REMOV CONC (MEDIANS)
|
SY
|
30.000
|
$30.000
|
$1.000
|
$38.000
|
$30.000
|
$30.000
|
|
|
REMOV CONC (CURB)
|
LF
|
30.000
|
$20.000
|
$1.000
|
$38.000
|
$25.000
|
$5.000
|
|
|
REMOV CONC (FOUNDATIONS)
|
CY
|
5.000
|
$275.000
|
$1.000
|
$80.000
|
$1,000.000
|
$500.000
|
|
|
REMOV CONC (MISC)
|
SY
|
75.000
|
$60.000
|
$39.000
|
$25.000
|
$65.000
|
$25.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
100.000
|
$260.000
|
$19.000
|
$125.000
|
$150.000
|
$100.000
|
|
|
CLASS K CONCRETE (MISC)
|
CY
|
30.000
|
$125.000
|
$1.000
|
$600.000
|
$180.000
|
$100.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
30.000
|
$200.000
|
$279.000
|
$100.000
|
$200.000
|
$250.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
10.000
|
$425.000
|
$14.000
|
$550.000
|
$450.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
15.000
|
$550.000
|
$39.000
|
$550.000
|
$500.000
|
$800.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
100.000
|
$1,500.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
15.000
|
$500.000
|
$725.000
|
$800.000
|
$1,000.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
25.000
|
$105.000
|
$1.000
|
$500.000
|
$200.000
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
600.000
|
$150.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
1,000.000
|
$75.000
|
$114.000
|
$130.000
|
$1.000
|
$100.000
|
|
|
CONC CURB (TY II)
|
LF
|
15.000
|
$50.000
|
$1.000
|
$60.000
|
$50.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,000.000
|
$30.000
|
$1.000
|
$15.000
|
$24.000
|
$38.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
20.000
|
$30.000
|
$1.000
|
$39.000
|
$35.000
|
$60.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
50.000
|
$50.000
|
$1.000
|
$50.000
|
$150.000
|
$120.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
8.000
|
$1,500.000
|
$690.000
|
$850.000
|
$1,000.000
|
$2,200.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$600.000
|
$1.000
|
$500.000
|
$1,000.000
|
$1.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
2.000
|
$550.000
|
$1.000
|
$500.000
|
$1,000.000
|
$1.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,500.000
|
$9.000
|
$1.000
|
$5.000
|
$20.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$550.000
|
$1.000
|
$4,500.000
|
$1,250.000
|
$125.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$350.000
|
$1.000
|
$4,500.000
|
$800.000
|
$125.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,150.000
|
$1.000
|
$2,500.000
|
$3,000.000
|
$5,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$625.000
|
$1.000
|
$550.000
|
$1,250.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
75.000
|
$18.000
|
$9.000
|
$22.000
|
$40.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
75.000
|
$16.000
|
$9.000
|
$25.000
|
$40.000
|
$40.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$35.000
|
$1.000
|
$20.000
|
$10.000
|
$1.000
|
|
|
POTHOLE REPAIR(STANDARD)(0"-5" DEEP)
|
SY
|
70.000
|
$200.000
|
$294.000
|
$250.000
|
$150.000
|
$120.000
|
|
|
POTHOLE REPAIR(STANDARD)(5"-10" DEEP)
|
SY
|
50.000
|
$225.000
|
$1.000
|
$250.000
|
$120.000
|
$200.000
|
|
|
EMERGENCY MOBILIZATION
|
EA
|
15.000
|
$100.000
|
$1.000
|
$1,000.000
|
$1.000
|
$1,000.000
|
|
|
STRIP MOWING
|
AC
|
1,377.000
|
$52.000
|
$54.000
|
$58.000
|
$40.000
|
$75.000
|
|
|
SPOT MOWING
|
AC
|
100.000
|
$65.000
|
$1.000
|
$58.000
|
$60.000
|
$70.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
816.000
|
$57.000
|
$54.000
|
$50.000
|
$40.000
|
$75.000
|
|
|
LITTER REMOVAL
|
AC
|
5,055.000
|
$15.000
|
$15.000
|
$13.500
|
$20.000
|
$30.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
100.000
|
$65.000
|
$1.000
|
$13.500
|
$75.000
|
$30.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
MI
|
1,419.000
|
$150.000
|
$139.000
|
$80.000
|
$180.000
|
$200.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
MI
|
