GUADALUPE FM2438 (6493-96-001)

Items: 23

County: GUADALUPE
Length: 0.0100 MILES
Highway: FM2438
District: SAN ANTONIO
Control Number: 6493-96-001
DBE Goal: 0.0%
Project: BPM - A00218464
Guaranty: $1,000.00
Time: 22 WORKING DAYS
Engineer's Estimate: $48,907.70
Date: 03/18/2026 (2 months ago) Changed
Contract Number: 3261502
Type: EROSION REPAIR
Project ID: A00218464
Project Description: EROSION REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4615 NW LOOP 410, SAN ANTONIO, TX 78229
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$48,907.70
$48,346.00
Over/Under Est: -1.15% -$561.70
Over/Under Est: 30.69% $15,007.80
Amt Left: 32.2% $15,569.50
Over/Under Est: 44.16% $21,595.30
Amt Left: 45.83% $22,157.00
Delta: -10.31% -$6,587.50
Over/Under Est: 52.01% $25,438.30
Amt Left: 53.78% $26,000.00
Delta: -5.45% -$3,843.00
Over/Under Est: 103.77% $50,749.30
Amt Left: 106.13% $51,311.00
Delta: -34.04% -$25,311.00
Over/Under Est: 170.87% $83,569.00
Amt Left: 174.02% $84,130.70
Delta: -32.93% -$32,819.70
Over/Under Est: 218.88% $107,049.30
Amt Left: 222.59% $107,611.00
Delta: -17.72% -$23,480.30

Bid Items & Bid Tabulations

23 Total 0 of 23
GUADALUPE  |  FM2438  |  SAN ANTONIO  |  6493-96-001  |  03/18/2026  |  $48,907.70  |  BPM - A00218464  |  EROSION REPAIR  |  22 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
AAD CONTRACTING INC.
DIAMOND R CONTRACTING, LLC
TEXAS ROAD CONSTRUCTION, LLC
GARRET SHIELDS INFRASTRUCTURE
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
SHALOM SERVICES CORPORATION
REMOV CONC (RIPRAP)
SY 8.000 $38.770 $200.000 $20.000 $500.000 $100.000 $50.000 $114.260 $98.000
REMOV CONC (MISC)
SY 4.000 $100.000 $200.000 $25.000 $500.000 $100.000 $50.000 $254.970 $100.000
EXCAV (CHANNEL)
CY 8.000 $164.570 $100.000 $19.000 $500.000 $125.000 $50.000 $137.140 $91.000
EMBANK (FNL)(OC)(TY B)
CY 28.000 $48.450 $1.000 $55.000 $2.000 $65.000 $50.000 $78.840 $99.000
COMPOST MANUF TOPSOIL (4")
SY 250.000 $1.000 $1.000 $7.000 $2.000 $4.000 $5.000 $27.040 $12.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 250.000 $1.000 $2.000 $1.500 $1.000 $5.000 $2.500 $1.800 $4.700
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 250.000 $2.860 $5.000 $2.500 $1.000 $5.000 $1.000 $15.690 $7.800
FLOWABLE BACKFILL
CY 15.000 $56.880 $250.000 $250.000 $200.000 $300.000 $300.000 $313.220 $880.000
CONC STR REPAIR (EPOXY MORTAR)
SF 14.000 $69.320 $100.000 $95.000 $200.000 $100.000 $150.000 $188.190 $519.000
RIPRAP (CONC)(5 IN)
CY 49.000 $470.910 $500.000 $195.000 $500.000 $1,000.000 $700.000 $607.570 $1,000.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 1.000 $358.720 $500.000 $180.000 $1,000.000 $200.000 $300.000 $1,393.980 $345.000
MOBILIZATION
LS 1.000 $4,600.000 $3,000.000 $10,000.000 $1.000 $7,000.000 $10,000.000 $26,446.190 $10,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $1,438.000 $1.000 $7,000.000 $2,500.000 $500.000 $10,000.000 $1,699.300 $6,000.000
TMA (STATIONARY)
DAY 22.000 $50.000 $1.000 $150.000 $1.000 $1.000 $300.000 $174.640 $350.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $1.710 $1.000 $6.000 $1.000 $1.000 $10.000 $33.170 $64.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000 $10.710 $22.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 50.000 $1.280 $1.000 $1.990 $10.000 $1.000 $5.000 $16.870 $14.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 50.000 $1.280 $1.000 $0.100 $10.000 $1.000 $1.000 $7.180 $5.500
DRIFTWOOD REMOVAL
LS 1.000 $3,500.250 $2,000.000 $5,000.000 $5,000.000 $1,000.000 $2,000.000 $5,518.770 $14,000.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.200 $20,000.000 $12,000.000 $10,000.000 $25,000.000 $1,000.000 $10,000.000 $27,589.150 $12,000.000
STUMP REMOVAL
EA 5.000 $35.020 $120.000 $300.000 $1,000.000 $100.000 $500.000 $1,537.500 $381.000
TREE REMOVAL (4" - 12" DIA)
EA 3.000 $300.000 $240.000 $100.000 $1,000.000 $300.000 $500.000 $1,839.280 $375.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 78.000 $18.840 $50.000 $95.000 $50.000 $10.000 $100.000 $173.870 $200.000
Totals: $48,907.700 $48,346.000 $63,915.500 $70,503.000 $74,346.000 $99,657.000 $132,476.700 $155,957.000