PREPARING ROW
|
STA
|
11.000
|
$3,000.000
|
$600.000
|
$6,700.000
|
$3,500.000
|
$4,600.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
48.000
|
$20.000
|
$11.000
|
$40.000
|
$50.000
|
$34.500
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
182.000
|
$18.000
|
$11.000
|
$25.000
|
$57.500
|
$19.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
84.000
|
$11.000
|
$50.000
|
$55.000
|
$87.500
|
$64.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
299.440
|
$543.000
|
$310.000
|
$700.000
|
$800.000
|
$461.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
720.000
|
$16.000
|
$36.000
|
$45.000
|
$15.500
|
$55.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
158.000
|
$14.000
|
$36.000
|
$58.000
|
$69.000
|
$80.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
299.440
|
$210.000
|
$220.000
|
$150.000
|
$150.000
|
$227.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
48,771.000
|
$1.500
|
$2.500
|
$1.100
|
$1.000
|
$0.820
|
|
|
BLOCK SODDING
|
SY
|
294.000
|
$5.000
|
$11.000
|
$8.000
|
$10.000
|
$9.060
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
48,771.000
|
$0.160
|
$0.250
|
$0.270
|
$0.500
|
$0.310
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
48,771.000
|
$0.200
|
$0.250
|
$0.250
|
$0.500
|
$0.280
|
|
|
VEGETATIVE WATERING
|
MG
|
487.000
|
$15.000
|
$30.000
|
$27.000
|
$25.000
|
$50.000
|
|
|
PROOF ROLLING
|
HR
|
1.000
|
$135.000
|
$220.000
|
$250.000
|
$211.500
|
$90.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
19,851.000
|
$14.000
|
$24.000
|
$27.000
|
$25.000
|
$19.570
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
879.000
|
$17.000
|
$44.000
|
$45.000
|
$40.000
|
$27.400
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
32,252.000
|
$7.000
|
$8.250
|
$4.800
|
$5.000
|
$4.060
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
416.000
|
$300.000
|
$370.000
|
$300.000
|
$357.000
|
$369.000
|
|
|
LIME TRT (EXIST MATL)(11")
|
SY
|
1,004.000
|
$4.500
|
$19.000
|
$17.000
|
$15.000
|
$12.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
464.000
|
$7.000
|
$7.000
|
$7.500
|
$6.500
|
$9.650
|
|
|
ASPH (RC-250)
|
GAL
|
4,963.000
|
$6.000
|
$4.750
|
$4.500
|
$6.500
|
$6.600
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
147.000
|
$280.000
|
$160.000
|
$290.000
|
$182.500
|
$409.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,132.000
|
$2.500
|
$9.500
|
$6.000
|
$6.500
|
$10.450
|
|
|
PLANE ASPH CONC PAV (3"- 5")
|
SY
|
1,422.000
|
$7.500
|
$9.250
|
$9.000
|
$9.500
|
$11.420
|
|
|
CEM STABIL BKFL
|
CY
|
258.000
|
$100.000
|
$110.000
|
$178.000
|
$325.000
|
$226.400
|
|
|
CUT & RESTORING PAV
|
SY
|
149.000
|
$110.000
|
$120.000
|
$140.000
|
$72.000
|
$283.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
10.000
|
$250.000
|
$670.000
|
$400.000
|
$438.500
|
$276.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
199.000
|
$4.000
|
$0.500
|
$16.000
|
$6.500
|
$28.300
|
|
|
CL C CONC (HEADWALL)
|
CY
|
3.600
|
$976.000
|
$1,600.000
|
$1,700.000
|
$3,600.000
|
$3,396.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
2,100.000
|
$95.000
|
$75.000
|
$100.000
|
$120.000
|
$157.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
23.000
|
$500.000
|
$500.000
|
$730.000
|
$780.000
|
$1,000.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
125.000
|
$140.000
|
$200.000
|
$200.000
|
$126.000
|
$198.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
106.500
|
$600.000
|
$470.000
|
$740.000
|
$780.000
|
$1,061.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
350.000
|
$200.000
|
$290.000
|
$160.000
|
$258.000
|
$122.800
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
48.000
|
$400.000
|
$590.000
|
$700.000
|
$1,495.000
|
$1,132.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
7.000
|
$700.000
|
$600.000
|
$1,000.000
|
$1,950.000
|
$962.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,556.000
|
$95.000
|
$70.000
|
$90.000
|
$130.000
|
$73.590
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
698.000
|
$110.000
|
$83.000
|
$140.000
|
$156.000
|
$181.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
32.000
|
$180.000
|
$130.000
|
$148.000
|
$214.500
|
$255.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
