REMOVING CONC (RIPRAP)
|
SY
|
10.000
|
$32.000
|
$500.000
|
$110.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
50.000
|
$35.000
|
$80.000
|
$82.500
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
750.000
|
$28.000
|
$100.000
|
$33.000
|
|
|
BACKFILL (TY A)
|
LF
|
22,000.000
|
$45.000
|
$2.000
|
$7.700
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
200.000
|
$1.500
|
$5.000
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2.200
|
$12.500
|
$4,000.000
|
$500.000
|
|
|
FOG SEAL (SS-1H)
|
GAL
|
200.000
|
$12.000
|
$20.000
|
$22.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2"-6")
|
SY
|
2,000.000
|
$200.000
|
$120.000
|
$170.500
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
500.000
|
$280.000
|
$120.000
|
$660.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
150.000
|
$256.000
|
$400.000
|
$275.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
15.000
|
$113.000
|
$200.000
|
$275.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
250.000
|
$103.000
|
$100.000
|
$220.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
100.000
|
$168.000
|
$400.000
|
$192.500
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
200.000
|
$168.000
|
$200.000
|
$192.500
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
$550.000
|
$1,500.000
|
$495.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
150.000
|
$260.000
|
$350.000
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
20.000
|
$268.000
|
$200.000
|
$495.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
24.000
|
$8,300.000
|
$1.000
|
$6,600.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
24.000
|
$1,000.000
|
$1.000
|
$6,600.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$34,000.000
|
$20,000.000
|
$6,600.000
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
35.000
|
$220.000
|
$200.000
|
$275.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
50,000.000
|
$0.200
|
$0.140
|
$1.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
50.000
|
$27.000
|
$40.000
|
$44.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
25.000
|
$35.000
|
$10.000
|
$99.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,880.000
|
$2,000.000
|
$2,750.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
1.000
|
$638.000
|
$1,000.000
|
$2,750.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
25.000
|
$10.000
|
$20.000
|
$3.300
|
|
|
MTL THRIE-BEAM GD FEN ADJUSTMENT
|
LF
|
25.000
|
$2.000
|
$20.000
|
$11.000
|
|
|
TRANSITION ADJUSTMENT
|
EA
|
1.000
|
$100.000
|
$100.000
|
$440.000
|
|
|
SHORT RADIUS
|
LF
|
200.000
|
$75.000
|
$75.000
|
$71.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,142.000
|
$3,000.000
|
$1,650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
100.000
|
$6.000
|
$0.100
|
$5.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$610.000
|
$200.000
|
$275.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
2.000
|
$4,400.000
|
$2,000.000
|
$4,235.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$2,020.000
|
$100.000
|
$550.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
600.000
|
$33.000
|
$12.000
|
$35.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
150.000
|
$35.000
|
$50.000
|
$69.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
30.000
|
$830.000
|
$500.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
200.000
|
$223.000
|
$300.000
|
$715.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$1,000.000
|
$450.000
|
$440.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$575.000
|
$500.000
|
$2,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
15.000
|
$813.000
|
$200.000
|
$935.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
5.000
|
$700.000
|
$200.000
|
$935.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
100.000
|
$800.000
|
$50.000
|
$660.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
25.000
|
$256.000
|
$600.000
|
$660.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$114.000
|
$50.000
|
$55.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,000.000
|
$7.000
|
$20.000
|
$15.000
|
|
|
REMOVE LRSA
|
EA
|
3.000
|
$995.000
|
$30.000
|
$2,500.000
|
|
|
REMOVE AND RESET LRSA
|
EA
|
30.000
|
$3,000.000
|
$2,000.000
|
$3,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
500.000
|
$5.000
|
$8.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
500.000
|
$24.000
|
$8.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
25.000
|
$7.500
|
$0.100
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
125.000
|
$5.200
|
$50.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
100.000
|
$8.500
|
$40.000
|
$33.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
400.000
|
$33.000
|
$20.000
|
$33.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
25.000
|
$12.000
|
$0.100
|
$33.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
200.000
|
$10.000
|
$20.000
|
$33.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
250.000
|
$0.150
|
$0.100
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
84,000.000
|
$0.750
|
$0.850
|
$0.680
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
500.000
|
$1.050
|
$0.500
|
$3.200
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
|
LF
|
11,000.000
