Show Job Controls
Bid Cobra

GREGG IH0020 (6431-16-001)

Items: 190

County: GREGG
Length: N/A
Highway: IH0020
District: TYLER
Control Number: 6431-16-001
DBE Goal: N/A
Project: RMC - 643116001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $6,380,842.85
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: TOTAL MAINTENANCE
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,380,842.85
$4,768,998.00
Over/Under Est: -25.26% -$1,611,844.85
Over/Under Est: 19.31% $1,232,327.15
Amt Left: 59.64% $2,844,172.00
Subcontractor Percentage Amount
CEN-TEX IRRIGATION SYSTEMS, INC. 2.59% $274,483.71
HX FARMS, INC. 1.59% $168,505.44
CATOCON, INC. 0.85% $90,081.53
SERVIN MOWING CONTRACTORS, LLC 0.80% $84,782.61
STRIPING TECHNOLOGY, L.P. 0.00% $0.00
Total: 5.83% $617,853.29

Bid Items & Bid Tabulations

190 Total 0 of 190
GREGG  |  IH0020  |  TYLER  |  6431-16-001  |  05/04/2023  |  $6,380,842.85  |  RMC - 643116001  |  TOTAL MAINT  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
CROSS PLUS CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 10.000 $32.000 $500.000 $110.000
EXCAVATION (CHANNEL)
CY 50.000 $35.000 $80.000 $82.500
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 750.000 $28.000 $100.000 $33.000
BACKFILL (TY A)
LF 22,000.000 $45.000 $2.000 $7.700
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 200.000 $1.500 $5.000 $5.000
VEGETATIVE WATERING
MG 2.200 $12.500 $4,000.000 $500.000
FOG SEAL (SS-1H)
GAL 200.000 $12.000 $20.000 $22.000
FLEX PAVEMENT STRUCTURE REPAIR (2"-6")
SY 2,000.000 $200.000 $120.000 $170.500
FULL - DEPTH REPAIR CRCP (10")
SY 500.000 $280.000 $120.000 $660.000
FLOWABLE BACKFILL
CY 150.000 $256.000 $400.000 $275.000
DRILL SHAFT (24 IN)
LF 15.000 $113.000 $200.000 $275.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 250.000 $103.000 $100.000 $220.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $168.000 $400.000 $192.500
CONC STR REPAIR (STANDARD)
SF 200.000 $168.000 $200.000 $192.500
RIPRAP (CONC)(5 IN)
CY 10.000 $550.000 $1,500.000 $495.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 150.000 $260.000 $350.000 $220.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $268.000 $200.000 $495.000
MOBILIZATION (CALLOUT)
EA 24.000 $8,300.000 $1.000 $6,600.000
MOBILIZATION (EMERGENCY)
EA 24.000 $1,000.000 $1.000 $6,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $34,000.000 $20,000.000 $6,600.000
PERM CTB (SGL SLOPE) (TY 2) (42 )
LF 35.000 $220.000 $200.000 $275.000
RUMBLE STRIPS (SHOULDER)
LF 50,000.000 $0.200 $0.140 $1.100
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $27.000 $40.000 $44.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 25.000 $35.000 $10.000 $99.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,880.000 $2,000.000 $2,750.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $638.000 $1,000.000 $2,750.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 25.000 $10.000 $20.000 $3.300
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 25.000 $2.000 $20.000 $11.000
TRANSITION ADJUSTMENT
EA 1.000 $100.000 $100.000 $440.000
SHORT RADIUS
LF 200.000 $75.000 $75.000 $71.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,142.000 $3,000.000 $1,650.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $6.000 $0.100 $5.500
