GRIMES FM 149 (0720-01-044)

Items: 116

County: GRIMES
Length: N/A
Highway: FM 149
District: BRYAN
Control Number: 0720-01-044
DBE Goal: N/A
Project: STP 2B23(029)HES
Guaranty: N/A
Time: 232 WORKING DAYS
Engineer's Estimate: $4,928,887.96
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$4,928,887.96
$5,572,269.05
Over/Under Est: 13.05% $643,381.09
Over/Under Est: 13.67% $673,845.18
Amt Left: 0.55% $30,464.09
Over/Under Est: 24.62% $1,213,249.79
Amt Left: 10.23% $569,868.70
Delta: -9.63% -$539,404.61
Over/Under Est: 38.97% $1,920,841.70
Amt Left: 22.93% $1,277,460.61
Delta: -11.52% -$707,591.91
Subcontractor Percentage Amount
HIGHWAY 1 LLC 1.86% $133,389.79
CEN TEX HYDROSEED, INC. 1.64% $117,612.50
WATERS CONSTRUCTION COMPANY, INC. 1.58% $113,309.61
DIIBS SPECIALISTS, LLC 0.86% $61,674.85
MURRAY CONSTRUCTION 0.81% $58,089.10
PROFESSIONAL TRAFFIC CONTROL LLC 0.10% $7,171.49
JB PINNACLE GROUP, LLC 0.00% $0.00
Total: 6.85% $491,247.34

Bid Items & Bid Tabulations

116 Total 0 of 116
GRIMES  |  FM 149  |  BRYAN  |  0720-01-044  |  08/03/2023  |  $4,928,887.96  |  STP 2B23(029)HES  |  WIDEN ROAD - ADD SHOULDERS  |  232 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
STA 11.000 $3,000.000 $600.000 $6,700.000 $3,500.000 $4,600.000
REMOVING CONC (RIPRAP)
SY 48.000 $20.000 $11.000 $40.000 $50.000 $34.500
REMOVING CONC (DRIVEWAYS)
SY 182.000 $18.000 $11.000 $25.000 $57.500 $19.750
EXCAVATION (ROADWAY)
CY 84.000 $11.000 $50.000 $55.000 $87.500 $64.000
SUBGRADE WIDENING (ORD COMP)
STA 299.440 $543.000 $310.000 $700.000 $800.000 $461.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 720.000 $16.000 $36.000 $45.000 $15.500 $55.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 158.000 $14.000 $36.000 $58.000 $69.000 $80.000
BACKFILL (TY A OR B)
STA 299.440 $210.000 $220.000 $150.000 $150.000 $227.000
FURNISHING AND PLACING TOPSOIL (4")
SY 48,771.000 $1.500 $2.500 $1.100 $1.000 $0.820
BLOCK SODDING
SY 294.000 $5.000 $11.000 $8.000 $10.000 $9.060
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 48,771.000 $0.160 $0.250 $0.270 $0.500 $0.310
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 48,771.000 $0.200 $0.250 $0.250 $0.500 $0.280
VEGETATIVE WATERING
MG 487.000 $15.000 $30.000 $27.000 $25.000 $50.000
PROOF ROLLING
HR 1.000 $135.000 $220.000 $250.000 $211.500 $90.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 19,851.000 $14.000 $24.000 $27.000 $25.000 $19.570
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 879.000 $17.000 $44.000 $45.000 $40.000 $27.400
LIME TRT (EXST MATL)(10")
SY 32,252.000 $7.000 $8.250 $4.800 $5.000 $4.060
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 416.000 $300.000 $370.000 $300.000 $357.000 $369.000
LIME TRT (EXIST MATL)(11")
SY 1,004.000 $4.500 $19.000 $17.000 $15.000 $12.000
PRIME COAT (MC-30)
GAL 464.000 $7.000 $7.000 $7.500 $6.500 $9.650
ASPH (RC-250)
GAL 4,963.000 $6.000 $4.750 $4.500 $6.500 $6.600
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 147.000 $280.000 $160.000 $290.000 $182.500 $409.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,132.000 $2.500 $9.500 $6.000 $6.500 $10.450
PLANE ASPH CONC PAV (3"- 5")
SY 1,422.000 $7.500 $9.250 $9.000 $9.500 $11.420
CEM STABIL BKFL
CY 258.000 $100.000 $110.000 $178.000 $325.000 $226.400
CUT & RESTORING PAV
SY 149.000 $110.000 $120.000 $140.000 $72.000 $283.000
FLOWABLE BACKFILL
CY 10.000 $250.000 $670.000 $400.000 $438.500 $276.000
TRENCH EXCAVATION PROTECTION
LF 199.000 $4.000 $0.500 $16.000 $6.500 $28.300
CL C CONC (HEADWALL)
CY 3.600 $976.000 $1,600.000 $1,700.000 $3,600.000 $3,396.000
RETAINING WALL (SPREAD FOOTING)
SF 2,100.000 $95.000 $75.000 $100.000 $120.000 $157.000
RIPRAP (CONC)(4 IN)
CY 23.000 $500.000 $500.000 $730.000 $780.000 $1,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 125.000 $140.000 $200.000 $200.000 $126.000 $198.000
RIPRAP (MOW STRIP)(4 IN)
