GRIMES SH 105 (0338-01-068)

Items: 105

County: GRIMES
Length: N/A
Highway: SH 105
District: BRYAN
Control Number: 0338-01-068
DBE Goal: 650.0%
Project: STP 2B24(245)HES
Guaranty: N/A
Time: 293 WORKING DAYS
Engineer's Estimate: $13,115,067.96
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS W/ RT AND/OR LT TRN LANE
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$13,115,067.96
$10,784,375.49
Over/Under Est: -17.77% -$2,330,692.47
Over/Under Est: -12.71% -$1,667,545.82
Amt Left: 6.15% $663,146.65
Over/Under Est: -8.97% -$1,176,577.11
Amt Left: 10.7% $1,154,115.36
Delta: -4.29% -$490,968.71
Over/Under Est: -8.63% -$1,131,419.20
Amt Left: 11.12% $1,199,273.27
Delta: -0.38% -$45,157.91
$12,016,752.02
Over/Under Est: -8.37% -$1,098,315.94
Amt Left: 11.43% $1,232,376.53
Delta: -0.28% -$33,103.26
Over/Under Est: 5.85% $766,704.07
Amt Left: 28.72% $3,097,396.54
Delta: -15.52% -$1,865,020.01
Subcontractor Percentage Amount
D. I. J. CONSTRUCTION, INC. 3.16% $340,786.27
CEN TEX HYDROSEED, INC. 1.91% $205,981.57
A BROTHERS MILLING, LLC 1.77% $190,883.45
CEN-TREE SOLUTIONS LLC 1.29% $139,118.44
BUYERS BARRICADES HOUSTON, LLC 0.87% $93,824.07
MURRAY CONSTRUCTION 0.65% $70,098.44
DIIBS SPECIALISTS, LLC 0.41% $44,215.94
PROFESSIONAL TRAFFIC CONTROL LLC 0.08% $8,627.50
Total: 10.14% $1,093,535.68

Bid Items & Bid Tabulations

105 Total 0 of 105
GRIMES  |  SH 105  |  BRYAN  |  0338-01-068  |  06/05/2024  |  $13,115,067.96  |  STP 2B24(245)HES  |  INTERS IMPRVS W/ RT AND/OR LT TRN LA...  |  293 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
LARRY YOUNG PAVING, INC.
BIG CREEK CONSTRUCTION, LTD.
BRAZOS PAVING, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
PREPARING ROW
STA 261.000 $1,500.000 $575.000 $600.000 $690.000 $1,000.000 $1,216.780 $815.910
REMOVING CONC (DRIVEWAYS)
SY 387.000 $21.000 $13.500 $13.000 $22.000 $35.000 $31.500 $49.390
REMOVING STAB BASE & ASPH PAV (0-6")
SY 7,257.000 $5.000 $5.400 $16.000 $7.000 $8.000 $7.500 $14.840
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 21,751.000 $12.660 $17.500 $13.000 $17.000 $12.000 $13.400 $5.570
EXCAVATION (ROADWAY)
CY 25,029.000 $18.000 $5.000 $15.000 $20.000 $17.000 $15.200 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 12,892.000 $22.000 $5.000 $15.000 $14.000 $17.000 $9.800 $19.930
FURNISHING AND PLACING TOPSOIL (4")
SY 107,464.000 $1.500 $0.550 $1.000 $2.000 $1.250 $1.100 $5.920
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 107,464.000 $0.500 $0.480 $0.480 $0.500 $0.500 $0.600 $0.570
CELL FBR MLCH SEED(TEMP)(WARM)
SY 53,741.000 $0.500 $0.460 $0.460 $0.500 $0.480 $0.580 $0.540
CELL FBR MLCH SEED(TEMP)(COOL)
SY 53,741.000 $0.400 $0.460 $0.460 $0.500 $0.480 $0.580 $0.540
VEGETATIVE WATERING
MG 1,074.700 $15.000 $37.000 $13.000 $53.000 $15.000 $14.000 $137.820
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 63,966.000 $25.710 $25.500 $32.000 $31.000 $28.000 $30.100 $42.120
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 226.000 $335.000 $337.000 $338.000 $430.000 $375.000 $420.000 $442.340
LIME TRT (EXST MATL)(8")
SY 22,754.000 $7.000 $3.600 $2.400 $3.750 $3.500 $6.600 $3.510
CEMENT
TON 676.000 $270.000 $248.000 $230.000 $270.000 $275.000 $285.000 $249.560
CEMENT TREAT (SUBGRADE) (8")
