HALE US 70 (0145-05-032)

Items: 69

County: HALE
Length: N/A
Highway: US 70
District: LUBBOCK
Control Number: 0145-05-032
DBE Goal: N/A
Project: STP 2019(750)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $14,105,188.61
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR, LEVEL-UP, OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$14,105,188.61
$18,510,115.03
Over/Under Est: 31.23% $4,404,926.42
$20,525,499.20
Over/Under Est: 45.52% $6,420,310.59
Amt Left: 10.89% $2,015,384.17

Bid Items & Bid Tabulations

69 Total 0 of 69
HALE  |  US 70  |  LUBBOCK  |  0145-05-032  |  04/03/2019  |  $14,105,188.61  |  STP 2019(750)  |  PAVMT REPAIR, LEVEL-UP, OVERLAY  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
J. LEE MILLIGAN, INC.
REMOVING CONC (DRIVEWAYS)
SY 274.000 $11.600 $23.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 1,094.000 $6.200 $10.500 $5.200
OBLITERATING ABANDONED ROAD
SY 1,065.000 $4.000 $11.500 $13.600
SUBGRADE WIDENING (DENS CONT)
STA 198.000 $523.950 $660.000 $565.000
BACKFILL (TY B)
STA 608.000 $160.000 $80.000 $150.000
BLADING
STA 608.000 $130.000 $80.000 $99.000
PROOF ROLLING
HR 50.000 $89.840 $165.000 $108.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 21,662.000 $15.000 $12.500 $14.800
PRIME COAT (MC-30)
GAL 4,329.000 $3.840 $4.850 $6.100
EMULS ASPH (EROSN CONT)(SS-1)
GAL 40,451.000 $3.100 $3.600 $3.600
FOG SEAL (CSS-1H)
GAL 73,744.000 $3.350 $3.450 $3.600
D-GR HMA TY-D PG70-28
TON 10,139.000 $80.000 $150.000 $150.000
D-GR HMA TY-B PG70-28
TON 4,981.000 $90.000 $135.000 $131.000
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 48,846.000 $115.000 $142.000 $149.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 74,127.000 $31.150 $43.500 $61.350
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 83,785.000 $1.250 $2.050 $2.650
RAIL (HANDRAIL)(TY B)
LF 20.000 $93.150 $280.000 $245.000
CLEAN EXIST CULVERTS
EA 24.000 $1,421.660 $2,800.000 $1,400.000
MOBILIZATION
LS 1.000 $1,213,000.000 $1,500,000.000 $1,853,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $7,500.000 $26,500.000 $20,350.000
SANDBAGS FOR EROSION CONTROL
EA 255.000 $7.500 $11.000 $18.800
TEMP SEDMT CONT FENCE (INSTALL)
LF 143.000 $2.340 $11.000 $9.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 143.000 $0.640 $4.500 $4.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 10.000 $10.000 $17.000 $24.700
CONC CURB & GUTTER (TY II)
LF 1,094.000 $18.000 $45.000 $31.600
INTERSECTIONS (CONC)
SY 210.000 $92.400 $125.000 $123.250
DRIVEWAYS (CONC)
SY 3,043.000 $70.000 $105.000 $84.600
CONC SIDEWALKS (6")
SY 4,523.000 $60.000 $92.000 $65.600
CURB RAMPS (TY 10)
SY 65.000 $122.370 $175.000 $122.250
RUMBLE STRIPS (SHOULDER)
LF 121,966.000 $0.150 $0.220 $0.140
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 9.000 $259.720 $315.000 $340.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 8.000 $385.500 $485.000 $448.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 27.000 $175.320 $215.000 $265.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 109.000 $540.000 $530.000 $895.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 28.000 $540.000 $835.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $587.000 $780.000 $975.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $646.000 $690.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $440.000 $1,200.000 $1,130.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 2.000 $1,070.000 $2,100.000 $1,790.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $511.000 $560.000 $790.000
REMOVE SM RD SN SUP&AM
EA 83.000 $80.000 $135.000 $105.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 24.000 $92.000 $135.000 $142.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 20.000 $90.000 $135.000 $142.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 28,940.000 $0.190 $0.280 $0.260
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 61,042.000 $0.180 $0.280 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 13,680.000 $0.210 $0.280 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 115,552.000 $0.190 $0.280 $0.260
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,694.000 $0.980 $1.100 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,934.000 $0.750 $1.100 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 14,180.000 $0.220 $0.910 $0.850
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 244.000 $36.630 $17.000 $15.800
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 61,042.000 $0.480 $0.460 $0.430
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 19,820.000 $0.440 $0.680 $0.640
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,560.000 $0.280 $0.460 $0.430
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 79,212.000 $0.280 $0.460 $0.430
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 160.000 $11.950 $33.500 $31.600
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 320.000 $32.870 $67.000 $63.250
REFL PAV MRKR TY I-A
EA 120.000 $2.540 $4.500 $4.200
REFL PAV MRKR TY I-C
EA 994.000 $3.100 $4.500 $4.200
REFL PAV MRKR TY II-A-A
EA 456.000 $2.790 $4.500 $4.200
REFL PAV MRKR TY II-C-R
EA 1,790.000 $3.250 $4.500 $4.200
FULL - WIDTH MOWING
CYC 2.000 $3,671.240 $5,600.000 $5,000.000
LITTER REMOVAL
CYC 2.000 $2,000.000 $3,900.000 $4,200.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 3.000 $1,992.920 $1,700.000 $3,225.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 247,719.000 $5.440 $6.050 $5.750
ASPH FOR REINF FAB (AC-20-5TR)
GAL 49,544.000 $3.540 $3.800 $4.650
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,329.000 $8,400.000 $24,500.000
TMA (STATIONARY)
DAY 360.000 $200.000 $270.000 $700.000
TMA (MOBILE OPERATION)
DAY 85.000 $181.000 $1,000.000 $700.000
Totals: $14,105,188.610 $18,510,115.030 $20,525,499.200