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $610.000 $200.000 $275.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 2.000 $4,400.000 $2,000.000 $4,235.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $2,020.000 $100.000 $550.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 600.000 $33.000 $12.000 $35.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 150.000 $35.000 $50.000 $69.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $830.000 $500.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 200.000 $223.000 $300.000 $715.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $1,000.000 $450.000 $440.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $575.000 $500.000 $2,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 15.000 $813.000 $200.000 $935.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 5.000 $700.000 $200.000 $935.000
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 100.000 $800.000 $50.000 $660.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 25.000 $256.000 $600.000 $660.000
REMOVE SM RD SN SUP&AM
EA 8.000 $114.000 $50.000 $55.000
INSTALL LRSS (STRUCT STEEL)
LB 2,000.000 $7.000 $20.000 $15.000
REMOVE LRSA
EA 3.000 $995.000 $30.000 $2,500.000
REMOVE AND RESET LRSA
EA 30.000 $3,000.000 $2,000.000 $3,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 500.000 $5.000 $8.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 500.000 $24.000 $8.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 25.000 $7.500 $0.100 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 125.000 $5.200 $50.000 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 100.000 $8.500 $40.000 $33.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 400.000 $33.000 $20.000 $33.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $12.000 $0.100 $33.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 200.000 $10.000 $20.000 $33.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 250.000 $0.150 $0.100 $5.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 84,000.000 $0.750 $0.850 $0.680
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 500.000 $1.050 $0.500 $3.200
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
LF 11,000.000 $1.200 $1.000 $1.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 500.000 $0.310 $0.200 $0.200
REFL PAV MRK TY II (W) 6" (SLD)
LF 20,000.000 $0.250 $0.100 $0.200
REFL PAV MRK TY II (Y) 6" (BRK)
LF 500.000 $0.350 $0.200 $0.200
REFL PAV MRK TY II (Y) 6" (SLD)
LF 500.000 $0.250 $0.150 $0.150
PAVEMENT SEALER 6"
LF 100.000 $0.200 $1.000 $1.000
PAVEMENT SEALER 8"
LF 500.000 $0.200 $0.500 $1.000
PAVEMENT SEALER 12"
LF 100.000 $0.450 $1.000 $1.000
PAVEMENT SEALER 24"
LF 100.000 $0.750 $2.000 $2.000
PAVEMENT SEALER (ARROW)
EA 5.000 $18.500 $50.000 $50.000
PAVEMENT SEALER (WORD)
EA 5.000 $19.200 $60.000 $60.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $24.000 $70.000 $70.000
PAVEMENT SEALER (YLD TRI)
EA 5.000 $12.600 $20.000 $20.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 200,000.000 $0.400 $0.900 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 650,000.000 $0.400 $0.680 $0.400
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 200,000.000 $0.400 $0.500 $0.400
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 25.000 $8.900 $10.000 $10.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 4,000.000 $11.250 $12.500 $12.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 34.000 $200.000 $80.000 $190.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 3.000 $308.000 $275.000 $275.000
PREFAB PAV MRK TY C (W) (WORD)
EA 30.000 $241.000 $120.000 $245.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 200.000 $32.500 $40.000 $40.000
REFL PAV MRKR TY I-A
EA 150.000 $2.900 $6.000 $3.500
REFL PAV MRKR TY I-C
EA 600.000 $3.440 $0.500 $3.500
REFL PAV MRKR TY II-A-A
EA 3,000.000 $4.200 $5.000 $3.500
REFL PAV MRKR TY II-C-R
EA 30,000.000 $3.500 $4.000 $3.500
ELIM EXT PAV MRK & MRKS (6")
