Show Job Controls
Bid Cobra

GRIMES SH 105 (0315-04-080)

Items: 28

County: GRIMES
Length: N/A
Highway: SH 105
District: BRYAN
Control Number: 0315-04-080
DBE Goal: N/A
Project: F 2022(008)
Guaranty: N/A
Time: 59 WORKING DAYS
Engineer's Estimate: $137,989.00
Date: 09/02/2021 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$137,989.00
$199,660.59
Over/Under Est: 44.69% $61,671.59
Over/Under Est: 48.74% $67,260.00
Amt Left: 2.8% $5,588.41
Over/Under Est: 71.34% $98,437.35
Amt Left: 18.41% $36,765.76
Delta: -15.19% -$31,177.35
Over/Under Est: 78.35% $108,117.00
Amt Left: 23.26% $46,445.41
Delta: -4.09% -$9,679.65
Over/Under Est: 144.2% $198,980.38
Amt Left: 68.77% $137,308.79
Delta: -36.92% -$90,863.38
Over/Under Est: 192.73% $265,949.00
Amt Left: 102.31% $204,277.41
Delta: -19.87% -$66,968.62

Bid Items & Bid Tabulations

28 Total 0 of 28
GRIMES  |  SH 105  |  BRYAN  |  0315-04-080  |  09/02/2021  |  $137,989.00  |  F 2022(008)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  59 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FUQUA CONSTRUCTION CO., INC.
ENCINO LANDSCAPE, INC.
TEXCON GENERAL CONTRACTORS
WG ENGINEERING & CONSTRUCTION, LLC
KNIFE RIVER CORPORATION - SOUTH
FNH CONSTRUCTION, LLC
REMOVING CONC (SIDEWALKS)
SY 60.000 $11.180 $38.940 $25.000 $43.000 $30.000 $80.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 248.000 $5.090 $16.260 $15.000 $15.000 $22.000 $58.000 $20.000
REMOVING CONC (PAVERS)
SY 14.000 $11.390 $31.320 $25.000 $83.000 $30.000 $125.000 $50.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 325.000 $3.240 $10.480 $15.000 $20.500 $42.000 $51.000 $20.000
BLOCK SODDING
SY 30.000 $3.170 $10.250 $10.000 $18.350 $2.000 $20.000 $6.000
VEGETATIVE WATERING
MG 0.300 $50.000 $1,120.000 $1,000.000 $3,133.000 $100.000 $750.000 $5,000.000
STR STEEL (RAILS / POSTS / PLATES)
LB 6,060.000 $9.000 $5.600 $12.000 $10.600 $12.000 $11.170 $35.000
REMOVE STR (BOLLARD)
EA 2.000 $430.170 $313.600 $200.000 $250.000 $950.000 $250.000 $500.000
MOBILIZATION
LS 1.000 $11,010.000 $28,000.000 $15,000.000 $17,000.000 $18,850.000 $33,500.000 $40,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $7,926.440 $8,210.630 $5,000.000 $12,055.000 $4,585.000 $21,300.000 $8,500.000
COLORED TEXTURED CONC (4")
SY 131.000 $77.910 $134.400 $200.000 $180.000 $150.000 $220.000 $150.000
CONC CURB (TY II)
LF 992.000 $6.910 $40.320 $20.000 $33.900 $54.000 $44.000 $40.000
CONC SIDEWALKS (4")
SY 50.000 $60.000 $89.600 $80.000 $106.300 $90.000 $362.000 $65.000
CURB RAMPS (TY 1)
EA 4.000 $1,797.710 $2,576.000 $3,000.000 $1,500.000 $3,500.000 $1,614.000 $2,850.000
CURB RAMPS (TY 21)
EA 1.000 $2,578.920 $3,136.000 $3,000.000 $1,600.000 $4,850.000 $5,000.000 $2,850.000
ALUMINUM SIGNS (TY A)
SF 9.000 $20.390 $62.720 $100.000 $22.250 $32.000 $41.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $844.670 $672.000 $500.000 $834.000 $745.000 $705.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $697.000 $896.000 $1,000.000 $917.000 $780.000 $825.000 $850.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 235.000 $0.830 $15.680 $10.000 $5.560 $4.000 $3.500 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 64.000 $6.160 $28.000 $20.000 $11.120 $9.500 $9.400 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $133.690 $380.800 $300.000 $500.000 $250.000 $235.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $154.490 $380.800 $300.000 $500.000 $300.000 $280.000 $250.000
ELIM EXT PAV MRK & MRKS (4")
LF 228.000 $0.320 $4.480 $3.000 $3.340 $3.000 $1.760 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 28.000 $3.440 $8.960 $10.000 $16.700 $4.000 $2.350 $20.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $71.840 $336.000 $200.000 $83.000 $120.000 $118.000 $250.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 1.000 $297.700 $448.000 $350.000 $83.000 $300.000 $300.000 $250.000
TMA (STATIONARY)
DAY 30.000 $110.000 $224.000 $350.000 $325.000 $220.000 $400.000 $350.000
TMA (MOBILE OPERATION)
DAY 8.000 $57.140 $196.000 $200.000 $1,000.000 $220.000 $900.000 $850.000
Totals: $137,989.000 $199,660.590 $205,249.000 $236,426.350 $246,106.000 $336,969.380 $403,938.000