SY 68,269.000 $4.460 $1.300 $2.100 $2.500 $3.500 $4.100 $2.680
PRIME COAT (MC-30 OR EC-30)
GAL 15,992.000 $6.810 $5.250 $6.800 $6.000 $5.000 $5.100 $7.050
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 365.000 $55.000 $136.000 $95.000 $82.000 $80.000 $36.800 $125.840
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
SY 1,085.000 $180.000 $245.000 $200.000 $110.000 $160.000 $91.250 $173.800
PLANE ASPH CONC PAV(0" TO 2")
SY 3,410.000 $2.500 $5.100 $4.400 $3.000 $5.000 $3.100 $6.440
PLANE ASPH CONC PAV (2")
SY 114,029.000 $2.500 $2.200 $2.000 $1.750 $2.500 $3.300 $2.370
PLANE ASPH CONC PAV (5")
SY 4,879.000 $4.080 $6.150 $3.000 $6.500 $9.000 $9.400 $15.490
RIPRAP (MOW STRIP)(4 IN)
CY 53.000 $575.000 $1,250.000 $950.000 $620.000 $850.000 $728.000 $1,124.180
CONC BOX CULV (3 FT X 2 FT)
LF 3.000 $420.000 $4,900.000 $2,000.000 $1,800.000 $2,000.000 $3,360.000 $2,366.680
RC PIPE (CL III)(18 IN)
LF 1,686.000 $80.000 $65.000 $70.000 $70.000 $115.000 $101.100 $80.460
RC PIPE (CL III)(24 IN)
LF 124.000 $125.000 $85.000 $170.000 $91.000 $135.000 $128.000 $189.330
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $5,900.000 $5,500.000 $6,700.000 $8,100.000 $7,000.000 $6,020.000 $7,691.710
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 109.000 $1,300.000 $1,500.000 $1,000.000 $1,200.000 $1,500.000 $2,270.000 $1,183.340
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $2,300.000 $2,200.000 $2,500.000 $1,800.000 $1,850.000 $2,950.000 $2,958.350
REMOV STR (INLET)
EA 1.000 $1,200.000 $750.000 $1,200.000 $1,000.000 $2,500.000 $793.000 $1,420.000
REMOV STR (SET)
EA 24.000 $600.000 $400.000 $1,000.000 $360.000 $500.000 $495.500 $1,183.340
REMOV STR (PIPE)
LF 1,538.000 $35.000 $35.000 $40.000 $23.000 $17.000 $39.170 $47.330
REMOV STR (BOX CULVERT)
LF 3.000 $75.000 $1,500.000 $500.000 $430.000 $600.000 $1,244.300 $591.670
MOBILIZATION
LS 1.000 $1,179,000.000 $721,000.000 $670,000.000 $1,095,000.000 $1,100,000.000 $398,455.000 $190,710.470
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $9,000.000 $21,000.000 $10,500.000 $5,600.000 $5,000.000 $5,040.000 $15,999.500
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 990.000 $40.000 $36.000 $36.000 $46.000 $37.000 $45.000 $42.600
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 105.000 $70.000 $70.000 $70.000 $89.000 $75.000 $87.500 $82.830
ROCK FILTER DAMS (REMOVE)
LF 1,095.000 $12.000 $10.000 $10.000 $13.000 $10.000 $12.500 $11.830
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,658.000 $4.000 $3.500 $5.000 $4.500 $4.000 $4.400 $4.140
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,658.000 $1.000 $1.000 $1.000 $1.250 $1.000 $1.250 $1.180
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 2,409.000 $8.000 $4.000 $4.000 $5.000 $5.000 $5.000 $4.730
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,409.000 $1.500 $1.000 $1.000 $1.250 $2.000 $1.250 $1.180
DRIVEWAYS (ACP)
SY 8,556.000 $65.000 $61.000 $62.000 $50.000 $52.000 $50.300 $70.310
DRIVEWAYS (CONC)(TYPE 1)
SY 431.000 $110.000 $132.000 $280.000 $130.000 $145.000 $87.900 $266.250
DRIVEWAYS (CONC)(TYPE 2)
SY 74.000 $150.000 $250.000 $460.000 $240.000 $200.000 $155.000 $473.340
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 47,600.000 $0.200 $0.120 $0.330 $0.250 $0.350 $0.180 $0.070