192.000
|
$200.000
|
$160.000
|
$225.000
|
$468.000
|
$322.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
172.000
|
$140.000
|
$100.000
|
$162.000
|
$175.500
|
$226.000
|
|
|
INLET (COMPL)(TY S)
|
EA
|
1.000
|
$7,000.000
|
$3,400.000
|
$6,200.000
|
$7,254.000
|
$10,190.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$8,632.000
|
$7,100.000
|
$5,200.000
|
$8,671.000
|
$7,360.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
4.000
|
$10,000.000
|
$8,500.000
|
$9,000.000
|
$16,120.000
|
$16,980.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
2.000
|
$18,000.000
|
$12,000.000
|
$25,000.000
|
$38,740.000
|
$28,300.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 66 IN)
|
EA
|
2.000
|
$24,000.000
|
$14,000.000
|
$25,000.000
|
$38,740.000
|
$31,700.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$6,500.000
|
$16,000.000
|
$14,885.000
|
$16,900.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$9,600.000
|
$7,500.000
|
$17,000.000
|
$15,405.000
|
$19,245.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
90.000
|
$1,200.000
|
$1,700.000
|
$1,700.000
|
$1,625.000
|
$1,130.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
14.000
|
$1,400.000
|
$1,600.000
|
$1,900.000
|
$2,245.100
|
$1,698.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,750.000
|
$1,900.000
|
$1,900.000
|
$2,405.000
|
$2,264.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,550.000
|
$3,300.000
|
$2,700.000
|
$3,607.500
|
$3,396.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,600.000
|
$4,400.000
|
$5,100.000
|
$7,182.500
|
$3,962.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,300.000
|
$4,600.000
|
$5,300.000
|
$7,182.500
|
$4,528.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$650.000
|
$1,100.000
|
$900.000
|
$1,950.000
|
$1,133.000
|
|
|
REMOV STR (SET)
|
EA
|
40.000
|
$500.000
|
$370.000
|
$250.000
|
$455.000
|
$962.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
3.000
|
$1,600.000
|
$1,100.000
|
$1,300.000
|
$2,600.000
|
$1,700.000
|
|
|
REMOV STR (PIPE)
|
EA
|
75.000
|
$450.000
|
$1,000.000
|
$500.000
|
$455.000
|
$1,698.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$300,000.000
|
$380,000.000
|
$370,000.000
|
$600,000.000
|
$830,200.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$6,000.000
|
$2,500.000
|
$6,000.000
|
$5,000.000
|
$21,100.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,360.000
|
$40.000
|
$45.010
|
$34.000
|
$43.000
|
$38.490
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,360.000
|
$11.000
|
$13.000
|
$10.000
|
$12.500
|
$11.320
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,932.000
|
$4.000
|
$4.750
|
$3.500
|
$4.500
|
$3.960
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,932.000
|
$1.000
|
$1.250
|
$1.000
|
$1.500
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
562.000
|
$4.000
|
$6.000
|
$4.500
|
$5.500
|
$5.090
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
562.000
|
$1.100
|
$1.250
|
$1.000
|
$1.500
|
$1.100
|
|
|
INTERSECTIONS (ACP)
|
SY
|
776.000
|
$52.000
|
$45.000
|
$65.000
|
$63.500
|
$51.300
|
|
|
DRIVEWAYS (CONC)
|
SY
|
150.000
|
$100.000
|
$120.000
|
$175.000
|
$180.000
|
$226.400
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
6,977.000
|
$40.000
|
$40.000
|
$45.000
|
$38.000
|
$61.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
480.000
|
$50.000
|
$35.000
|
$87.000
|
$44.000
|
$118.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
1,280.000
|
$0.200
|
$3.500
|
$3.000
|
$3.500
|
$2.210
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,225.000
|
$25.000
|
$32.000
|
$22.000
|
$29.000
|
$24.340
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$2,320.000
|
$2,500.000
|
$2,400.000
|
$2,142.000
|
$2,781.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$2.600
|
$3.250
|
$2.000
|
$5.000
|
$2.260
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,205.000
|
$4,000.000
|
$2,900.000
|
$3,465.000
|
$3,283.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
4.000
|
$825.000
|
$2,000.000
|
$1,600.000
|
$1,890.000
|
$1,812.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
29.000
|
$250.000
|
$340.000
|
$290.000
|
$644.000
|
