Show Job Controls
Bid Cobra

HALE FM0789 (6345-88-001)

Items: 20

County: HALE
Length: N/A
Highway: FM0789
District: LUBBOCK
Control Number: 6345-88-001
DBE Goal: N/A
Project: RMC - 634588001
Guaranty: N/A
Time: 80 W
Engineer's Estimate: $157,888.00
Date: 03/20/2020 (6 years ago)
Contract Number: N/A
Type: DRAINAGE STRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$157,888.00
$209,325.00
Over/Under Est: 32.58% $51,437.00
Over/Under Est: 79.91% $126,162.00
Amt Left: 35.7% $74,725.00
Over/Under Est: 106.37% $167,952.00
Amt Left: 55.66% $116,515.00
Delta: -14.71% -$41,790.00

Bid Items & Bid Tabulations

20 Total 0 of 20
HALE  |  FM0789  |  LUBBOCK  |  6345-88-001  |  03/20/2020  |  $157,888.00  |  RMC - 634588001  |  DRAINAGE STRUCT  |  80 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
NELMS SERVICES, INC.
L A FULLER & SONS CONSTRUCTION, LTD.
FNH CONSTRUCTION, LLC
PREPARING ROW
AC 0.500 $5,000.000 $1,000.000 $9,572.000 $35,000.000
EXCAVATION (ROADWAY)
CY 83.000 $16.000 $150.000 $19.000 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 24.000 $35.000 $200.000 $36.000 $100.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,415.000 $12.000 $55.000 $27.300 $60.000
D-GR HMA(SQ) TY-B PG64-22
TON 42.000 $130.000 $200.000 $389.000 $250.000
CEM STABIL BKFL
CY 66.000 $250.000 $250.000 $120.000 $350.000
FLOWABLE BACKFILL
CY 25.000 $250.000 $400.000 $127.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 42.000 $25.000 $200.000 $3.300 $10.000
RIPRAP (CONC)(4 IN)
CY 69.000 $400.000 $200.000 $1,096.000 $650.000
RC PIPE (CL III)(24 IN)
LF 96.000 $128.000 $100.000 $200.000 $125.000
RC PIPE (CL III)(36 IN)
LF 56.000 $200.000 $100.000 $357.000 $200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $2,000.000 $1,000.000 $3,876.000 $3,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 4.000 $2,025.000 $1,000.000 $4,202.000 $3,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,500.000 $1,000.000 $6,709.000 $6,000.000
REMOV STR (PIPE)
EA 2.000 $1,000.000 $1,000.000 $1,254.000 $2,500.000
MOBILIZATION
LS 1.000 $15,000.000 $10,000.000 $28,692.900 $28,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,500.000 $3,000.000 $4,805.000 $8,500.000
PREFAB PAV MRK TY C (W) (4") (SLD)
LF 32.000 $1.000 $100.000 $5.000 $10.000
PREFAB PAV MRK TY C (Y) (4") (BRK)
LF 10.000 $1.000 $100.000 $5.000 $10.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 250.000 $5.000 $25.000 $17.000 $20.000
Totals: $157,888.000 $209,325.000 $284,050.000 $325,840.000