|
$1.200
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
500.000
|
$0.310
|
$0.200
|
$0.200
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
20,000.000
|
$0.250
|
$0.100
|
$0.200
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
500.000
|
$0.350
|
$0.200
|
$0.200
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
500.000
|
$0.250
|
$0.150
|
$0.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
100.000
|
$0.200
|
$1.000
|
$1.000
|
|
|
PAVEMENT SEALER 8"
|
LF
|
500.000
|
$0.200
|
$0.500
|
$1.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
100.000
|
$0.450
|
$1.000
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
100.000
|
$0.750
|
$2.000
|
$2.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
5.000
|
$18.500
|
$50.000
|
$50.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
5.000
|
$19.200
|
$60.000
|
$60.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
1.000
|
$24.000
|
$70.000
|
$70.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
5.000
|
$12.600
|
$20.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
200,000.000
|
$0.400
|
$0.900
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
650,000.000
|
$0.400
|
$0.680
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
200,000.000
|
$0.400
|
$0.500
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
25.000
|
$8.900
|
$10.000
|
$10.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
4,000.000
|
$11.250
|
$12.500
|
$12.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
34.000
|
$200.000
|
$80.000
|
$190.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
3.000
|
$308.000
|
$275.000
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
30.000
|
$241.000
|
$120.000
|
$245.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
200.000
|
$32.500
|
$40.000
|
$40.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
150.000
|
$2.900
|
$6.000
|
$3.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
600.000
|
$3.440
|
$0.500
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,000.000
|
$4.200
|
$5.000
|
$3.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
30,000.000
|
$3.500
|
$4.000
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
10,000.000
|
$0.600
|
$0.400
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
400.000
|
$0.600
|
$1.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
500.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$41.900
|
$40.000
|
$40.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
1.000
|
$64.500
|
$80.000
|
$80.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$57.900
|
$70.000
|
$70.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
20.000
|
$12.250
|
$50.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
100.000
|
$0.100
|
$1.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
100.000
|
$0.400
|
$1.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
100.000
|
$0.150
|
$1.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
100.000
|
$0.250
|
$1.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
1.000
|
$8.400
|
$25.000
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
1.000
|
$7.700
|
$50.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$11.000
|
$40.000
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
5.000
|
$4.150
|
$20.000
|
$20.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
200.000
|
$120.000
|
$150.000
|
$200.000
|
|
|
JT / CRCK SEAL (RUBBER - ASPHALT)
|
LMI
|
300.000
|
$497.000
|
$650.000
|
$1,200.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
10,540.000
|
$41.000
|
$32.000
|
$42.000
|
|
|
SPOT MOWING
|
AC
|
50.000
|
$27.000
|
$30.000
|
$42.000
|
|
|
BROADCAST APPLICATION
|
MI
|
80.000
|
$1,000.000
|
$900.000
|
$2,600.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
80.000
|
$616.500
|
$600.000
|
$2,600.000
|
|
|
WICK APPLICATION OF HERBICIDE
|
MI
|
40.000
|
$1,000.000
|
$500.000
|
$4,100.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
175.000
|
$908.000
|
$500.000
|
$3,800.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
20.000
|
$500.000
|
$4,000.000
|
$4,000.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
20.000
|
$500.000
|
$4,000.000
|
$4,000.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
10.000
|
$75.000
|
$1,000.000
|
$275.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
3.000
|
$10,000.000
|
$20,000.000
|
$25,000.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
3.000
|
$10,000.000
|
$20,000.000
|
$25,000.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
3.000
|
$5,000.000
|
$10,000.000
|
$20,000.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
10.000
|
$2.000
|
$75.000
|
$44.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
30.000
|
$1.000
|
$60.000
|
$33.000
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
10.000
|
$4.000
|
$100.000
|
$33.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
20.000
|
$2,550.000
|
$4,500.000
|
$2,800.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
4,000.000
|
$62.000
|
$60.000
|
$100.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
500.000
|
$97.000
|
$100.000
|
$125.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
150.000
|
$140.000
|
$100.000
|