$328.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
5.000
|
$300.000
|
$370.000
|
$350.000
|
$648.000
|
$400.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
3.000
|
$650.000
|
$560.000
|
$650.000
|
$955.000
|
$736.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
63.000
|
$680.000
|
$660.000
|
$430.000
|
$793.000
|
$481.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$750.000
|
$860.000
|
$550.000
|
$978.000
|
$617.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$960.000
|
$670.000
|
$1,121.000
|
$753.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
6.000
|
$800.000
|
$1,100.000
|
$680.000
|
$1,028.000
|
$764.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$1,200.000
|
$800.000
|
$1,267.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,100.000
|
$1,200.000
|
$770.000
|
$1,274.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$1,100.000
|
$130.000
|
$1,100.000
|
$1,872.000
|
$1,230.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
1.000
|
$390.000
|
$66.000
|
$160.000
|
$112.000
|
$200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
71.000
|
$110.000
|
$99.000
|
$100.000
|
$169.000
|
$108.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$23.000
|
$33.000
|
$25.000
|
$38.000
|
$29.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
24.000
|
$32.000
|
$37.000
|
$35.000
|
$44.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
28.000
|
$120.000
|
$110.000
|
$115.000
|
$154.000
|
$130.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,967.000
|
$0.350
|
$0.250
|
$0.280
|
$0.350
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
25,372.000
|
$0.350
|
$0.250
|
$0.280
|
$0.350
|
$0.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
30.000
|
$1.100
|
$1.250
|
$1.500
|
$1.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
714.000
|
$0.750
|
$1.250
|
$1.500
|
$1.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
15.000
|
$1.000
|
$1.250
|
$3.000
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
219.000
|
$1.500
|
$2.750
|
$2.000
|
$2.600
|
$2.260
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
300.000
|
$1.000
|
$2.750
|
$2.000
|
$2.600
|
$2.260
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
133.000
|
$9.000
|
$13.000
|
$10.000
|
$13.000
|
$11.320
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
57,106.000
|
$0.800
|
$1.250
|
$1.000
|
$1.100
|
$1.080
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
25,372.000
|
$0.750
|
$1.250
|
$1.000
|
$1.100
|
$1.080
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
|
LF
|
3,967.000
|
$0.750
|
$1.250
|
$1.000
|
$1.100
|
$1.080
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,244.000
|
$0.700
|
$1.250
|
$0.900
|
$1.100
|
$1.020
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
144.000
|
$0.700
|
$1.250
|
$0.900
|
$1.100
|
$1.020
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$530.000
|
$630.000
|
$480.000
|
$620.000
|
$541.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
698.000
|
$4.500
|
$8.500
|
$6.500
|
$8.000
|
$7.360
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
15.000
|
$4.900
|
$8.500
|
$6.500
|
$8.000
|
$7.360
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
10,502.000
|
$130.000
|
$150.000
|
$130.000
|
$126.000
|
$134.700
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
359.000
|
$121.000
|
$180.000
|
$185.000
|
$145.000
|
$159.000
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
196.000
|
$121.000
|
$260.000
|
$224.000
|
$142.000
|
$170.000
|
|
|
PFC-C PG76-22 SAC-A
|
TON
|
126.000
|
$167.730
|
$300.000
|
$315.000
|
$207.000
|
$261.000
|
|
|
BONDING COURSE
|
GAL
|
9,996.000
|
$4.500
|
$6.250
|
$4.400
|
$6.000
|
$7.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$7,900.000
|
$6,000.000
|
$6,300.000
|
$16,600.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
150.000
|
$4.000
|
$30.000
|
$23.000
|
$25.000
|
$25.760
|
|
|
TMA (STATIONARY)
|
DAY
|
235.000
|
$212.000
|
$200.000
|
$200.000
|
$166.500
|
$595.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$306.000
|
$390.000
|
$400.000
|
$1,000.000
|
$900.000
|
|
Totals: |
$4,928,887.960
|
$5,572,269.050
|
$5,602,733.140
|
$6,142,137.750
|
$6,849,729.660
|