LF 10,000.000 $0.600 $0.400 $0.400
ELIM EXT PAV MRK & MRKS (8")
LF 400.000 $0.600 $1.000 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 500.000 $2.000 $2.000 $2.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 5.000 $41.900 $40.000 $40.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 1.000 $64.500 $80.000 $80.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 5.000 $57.900 $70.000 $70.000
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 20.000 $12.250 $50.000 $30.000
PAV SURF PREP FOR MRK (6")
LF 100.000 $0.100 $1.000 $0.500
PAV SURF PREP FOR MRK (8")
LF 100.000 $0.400 $1.000 $0.500
PAV SURF PREP FOR MRK (12")
LF 100.000 $0.150 $1.000 $0.500
PAV SURF PREP FOR MRK (24")
LF 100.000 $0.250 $1.000 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $8.400 $25.000 $25.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $7.700 $50.000 $50.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $11.000 $40.000 $40.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 5.000 $4.150 $20.000 $20.000
POTHOLE REPAIR (STANDARD)
SY 200.000 $120.000 $150.000 $200.000
JT / CRCK SEAL (RUBBER - ASPHALT)
LMI 300.000 $497.000 $650.000 $1,200.000
FULL - WIDTH MOWING
AC 10,540.000 $41.000 $32.000 $42.000
SPOT MOWING
AC 50.000 $27.000 $30.000 $42.000
BROADCAST APPLICATION
MI 80.000 $1,000.000 $900.000 $2,600.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 80.000 $616.500 $600.000 $2,600.000
WICK APPLICATION OF HERBICIDE
MI 40.000 $1,000.000 $500.000 $4,100.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 175.000 $908.000 $500.000 $3,800.000
DEBRIS REMOVAL (FRONTAGE ROADS)
CYC 20.000 $500.000 $4,000.000 $4,000.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
CYC 20.000 $500.000 $4,000.000 $4,000.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 10.000 $75.000 $1,000.000 $275.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 3.000 $10,000.000 $20,000.000 $25,000.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 3.000 $10,000.000 $20,000.000 $25,000.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
CYC 3.000 $5,000.000 $10,000.000 $20,000.000
GRAFFITI REMOVAL (BLAST CLEANING)
SF 10.000 $2.000 $75.000 $44.000
GRAFFITI REMOVAL (PAINTING)
SF 30.000 $1.000 $60.000 $33.000
GRAFFITI REMOVAL (CHEMICAL CLEANING)
SF 10.000 $4.000 $100.000 $33.000
TREE TRIMMING / BRUSH REMOVAL
MI 20.000 $2,550.000 $4,500.000 $2,800.000
TREE REMOVAL (4" - 12" DIA)
EA 4,000.000 $62.000 $60.000 $100.000
TREE REMOVAL (12" - 18" DIA)
EA 500.000 $97.000 $100.000 $125.000
TREE REMOVAL (18" - 24" DIA)
EA 150.000 $140.000 $100.000 $250.000
TREE REMOVAL (24" - 30" DIA)
EA 50.000 $541.000 $100.000 $350.000
TREE REMOVAL (30" - 36" DIA)
EA 20.000 $310.000 $100.000 $450.000
TREE REMOVAL (36" - 42" DIA)
EA 5.000 $370.000 $100.000 $450.000
TREE REMOVAL (42" - 48" DIA)
EA 2.000 $347.000 $100.000 $450.000
TREE REMOVAL (48" - 60" DIA)
EA 2.000 $418.000 $100.000 $450.000
TREE REMOVAL (60" - 72" DIA)
EA 1.000 $526.000 $100.000 $450.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 20,000.000 $13.000 $0.300 $11.000
STORM SEWER CLEAN (BOX CULV)(ALL SIZES)
LF 250.000 $5.000 $80.000 $330.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,200.000 $28.000 $30.000 $27.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 75.000 $33.000 $40.000 $27.500
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 15.000 $55.000 $50.000 $44.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 90.000 $32.000 $10.000 $44.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $48.000 $100.000 $44.000
REM / REPL TIMBER POST W / O CONC FND
EA 100.000 $52.000 $10.000 $44.000
REPAIR STEEL POST WITH BASE PLATE