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 2,830.000 $0.350 $0.330 $3.500 $0.750 $3.500 $0.180 $0.390
MTL W-BEAM GD FEN (TIM POST)
LF 562.500 $30.000 $23.500 $27.000 $34.000 $35.000 $18.150 $28.400
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $2,300.000 $1,250.000 $1,500.000 $1,900.000 $1,600.000 $1,050.000 $1,325.340
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,500.000 $3,000.000 $3,000.000 $3,700.000 $3,700.000 $2,830.000 $3,425.760
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $260.000 $250.000 $310.000 $380.000 $300.000 $603.000 $384.580
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 11.000 $520.000 $425.000 $435.000 $540.000 $700.000 $532.000 $721.830
MAILBOX INSTALL-S (WC-POST) TY 3
EA 34.000 $180.000 $125.000 $130.000 $160.000 $300.000 $156.250 $213.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 6.000 $230.000 $145.000 $150.000 $190.000 $350.000 $181.300 $266.260
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 69.000 $700.000 $550.000 $570.000 $700.000 $450.000 $688.000 $698.170
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $800.000 $700.000 $720.000 $890.000 $600.000 $875.000 $923.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $1,000.000 $800.000 $820.000 $1,000.000 $750.000 $1,000.000 $1,165.590
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $900.000 $950.000 $1,000.000 $1,200.000 $2,400.000 $1,188.000 $2,159.600
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $700.000 $450.000 $480.000 $570.000 $400.000 $562.500 $846.090
REMOVE SM RD SN SUP&AM
EA 69.000 $110.000 $100.000 $100.000 $130.000 $100.000 $125.000 $118.340
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $85.000 $25.000 $26.000 $32.000 $26.000 $31.250 $27.220
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 34.000 $80.000 $30.000 $52.000 $64.000 $35.000 $37.500 $33.720
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 16.000 $150.000 $95.000 $100.000 $120.000 $175.000 $118.750 $88.760
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 1,018.000 $0.450 $0.450 $0.500 $0.500 $0.500 $0.560 $0.530
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 46,868.000 $0.450 $0.400 $0.450 $0.500 $0.450 $0.500 $0.470
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,827.000 $0.700 $1.150 $0.130 $1.500 $1.250 $1.450 $1.360
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 54,950.000 $0.450 $0.400 $0.450 $0.500 $0.450 $0.500 $0.470
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 52,329.000 $1.910 $0.250 $0.280 $0.250 $0.250 $0.310 $0.300
WK ZN PAV MRK REMOV (REFL) TY II-A-A
LF 59,892.000 $1.440 $0.250 $0.280 $0.250 $0.250 $0.310 $0.300
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 60,982.000 $1.660 $0.700 $0.780 $1.000 $0.750 $0.880 $0.830
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 69,810.000 $1.230 $0.700 $0.780 $1.000 $0.750 $0.880 $0.830
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,440.000 $1.900 $1.050 $1.180 $1.500 $1.100 $1.310 $1.240
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 350.000 $2.100 $1.800 $2.000 $2.500 $2.000 $2.250 $2.130
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,588.000 $1.800 $1.200 $1.350 $1.750 $1.250 $1.500 $1.420