CY 106.500 $600.000 $470.000 $740.000 $780.000 $1,061.000
RETROFIT RAIL (TY SSTR)
LF 350.000 $200.000 $290.000 $160.000 $258.000 $122.800
CONC BOX CULV (5 FT X 3 FT)
LF 48.000 $400.000 $590.000 $700.000 $1,495.000 $1,132.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 7.000 $700.000 $600.000 $1,000.000 $1,950.000 $962.000
RC PIPE (CL III)(18 IN)
LF 1,556.000 $95.000 $70.000 $90.000 $130.000 $73.590
RC PIPE (CL III)(24 IN)
LF 698.000 $110.000 $83.000 $140.000 $156.000 $181.000
RC PIPE (CL III)(30 IN)
LF 32.000 $180.000 $130.000 $148.000 $214.500 $255.000
RC PIPE (CL III)(36 IN)
LF 192.000 $200.000 $160.000 $225.000 $468.000 $322.000
RC PIPE (CL IV)(24 IN)
LF 172.000 $140.000 $100.000 $162.000 $175.500 $226.000
INLET (COMPL)(TY S)
EA 1.000 $7,000.000 $3,400.000 $6,200.000 $7,254.000 $10,190.000
INLET (COMPL)(PSL)(FG)(4FTX5FT-4FTX4FT)
EA 1.000 $8,632.000 $7,100.000 $5,200.000 $8,671.000 $7,360.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 4.000 $10,000.000 $8,500.000 $9,000.000 $16,120.000 $16,980.000
HEADWALL (CH - PW - S) (DIA= 60 IN)
EA 2.000 $18,000.000 $12,000.000 $25,000.000 $38,740.000 $28,300.000
HEADWALL (CH - PW - S) (DIA= 66 IN)
EA 2.000 $24,000.000 $14,000.000 $25,000.000 $38,740.000 $31,700.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $10,000.000 $6,500.000 $16,000.000 $14,885.000 $16,900.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $9,600.000 $7,500.000 $17,000.000 $15,405.000 $19,245.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 90.000 $1,200.000 $1,700.000 $1,700.000 $1,625.000 $1,130.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 14.000 $1,400.000 $1,600.000 $1,900.000 $2,245.100 $1,698.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 32.000 $1,750.000 $1,900.000 $1,900.000 $2,405.000 $2,264.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,550.000 $3,300.000 $2,700.000 $3,607.500 $3,396.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $3,600.000 $4,400.000 $5,100.000 $7,182.500 $3,962.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $4,300.000 $4,600.000 $5,300.000 $7,182.500 $4,528.000
REMOV STR (INLET)
EA 1.000 $650.000 $1,100.000 $900.000 $1,950.000 $1,133.000
REMOV STR (SET)
EA 40.000 $500.000 $370.000 $250.000 $455.000 $962.000
REMOV STR (HEADWALL)
EA 3.000 $1,600.000 $1,100.000 $1,300.000 $2,600.000 $1,700.000
REMOV STR (PIPE)
EA 75.000 $450.000 $1,000.000 $500.000 $455.000 $1,698.000
MOBILIZATION
LS 1.000 $300,000.000 $380,000.000 $370,000.000 $600,000.000 $830,200.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $6,000.000 $2,500.000 $6,000.000 $5,000.000 $21,100.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,360.000 $40.000 $45.010 $34.000 $43.000 $38.490
ROCK FILTER DAMS (REMOVE)
LF 1,360.000 $11.000 $13.000 $10.000 $12.500 $11.320
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,932.000 $4.000 $4.750 $3.500 $4.500 $3.960
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,932.000 $1.000 $1.250 $1.000 $1.500 $1.100
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 562.000 $4.000 $6.000 $4.500 $5.500 $5.090
BIODEG EROSN CONT LOGS (REMOVE)
LF 562.000 $1.100 $1.250 $1.000 $1.500 $1.100
INTERSECTIONS (ACP)
SY 776.000 $52.000 $45.000 $65.000 $63.500 $51.300
DRIVEWAYS (CONC)
SY 150.000 $100.000 $120.000 $175.000 $180.000 $226.400
DRIVEWAYS (SURF TREAT)
SY 6,977.000 $40.000 $40.000 $45.000 $38.000 $61.000
TURNOUTS (SURF TREAT)
SY 480.000 $50.000 $35.000 $87.000 $44.000 $118.000
RUMBLE STRIPS (SHOULDER)
LF 1,280.000 $0.200 $3.500 $3.000 $3.500 $2.210
MTL W-BEAM GD FEN (TIM POST)
LF 1,225.000 $25.000 $32.000 $22.000 $29.000 $24.340
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,320.000 $2,500.000 $2,400.000 $2,142.000 $2,781.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $2.600 $3.250 $2.000 $5.000 $2.260
