Show Job Controls
Bid Cobra

HALE IH0027 (6469-81-001)

Items: 47

County: HALE
Length: 0.0100 MILES
Highway: IH0027
District: LUBBOCK
Control Number: 6469-81-001
DBE Goal: N/A
Project: RMC - 646981001
Guaranty: $44,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $2,224,912.00
Date: 10/02/2024 (1 year ago)
Contract Number: 10244206
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00210615
Project Description: FY25 PLAINVIEW MBGF/CABLE BARRIER REPAIR
Mail/Deliver Bids To: N/A
MIKE STROOPE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,224,912.00
$2,193,772.50
Over/Under Est: -1.4% -$31,139.50
$2,795,423.00
Over/Under Est: 25.64% $570,511.00
Amt Left: 27.43% $601,650.50

Bid Items & Bid Tabulations

47 Total 0 of 47
HALE  |  IH0027  |  LUBBOCK  |  6469-81-001  |  10/02/2024  |  $2,224,912.00  |  RMC - 646981001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
ROSS SA ENTERPRISE LLC
REMOV CONC (RIPRAP)
SY 34.000 $500.000 $250.000 $48.000
BACKFILL (TY A)
LF 78.000 $200.000 $70.000 $68.000
RIPRAP (CONC) (CL B) (6 IN)
CY 12.000 $750.000 $1,500.000 $500.000
MOBILIZATION (CALLOUT)
EA 12.000 $1,000.000 $1.000 $1.000
MOBILIZATION (EMERGENCY)
EA 12.000 $1,000.000 $2,000.000 $1,000.000
TMA (STATIONARY)
DAY 200.000 $100.000 $0.100 $1,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50,000.000 $25.000 $16.500 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 115.000 $500.000 $1,600.000 $1,800.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $500.000 $1,200.000 $1,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 50.000 $1,500.000 $900.000 $900.000
MTL BM GD FEN TRANS (NON - SYM)
EA 14.000 $1,000.000 $750.000 $500.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $85.000 $100.000 $70.000
MTL BM GD FEN TRANS (31"-28")
EA 20.000 $100.000 $100.000 $550.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 30.000 $1,000.000 $450.000 $500.000
MTL W-BEAM GD FEN (NESTED)(STEEL POST)
LF 75.000 $113.000 $40.000 $50.000
TL-3 31" SHORT RADIUS (COMPLETE)
EA 4.000 $114.000 $4,500.000 $1,000.000
MBGF (W-BEAM) (MED BAR)
LF 1,425.000 $75.000 $35.920 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 50,000.000 $5.000 $1.000 $0.500
REMOVE TERMINAL ANCHOR SECTION
EA 60.000 $117.000 $1.000 $150.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $118.000 $1.000 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 250.000 $119.000 $2,000.000 $2,750.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 25.000 $120.000 $1.000 $300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 250.000 $35.000 $1.000 $1.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,000.000 $25,500.000 $25,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 450.000 $10.000 $5.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 600.000 $10.000 $5.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 300.000 $10.000 $5.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 100.000 $10.000 $5.000 $20.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 2,000.000 $20.000 $6.000 $20.000
REPLACE TIMBER POST W/O CONC FND
EA 250.000 $100.000 $10.000 $1.000
REPLACE STEEL POST W/O CONC FND
EA 250.000 $100.000 $10.000 $80.000
REPLACE TIMBER POST W/ CONC FND
EA 250.000 $100.000 $10.000 $1.000
REPLACE STEEL POST W/ CONC FND
EA 250.000 $100.000 $10.000 $80.000
REALIGN POSTS
EA 100.000 $50.000 $1.000 $20.000
REPLACE BLOCKOUT
EA 100.000 $175.000 $200.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $150.000 $1.000 $125.000
RESET SGT IMPACT HEAD
EA 10.000 $50.000 $1.000 $250.000
REPLACE SGT OBJECT MARKER
EA 10.000 $25.000 $1.000 $20.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 50.000 $200.000 $2,700.000 $940.000
REPLACE POSTS (TL-4)(TRINITY)
EA 50.000 $200.000 $2,250.000 $980.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $50.000 $10.000 $200.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $200.000 $0.100 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $2,500.000 $10,000.000 $4,000.000
REPLACE CABLE (TL-4)
LF 1,000.000 $5.000 $2.500 $3.000
CHECK / RE-TENSION CABLE (TL-4)
EA 25.000 $750.000 $1.000 $1.000
REPLACE POST HARDWARE (TL-4)
EA 25.000 $50.000 $1,000.000 $50.000
Totals: $2,224,912.000 $2,193,772.500 $2,795,423.000