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 226.000 $3.600 $13.000 $14.000 $18.000 $15.000 $62.400 $15.380
REFL PAV MRK TY II (W) 6" (BRK)
LF 70.000 $0.200 $1.100 $1.200 $1.500 $1.200 $1.380 $1.300
REFL PAV MRK TY II (W) 6" (SLD)
LF 1,569.000 $0.200 $1.050 $1.150 $1.500 $1.100 $1.310 $1.240
REFL PAV MRK TY II (W) 8" (SLD)
LF 838.000 $0.600 $2.200 $2.500 $3.000 $2.500 $2.750 $2.600
REFL PAV MRK TY II (W) 12" (SLD)
LF 27.000 $1.500 $4.200 $4.600 $5.750 $4.500 $5.250 $4.970
REFL PAV MRK TY II (W) (ARROW)
EA 2.000 $130.000 $100.000 $110.000 $140.000 $100.000 $125.000 $118.340
REFL PAV MRK TY II (W) (WORD)
EA 1.000 $140.000 $100.000 $112.000 $140.000 $100.000 $125.000 $118.340
REFL PAV MRK TY II (Y) 6" (BRK)
LF 290.000 $0.200 $1.100 $1.200 $1.500 $1.200 $1.380 $1.300
REFL PAV MRK TY II (Y) 6" (SLD)
LF 1,576.000 $0.200 $1.050 $1.150 $1.500 $1.100 $1.310 $1.240
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,290.000 $1.000 $0.660 $0.730 $1.000 $0.670 $0.850 $0.780
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 53,604.000 $0.550 $0.620 $0.700 $0.750 $0.670 $0.800 $0.730
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 9,590.000 $0.750 $0.660 $0.730 $1.000 $0.670 $0.850 $0.780
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 57,831.000 $0.550 $0.620 $0.700 $0.750 $0.670 $0.800 $0.730
PREFAB PAV MRK TY C (W) (ARROW)
EA 50.000 $240.000 $250.000 $280.000 $340.000 $300.000 $312.500 $295.840
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 4.000 $600.000 $650.000 $710.000 $890.000 $700.000 $812.600 $769.170
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $300.000 $300.000 $340.000 $410.000 $300.000 $375.000 $355.000
REFL PAV MRKR TY I-C
EA 251.000 $1.000 $9.750 $11.000 $13.000 $10.000 $12.200 $11.540
REFL PAV MRKR TY II-A-A
EA 1,208.000 $4.500 $6.000 $6.700 $8.250 $6.000 $7.500 $7.100
ELIM EXT PAV MRK & MRKS (4")
LF 1,319.000 $0.350 $6.000 $6.700 $8.250 $6.000 $7.500 $7.100
ELIM EXT PAV MRK & MRKS (6")
LF 100.000 $0.450 $9.000 $10.000 $12.000 $10.000 $11.250 $10.650
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $60.000 $190.000 $210.000 $260.000 $200.000 $237.500 $224.830
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $60.000 $190.000 $215.000 $260.000 $200.000 $237.500 $224.830
PAV SURF PREP FOR MRK (6")
LF 4,373.000 $0.150 $0.350 $0.380 $0.500 $0.350 $0.450 $0.410
PAV SURF PREP FOR MRK (8")
LF 838.000 $0.150 $0.650 $0.720 $1.000 $0.650 $0.800 $0.770
PAV SURF PREP FOR MRK (12")
LF 27.000 $0.150 $2.450 $2.700 $3.250 $2.500 $3.100 $2.900
SP MIXES SP-B SAC-B PG64-22
TON 17,613.000 $120.090 $109.000 $107.000 $110.000 $120.000 $130.250 $142.360
SP MIXES SP-C SAC-A PG70-22
TON 18,518.000 $155.000 $125.000 $128.000 $130.000 $130.000 $136.450 $155.140
TACK COAT
GAL 30,155.000 $6.000 $4.050 $4.400 $4.500 $3.500 $6.150 $5.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $2,000.000 $6,000.000 $9,600.000 $12,500.000 $22,330.000 $5,916.690
TMA (STATIONARY)
DAY 160.000 $250.000 $600.000 $330.000 $200.000 $290.000 $200.000 $381.150
TMA (MOBILE OPERATION)
DAY 10.000 $375.000 $1,000.000 $2,500.000 $300.000 $500.000 $2,850.000 $2,703.930
Totals: $13,115,067.960 $10,784,375.490 $11,447,522.140 $11,938,490.850 $11,983,648.760 $12,016,752.025 $13,881,772.034