618.800
|
$125.000
|
$179.000
|
$80.000
|
$180.000
|
$200.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
100.000
|
$150.000
|
$1.000
|
$80.000
|
$180.000
|
$200.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
100.000
|
$5.000
|
$2.000
|
$80.000
|
$10.000
|
$10.000
|
|
|
SPOT TREE TRIMMING / BRUSH REMOVAL
|
LF
|
700.000
|
$30.000
|
$11.000
|
$35.000
|
$15.000
|
$18.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
40.000
|
$250.000
|
$80.000
|
$300.000
|
$150.000
|
$70.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
100.000
|
$8.000
|
$3.000
|
$85.000
|
$15.000
|
$2.500
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
100.000
|
$10.000
|
$4.000
|
$75.000
|
$18.000
|
$7.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
300.000
|
$15.000
|
$4.000
|
$35.000
|
$25.000
|
$6.000
|
|
|
REPLACE RAIL ELEMENT (W-BEAM)
|
LF
|
1,000.000
|
$25.000
|
$19.000
|
$70.000
|
$35.000
|
$50.000
|
|
|
REPLACE RAIL ELEMENT (THRIE-BEAM)
|
LF
|
5.000
|
$50.000
|
$19.000
|
$50.000
|
$300.000
|
$250.000
|
|
|
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
|
EA
|
5.000
|
$125.000
|
$200.000
|
$50.000
|
$100.000
|
$250.000
|
|
|
REPLACE TIMBER POST W/O CONC FND
|
EA
|
100.000
|
$85.000
|
$75.000
|
$250.000
|
$40.000
|
$375.000
|
|
|
REPLACE STEEL POST W/O CONC FND
|
EA
|
50.000
|
$60.000
|
$1.000
|
$50.000
|
$1.000
|
$180.000
|
|
|
REPLACE TIMBER POST W/ CONC FND
|
EA
|
25.000
|
$100.000
|
$1.000
|
$500.000
|
$1.000
|
$125.000
|
|
|
REPLACE STEEL POST W/ CONC FND
|
EA
|
25.000
|
$75.000
|
$1.000
|
$50.000
|
$1.000
|
$125.000
|
|
|
REALIGN POSTS
|
EA
|
125.000
|
$35.000
|
$5.000
|
$87.000
|
$30.000
|
$25.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
2.000
|
$38.000
|
$215.000
|
$100.000
|
$1.000
|
$1.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
2.000
|
$25.000
|
$1.000
|
$100.000
|
$1.000
|
$1.000
|
|
|
REM OBSOLETE GET & REPL W/ SGT
|
EA
|
5.000
|
$4,000.000
|
$5,000.000
|
$8,600.000
|
$4,500.000
|
$5,000.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
5.000
|
$1,100.000
|
$1,500.000
|
$4,400.000
|
$2,500.000
|
$1,600.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
500.000
|
$45.000
|
$30.000
|
$20.000
|
$25.000
|
$35.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
50.000
|
$125.000
|
$40.000
|
$50.000
|
$25.000
|
$160.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
10.000
|
$200.000
|
$200.000
|
$100.000
|
$1.000
|
$300.000
|
|
|
RESET SGT IMPACT HEAD
|
EA
|
10.000
|
$250.000
|
$50.000
|
$100.000
|
$1.000
|
$1.000
|
|
|
REPLACE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$1,100.000
|
$1,000.000
|
$6,500.000
|
$1,200.000
|
$2,600.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
25.000
|
$32.000
|
$35.000
|
$150.000
|
$75.000
|
$35.000
|
|
|
REALIGN EXISTING RAIL
|
LF
|
100.000
|
$10.000
|
$5.000
|
$10.000
|
$5.000
|
$1.000
|
|
|
REPLACE CRT POST (WOOD)
|
EA
|
75.000
|
$50.000
|
$1.000
|
$50.000
|
$20.000
|
$100.000
|
|
|
REPLACE SINGLE GDRAIL TERM POST (WOOD)
|
EA
|
10.000
|
$250.000
|
$115.000
|
$300.000
|
$250.000
|
$500.000
|
|
|
REPLACE SINGLE GDRAIL TERM POST (STEEL)
|
EA
|
20.000
|
$375.000
|
$220.000
|
$300.000
|
$250.000
|
$600.000
|
|
|
REPLACE POSTS (TL-3)(NU-CABLE)
|
EA
|
700.000
|
$85.000
|
$63.000
|
$100.000
|
$115.000
|
$150.000
|
|
|
REPLACE POSTS (TL-3)(TRINITY)
|
EA
|
1,500.000
|
$35.000
|
$98.000
|
$155.000
|
$155.000
|
$230.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
20.000
|
$110.000
|
$100.000
|
$100.000
|
$5.000
|
$1.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
5.000
|
$100.000
|
$50.000
|
$100.000
|
$250.000
|
$1.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
50.000
|
$750.000
|
$400.000
|
$850.000
|
$1,000.000
|
$1,200.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
150.000
|
$35.000
|
$6.000
|
$19.000
|
$10.000
|
$1.000
|
|
|
