Show Job Controls
Bid Cobra

GUADALUPE US0090 (6481-16-001)

Items: 21

County: GUADALUPE
Length: 0.0100 MILES
Highway: US0090
District: SAN ANTONIO
Control Number: 6481-16-001
DBE Goal: N/A
Project: BPM - A00214343
Guaranty: $2,000.00
Time: 13 WORKING DAYS
Engineer's Estimate: $103,346.10
Date: 08/20/2025 (9 months ago) Changed
Contract Number: 8251501
Type: EROSION REPAIR
Project ID: A00214343
Project Description: SCOUR REPAIR BY INSTALLING GABIONS, TREE AND BRUSH REMOVAL, AND CRACK SEALING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4615 NW LOOP 410, SAN ANTONIO, TX 78229
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$103,346.10
$61,036.10
Over/Under Est: -40.94% -$42,310.00
Over/Under Est: -23.67% -$24,464.10
Amt Left: 29.24% $17,845.90
Over/Under Est: -22.54% -$23,294.10
Amt Left: 31.16% $19,015.90
Delta: -1.48% -$1,170.00
Over/Under Est: -8.66% -$8,953.10
Amt Left: 54.65% $33,356.90
Delta: -17.91% -$14,341.00
Over/Under Est: -5.24% -$5,414.10
Amt Left: 60.45% $36,895.90
Delta: -3.75% -$3,539.00
Over/Under Est: 41.63% $43,019.71
Amt Left: 139.8% $85,329.71
Delta: -49.46% -$48,433.81

Bid Items & Bid Tabulations

21 Total 0 of 21
GUADALUPE  |  US0090  |  SAN ANTONIO  |  6481-16-001  |  08/20/2025  |  $103,346.10  |  BPM - A00214343  |  EROSION REPAIR  |  13 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
BECK-REIT & SONS, LTD.
DIAMOND R CONTRACTING, LLC
AUSTIN BARRICADE COMPANY, L.L.C.
GARRET SHIELDS INFRASTRUCTURE
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
REMOV CONC (RIPRAP)
CY 3.000 $230.000 $1.000 $50.000 $1,000.000 $500.000 $100.000 $3,454.540
COMPOST MANUF TOPSOIL (4")
SY 250.000 $2.500 $1.000 $2.000 $1.000 $10.000 $5.000 $20.630
BROADCAST SEED (PERM_RURAL_CLAY)
SY 250.000 $0.250 $1.000 $1.000 $1.000 $10.000 $1.000 $4.110
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 250.000 $3.000 $5.000 $2.000 $1.000 $10.000 $2.000 $11.800
FLOWABLE BACKFILL
CY 5.000 $300.000 $1.000 $400.000 $1.000 $200.000 $600.000 $634.150
CONC STR REPAIR (EPOXY MORTAR)
SF 126.000 $255.000 $70.000 $150.000 $100.000 $100.000 $200.000 $136.200
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 126.000 $200.000 $30.000 $150.000 $100.000 $100.000 $200.000 $136.200
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 1.000 $184.000 $50.000 $600.000 $1,000.000 $2,000.000 $200.000 $3,948.160
GABION MATTRESSES (GALV)(12 IN)
SY 53.000 $150.000 $160.000 $125.000 $100.000 $200.000 $200.000 $151.750
MOBILIZATION
LS 1.000 $10,000.000 $10,000.000 $12,000.000 $10,000.000 $8,000.000 $10,000.000 $27,506.150
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $8,500.000 $1.000 $2,000.000 $2,500.000 $1.000 $5,000.000 $1,720.430
TMA (STATIONARY)
DAY 13.000 $105.000 $1.000 $1.000 $1.000 $1,650.000 $300.000 $803.980
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $25.000 $1.000 $1.000 $1.000 $10.000 $5.000 $25.270
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $10.000 $1.000 $1.000 $1.000 $1.000 $1.000 $5.570
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 60.000 $5.300 $10.000 $1.000 $100.000 $20.000 $5.000 $14.550
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $0.860 $1.000 $1.000 $1.000 $1.000 $1.000 $5.320
DRIFTWOOD REMOVAL
LS 1.000 $2,000.000 $3,000.000 $8,000.000 $10,000.000 $1,000.000 $5,000.000 $10,693.830
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.100 $1,500.000 $1.000 $10,000.000 $50,000.000 $10,000.000 $10,000.000 $33,865.910
TREE REMOVAL (4" - 12" DIA)
EA 1.000 $400.000 $500.000 $600.000 $1,000.000 $3,500.000 $500.000 $3,347.110
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 50.000 $30.000 $325.000 $65.000 $100.000 $88.000 $50.000 $148.810
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 50.000 $121.000 $150.000 $65.000 $100.000 $95.000 $50.000 $163.810
Totals: $103,346.100 $61,036.100 $78,882.000 $80,052.000 $94,393.000 $97,932.000 $146,365.811