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,205.000 $4,000.000 $2,900.000 $3,465.000 $3,283.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 4.000 $825.000 $2,000.000 $1,600.000 $1,890.000 $1,812.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 29.000 $250.000 $340.000 $290.000 $644.000 $328.000
MAILBOX INSTALL-D (TWG-POST) TY 4
EA 5.000 $300.000 $370.000 $350.000 $648.000 $400.000
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 3.000 $650.000 $560.000 $650.000 $955.000 $736.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 63.000 $680.000 $660.000 $430.000 $793.000 $481.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $750.000 $860.000 $550.000 $978.000 $617.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $960.000 $670.000 $1,121.000 $753.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $800.000 $1,100.000 $680.000 $1,028.000 $764.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,000.000 $1,200.000 $800.000 $1,267.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,100.000 $1,200.000 $770.000 $1,274.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,100.000 $130.000 $1,100.000 $1,872.000 $1,230.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $390.000 $66.000 $160.000 $112.000 $200.000
REMOVE SM RD SN SUP&AM
EA 71.000 $110.000 $99.000 $100.000 $169.000 $108.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $23.000 $33.000 $25.000 $38.000 $29.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $32.000 $37.000 $35.000 $44.000 $40.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 28.000 $120.000 $110.000 $115.000 $154.000 $130.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 3,967.000 $0.350 $0.250 $0.280 $0.350 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 25,372.000 $0.350 $0.250 $0.280 $0.350 $0.320
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 30.000 $1.100 $1.250 $1.500 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 714.000 $0.750 $1.250 $1.500 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 15.000 $1.000 $1.250 $3.000 $1.500 $2.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 219.000 $1.500 $2.750 $2.000 $2.600 $2.260
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 300.000 $1.000 $2.750 $2.000 $2.600 $2.260
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 133.000 $9.000 $13.000 $10.000 $13.000 $11.320
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 57,106.000 $0.800 $1.250 $1.000 $1.100 $1.080
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 25,372.000 $0.750 $1.250 $1.000 $1.100 $1.080
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
LF 3,967.000 $0.750 $1.250 $1.000 $1.100 $1.080
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,244.000 $0.700 $1.250 $0.900 $1.100 $1.020
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 144.000 $0.700 $1.250 $0.900 $1.100 $1.020
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $530.000 $630.000 $480.000 $620.000 $541.000
REFL PAV MRKR TY II-A-A
EA 698.000 $4.500 $8.500 $6.500 $8.000 $7.360
REFL PAV MRKR TY II-C-R
EA 15.000 $4.900 $8.500 $6.500 $8.000 $7.360
SP MIXES SP-C SAC-A PG64-22
TON 10,502.000 $130.000 $150.000 $130.000 $126.000 $134.700
SP MIXES SP-C SAC-A PG76-22
TON 359.000 $121.000 $180.000 $185.000 $145.000 $159.000
SP MIXES SP-D SAC-B PG76-22
TON 196.000 $121.000 $260.000 $224.000 $142.000 $170.000
PFC-C PG76-22 SAC-A
TON 126.000 $167.730 $300.000 $315.000 $207.000 $261.000
BONDING COURSE
GAL 9,996.000 $4.500 $6.250 $4.400 $6.000 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $7,900.000 $6,000.000 $6,300.000 $16,600.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 150.000 $4.000 $30.000 $23.000 $25.000 $25.760
TMA (STATIONARY)
DAY 235.000 $212.000 $200.000 $200.000 $166.500 $595.000
TMA (MOBILE OPERATION)
DAY 3.000 $306.000 $390.000 $400.000 $1,000.000 $900.000
Totals: $4,928,887.960 $5,572,269.050 $5,602,733.140 $6,142,137.750 $6,849,729.660