
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
138.000
|
$5.500
|
$10.000
|
$11.000
|
$11.000
|
$10.000
|
$2.650
|
$10.550
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,510.000
|
$1.200
|
$0.850
|
$1.000
|
$0.900
|
$0.820
|
$0.890
|
$0.870
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
180.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$9.000
|
$5.250
|
$9.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
12.000
|
$235.000
|
$150.000
|
$200.000
|
$160.000
|
$150.000
|
$26.500
|
$158.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
1.000
|
$224.000
|
$200.000
|
$300.000
|
$260.000
|
$250.000
|
$160.000
|
$264.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
4.000
|
$520.000
|
$575.000
|
$750.000
|
$600.000
|
$550.000
|
$405.000
|
$580.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
4,517.000
|
$0.350
|
$0.400
|
$0.500
|
$0.400
|
$0.350
|
$0.130
|
$0.370
|
|
|
PAVEMENT SEALER 8"
|
LF
|
380.000
|
$0.850
|
$0.750
|
$1.000
|
$0.750
|
$0.700
|
$0.370
|
$0.740
|
|
|
PAVEMENT SEALER 24"
|
LF
|
86.000
|
$3.700
|
$3.250
|
$5.000
|
$3.200
|
$3.000
|
$2.450
|
$3.170
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$60.000
|
$55.000
|
$10.000
|
$53.000
|
$50.000
|
$44.500
|
$55.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
1.000
|
$60.000
|
$55.000
|
$100.000
|
$53.000
|
$50.000
|
$53.500
|
$55.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
2.000
|
$110.000
|
$225.000
|
$250.000
|
$220.000
|
$200.000
|
$97.000
|
$210.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
20,238.000
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
$0.410
|
$0.400
|
$0.430
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
16,095.000
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
$0.410
|
$0.400
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,607.000
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
$0.410
|
$0.400
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
23,213.000
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
$0.410
|
$0.400
|
$0.430
|
|
REFL PAV MRKR TY I-C
|
EA
|
327.000
|
$4.000
|
$5.000
|
$6.000
|
$5.500
|
$5.000
|
$3.400
|
$5.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
18.000
|
$10.000
|
$5.000
|
$6.000
|
$5.500
|
$5.000
|
$3.400
|
$5.300
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,219.000
|
$0.350
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$0.410
|
$1.050
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,517.000
|
$0.100
|
$0.500
|
$0.500
|
$0.400
|
$0.350
|
$0.060
|
$0.370
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
380.000
|
$0.200
|
$0.750
|
$1.000
|
$0.750
|
$0.700
|
$0.160
|
$0.740
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
86.000
|
$0.800
|
$3.250
|
$4.000
|
$3.200
|
$3.000
|
$0.790
|
$3.170
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$39.000
|
$55.000
|
$75.000
|
$53.000
|
$50.000
|
$25.500
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$64.000
|
$55.000
|
$75.000
|
$53.000
|
$50.000
|
$31.500
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
2.000
|
$63.000
|
$105.000
|
$150.000
|
$110.000
|
$100.000
|
$96.000
|
$105.000
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
361.000
|
$150.000
|
$250.000
|
$110.000
|
$145.000
|
$150.000
|
$150.000
|
$140.000
|
|
|
D-GR HMA TY-D SAC-A PG70-28
|
TON
|
16,330.000
|
$135.000
|
$165.000
|
$110.000
|
$132.000
|
$120.000
|
$120.000
|
$113.250
|
|
|
TACK COAT
|
GAL
|
7,911.000
|
$4.000
|
$4.000
|
$5.000
|
$3.300
|
$3.000
|
$2.900
|
$3.500
|
|
|
REPLACE BREAKAWAY FUSE HOLDER
|
EA
|
3.000
|
$220.000
|
$175.000
|
$500.000
|
$160.000
|
$230.000
|
$160.000
|
$160.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$12,000.000
|
$15,000.000
|
$20,000.000
|
$15,000.000
|
$13,000.000
|
$21,700.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
5,177.000
|
$14.000
|
$23.000
|
$18.000
|
$30.000
|
$13.000
|
$26.500
|
$25.000
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
5,177.000
|
$2.000
|
$1.500
|
$1.000
|
$2.200
|
$1.000
|
$1.300
|
$0.700
|
|
|
MODULAR GLARE SCREENS (MOVE)
|
LF
|
677.000
|
$3.000
|
$2.500
|
$25.000
|
$5.500
|
$6.000
|
$7.900
|
$2.700
|
|
|
TMA (STATIONARY)
|
DAY
|
74.000
|
$160.000
|
$295.000
|
$200.000
|
$220.000
|
$150.000
|
$265.000
|
$425.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
54.000
|
$100.000
|
$50.000
|
$500.000
|
$50.000
|
$10.000
|
$1,100.000
|
$700.000
|
|
Totals: |
$11,569,451.900
|
$13,478,722.750
|
$13,645,013.900
|
$13,948,620.970
|
$13,992,724.870
|
$14,977,296.580
|
$16,008,127.050
|