EA 2.000 $225.000 $20.000 $385.000
REALIGN POSTS
EA 175.000 $41.000 $25.000 $82.500
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 30.000 $14.000 $5.000 $22.000
REMOVE & REPLACE BLOCKOUT
EA 300.000 $35.000 $30.000 $33.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,200.000 $34.000 $50.000 $44.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 300.000 $86.000 $80.000 $88.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $39.000 $20.000 $440.000
REPLACE HINGED TOP SGT STEEL POST
EA 5.000 $350.000 $1,000.000 $200.000
RESET HINGED TOP SGT STL POST
EA 5.000 $92.000 $200.000 $200.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $3,327.000 $2,000.000 $4,235.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $981.000 $1,000.000 $2,200.000
REM & RESET SGT IMPACT HEAD
EA 15.000 $118.000 $200.000 $550.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $57.000 $30.000 $150.000
REPLACE SGT CABLE ANCHOR
EA 30.000 $56.000 $30.000 $500.000
REPLACE SGT STRUT
EA 25.000 $49.000 $10.000 $325.000
REPLACE SGT OBJECT MARKER
EA 75.000 $23.000 $10.000 $125.000
REPAIR (TRACC)
EA 1.000 $720.000 $1,000.000 $5,000.000
REPAIR (NARROW QUAD)
EA 1.000 $300.000 $1,000.000 $4,599.000
REPAIR (QUAD) (N) (BAY)
EA 10.000 $900.000 $800.000 $5,000.000
REMOVE AND REPLACE (FASTRACC)
EA 1.000 $3,444.000 $100.000 $35,000.000
REPAIR (FASTRACC)
LF 10.000 $25.000 $200.000 $15,000.000
REPAIR (FASTRACC) (BAY)
EA 2.000 $650.000 $400.000 $15,000.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 50.000 $23.000 $100.000 $137.500
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 15.000 $13.000 $100.000 $119.900
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 15.000 $22.000 $100.000 $110.000
REPLACE ABOVE-GROUND CONDUIT
LF 150.000 $8.000 $8.000 $15.000
REPLACE UNDERGROUND CONDUIT
LF 100.000 $8.000 $7.000 $25.000
REPLACE CONDUCTOR
LF 5,000.000 $3.000 $5.000 $8.000
INSTALL ELECTRICAL SPLICE
EA 25.000 $55.000 $50.000 $250.000
ROAD BORE
LF 45.000 $22.000 $20.000 $45.000
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
EA 10.000 $2,268.000 $700.000 $1,500.000
REPLACE HIGH MAST LUMINAIRES
EA 50.000 $250.000 $200.000 $500.000
REPLACE LUMINAIRE POLE
EA 7.000 $1,100.000 $1,000.000 $5,000.000
REPLACE LUMINAIRE ARMS
EA 2.000 $75.000 $50.000 $1,500.000
MAINTAIN HIGH MAST ILLUMINATION
EA 5.000 $1,350.000 $1,200.000 $2,500.000
REPLACE ELECTRICAL SERVICE
EA 1.000 $3,900.000 $3,200.000 $6,500.000
REPLACE TIMBER SERVICE POLE
EA 2.000 $730.000 $700.000 $1,200.000
REPLACE STEEL SERVICE POLE
EA 2.000 $1,000.000 $2,000.000 $2,500.000
INSTALL GROUND BOX W/APRON
EA 2.000 $700.000 $800.000 $1,200.000
INSTALL FOUNDATION
EA 2.000 $1,294.000 $1,200.000 $1,200.000
REPLACE TRANSFORMER BASE
EA 2.000 $550.000 $700.000 $500.000
REPLACE TRANSFORMER BASE COVER
EA 1.000 $50.000 $50.000 $500.000
REPLACE WALL PACK LUMINAIRE
EA 2.000 $500.000 $250.000 $1,500.000
REPLACE FUSE
EA 60.000 $75.000 $75.000 $250.000
REPLACE BREAKAWAY FUSE HOLDER
EA 20.000 $140.000 $100.000 $250.000
REPLACE HAND-OFF-AUTO SWITCH
EA 2.000 $113.000 $100.000 $350.000
REPLACE CONTACTOR
EA 3.000 $280.000 $250.000 $550.000
REPLACE BREAKER PANEL
EA 1.000 $477.000 $400.000 $550.000
REPLACE CIRCUIT BREAKER
EA 2.000 $800.000 $800.000 $850.000
RAISE AND LOWER RING (HIGH MAST LIGHT)
EA 2.000 $500.000 $1,000.000 $5,000.000
REPLACE LUMINAIRES
EA 40.000 $250.000 $210.000 $900.000
REPLACE PHOTOCELL
EA 10.000 $85.000 $75.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 300.000 $100.000 $1,000.000 $100.000
TMA (STATIONARY)
DAY 1,600.000 $230.000 $1.000 $250.000
Totals: $6,380,842.850 $4,768,998.000 $7,613,170.000