CHECK / RE-TENSION CABLE (TL-3)
|
EA
|
50.000
|
$500.000
|
$1.000
|
$10.000
|
$1.000
|
$1.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
100.000
|
$5.000
|
$1.000
|
$100.000
|
$10.000
|
$1.000
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
2.000
|
$165.000
|
$1.000
|
$100.000
|
$1.000
|
$1.000
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
20.000
|
$105.000
|
$30.000
|
$125.000
|
$20.000
|
$1.000
|
|
|
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
|
EA
|
2.000
|
$60.000
|
$30.000
|
$100.000
|
$50.000
|
$1.000
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
150.000
|
$15.000
|
$6.000
|
$8.000
|
$8.000
|
$1.000
|
|
|
POST AND CABLE FENCE (REPAIR)
|
LF
|
100.000
|
$42.000
|
$1.000
|
$25.000
|
$3.000
|
$1.000
|
|
|
REPLACE (INDIVIDUAL SAND BARREL)
|
EA
|
100.000
|
$175.000
|
$320.000
|
$351.000
|
$350.000
|
$1.000
|
|
|
PERM CONC TRF BARRIER REPAIR (F SHAPE)
|
LF
|
100.000
|
$360.000
|
$50.000
|
$65.000
|
$150.000
|
$100.000
|
|
|
PERM CONC TRF BARRIER REPLACE (F SHAPE)
|
LF
|
100.000
|
$100.000
|
$1.000
|
$85.000
|
$70.000
|
$100.000
|
|
|
PERM CONC TRF BARR REPAIR(SINGLE SLOPE)
|
LF
|
100.000
|
$150.000
|
$50.000
|
$65.000
|
$150.000
|
$100.000
|
|
|
PERM CONC TRF BARR REPL(SINGLE SLOPE)
|
LF
|
100.000
|
$100.000
|
$1.000
|
$55.000
|
$70.000
|
$100.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
50.000
|
$365.000
|
$50.000
|
$155.000
|
$350.000
|
$125.000
|
|
|
CONCRETE RAIL REPLACEMENT (IN-KIND)
|
LF
|
50.000
|
$150.000
|
$1.000
|
$155.000
|
$450.000
|
$125.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
40.000
|
$90.000
|
$90.000
|
$120.000
|
$90.000
|
$100.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
40.000
|
$90.000
|
$1.000
|
$75.000
|
$90.000
|
$100.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
40.000
|
$100.000
|
$90.000
|
$75.000
|
$150.000
|
$100.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
25.000
|
$200.000
|
$90.000
|
$150.000
|
$100.000
|
$100.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
25.000
|
$100.000
|
$90.000
|
$125.000
|
$75.000
|
$100.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
25.000
|
$90.000
|
$90.000
|
$124.000
|
$150.000
|
$100.000
|
|
|
INCIDENT MANAGMENT (TYPE J)
|
HR
|
25.000
|
$100.000
|
$90.000
|
$120.000
|
$75.000
|
$100.000
|
|
|
REPAIR LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
25.000
|
$1,800.000
|
$500.000
|
$900.000
|
$1,500.000
|
$2,000.000
|
|
|
RELOCATE LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
2.000
|
$100.000
|
$1.000
|
$100.000
|
$1.000
|
$400.000
|
|
|
REPLACE LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
25.000
|
$875.000
|
$900.000
|
$900.000
|
$1,500.000
|
$1,000.000
|
|
|
REMOVE LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
25.000
|
$45.000
|
$1.000
|
$50.000
|
$1.000
|
$30.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
124.000
|
$325.000
|
$200.000
|
$250.000
|
$400.000
|
$500.000
|
|
|
RELOCATE SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
25.000
|
$150.000
|
$1.000
|
$100.000
|
$150.000
|
$1.000
|
|
|
REPLACE SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
124.000
|
$400.000
|
$300.000
|
$500.000
|
$550.000
|
$700.000
|
|
|
REMOVE SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
124.000
|
$25.000
|
$1.000
|
$100.000
|
$1.000
|
$1.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
200.000
|
$95.000
|
$1.000
|
$100.000
|
$75.000
|
$80.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
200.000
|
$95.000
|
$25.000
|
$150.000
|
$75.000
|
$80.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
200.000
|
$95.000
|
$110.000
|
$100.000
|
$75.000
|
$80.000
|
|
|
SNOW AND ICE CONTROL SEASON
|
MO
|
5.000
|
$50,000.000
|
$50,000.000
|
$1.000
|
$20,000.000
|
$50,000.000
|
|
Totals: |
$2,046,067.000
|
$1,429,483.200
|
$1,741,247.500
|
$1,859,166.000
|
$2,486,211.000
|