$250.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
50.000
|
$541.000
|
$100.000
|
$350.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
20.000
|
$310.000
|
$100.000
|
$450.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
5.000
|
$370.000
|
$100.000
|
$450.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
2.000
|
$347.000
|
$100.000
|
$450.000
|
|
|
TREE REMOVAL (48" - 60" DIA)
|
EA
|
2.000
|
$418.000
|
$100.000
|
$450.000
|
|
|
TREE REMOVAL (60" - 72" DIA)
|
EA
|
1.000
|
$526.000
|
$100.000
|
$450.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
20,000.000
|
$13.000
|
$0.300
|
$11.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(ALL SIZES)
|
LF
|
250.000
|
$5.000
|
$80.000
|
$330.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
3,200.000
|
$28.000
|
$30.000
|
$27.500
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
75.000
|
$33.000
|
$40.000
|
$27.500
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
15.000
|
$55.000
|
$50.000
|
$44.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
90.000
|
$32.000
|
$10.000
|
$44.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
100.000
|
$48.000
|
$100.000
|
$44.000
|
|
|
REM / REPL TIMBER POST W / O CONC FND
|
EA
|
100.000
|
$52.000
|
$10.000
|
$44.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
2.000
|
$225.000
|
$20.000
|
$385.000
|
|
|
REALIGN POSTS
|
EA
|
175.000
|
$41.000
|
$25.000
|
$82.500
|
|
|
INSTALL BLOCKOUT (TYPE SPECIFIED)
|
EA
|
30.000
|
$14.000
|
$5.000
|
$22.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
300.000
|
$35.000
|
$30.000
|
$33.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
2,200.000
|
$34.000
|
$50.000
|
$44.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
300.000
|
$86.000
|
$80.000
|
$88.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
2.000
|
$39.000
|
$20.000
|
$440.000
|
|
|
REPLACE HINGED TOP SGT STEEL POST
|
EA
|
5.000
|
$350.000
|
$1,000.000
|
$200.000
|
|
|
RESET HINGED TOP SGT STL POST
|
EA
|
5.000
|
$92.000
|
$200.000
|
$200.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
5.000
|
$3,327.000
|
$2,000.000
|
$4,235.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
50.000
|
$981.000
|
$1,000.000
|
$2,200.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
15.000
|
$118.000
|
$200.000
|
$550.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
30.000
|
$57.000
|
$30.000
|
$150.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
30.000
|
$56.000
|
$30.000
|
$500.000
|
|
|
REPLACE SGT STRUT
|
EA
|
25.000
|
$49.000
|
$10.000
|
$325.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
75.000
|
$23.000
|
$10.000
|
$125.000
|
|
|
REPAIR (TRACC)
|
EA
|
1.000
|
$720.000
|
$1,000.000
|
$5,000.000
|
|
|
REPAIR (NARROW QUAD)
|
EA
|
1.000
|
$300.000
|
$1,000.000
|
$4,599.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
10.000
|
$900.000
|
$800.000
|
$5,000.000
|
|
|
REMOVE AND REPLACE (FASTRACC)
|
EA
|
1.000
|
$3,444.000
|
$100.000
|
$35,000.000
|
|
|
REPAIR (FASTRACC)
|
LF
|
10.000
|
$25.000
|
$200.000
|
$15,000.000
|
|
|
REPAIR (FASTRACC) (BAY)
|
EA
|
2.000
|
$650.000
|
$400.000
|
$15,000.000
|
|
|
REPAIR (STEEL POST W/ W-BEAM - T101)
|
LF
|
50.000
|
$23.000
|
$100.000
|
$137.500
|
|
|
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
|
LF
|
15.000
|
$13.000
|
$100.000
|
$119.900
|
|
|
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
|
LF
|
15.000
|
$22.000
|
$100.000
|
$110.000
|
|
|
REPLACE ABOVE-GROUND CONDUIT
|
LF
|
150.000
|
$8.000
|
$8.000
|
$15.000
|
|
|
REPLACE UNDERGROUND CONDUIT
|
LF
|
100.000
|
$8.000
|
$7.000
|
$25.000
|
|
|
REPLACE CONDUCTOR
|
LF
|
5,000.000
|
$3.000
|
$5.000
|
$8.000
|
|
|
INSTALL ELECTRICAL SPLICE
|
EA
|
25.000
|
$55.000
|
$50.000
|
$250.000
|
|
|
ROAD BORE
|
LF
|
45.000
|
$22.000
|
$20.000
|
$45.000
|
|
|
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
|
EA
|
10.000
|
$2,268.000
|
$700.000
|
$1,500.000
|
|
|
REPLACE HIGH MAST LUMINAIRES
|
EA
|
50.000
|
$250.000
|
$200.000
|
$500.000
|
|
|
REPLACE LUMINAIRE POLE
|
EA
|
7.000
|
$1,100.000
|
$1,000.000
|
$5,000.000
|
|
|
REPLACE LUMINAIRE ARMS
|
EA
|
2.000
|
$75.000
|
$50.000
|
$1,500.000
|
|
|
MAINTAIN HIGH MAST ILLUMINATION
|
EA
|
5.000
|
$1,350.000
|
$1,200.000
|
$2,500.000
|
|
|
REPLACE ELECTRICAL SERVICE
|
EA
|
1.000
|
$3,900.000
|
$3,200.000
|
$6,500.000
|
|
|
REPLACE TIMBER SERVICE POLE
|
EA
|
2.000
|
$730.000
|
$700.000
|
$1,200.000
|
|
|
REPLACE STEEL SERVICE POLE
|
EA
|
2.000
|
$1,000.000
|
$2,000.000
|
$2,500.000
|
|
|
INSTALL GROUND BOX W/APRON
|
EA
|
2.000
|
$700.000
|
$800.000
|
$1,200.000
|
|
|
INSTALL FOUNDATION
|
EA
|
2.000
|
$1,294.000
|
$1,200.000
|
$1,200.000
|
|
|
REPLACE TRANSFORMER BASE
|
EA
|
2.000
|
$550.000
|
$700.000
|
$500.000
|
|
|
REPLACE TRANSFORMER BASE COVER
|
EA
|
1.000
|
$50.000
|
$50.000
|
$500.000
|
|
|
REPLACE WALL PACK LUMINAIRE
|
EA
|
2.000
|
$500.000
|
$250.000
|
$1,500.000
|
|
|
REPLACE FUSE
|
EA
|
60.000
|
$75.000
|
$75.000
|
$250.000
|
|
|
REPLACE BREAKAWAY FUSE HOLDER
|
EA
|
20.000
|
$140.000
|
$100.000
|
$250.000
|
|
|
REPLACE HAND-OFF-AUTO SWITCH
|
EA
|
2.000
|
$113.000
|
$100.000
|
$350.000
|
|
|
REPLACE CONTACTOR
|
EA
|
3.000
|
$280.000
|
$250.000
|
$550.000
|
|
|
REPLACE BREAKER PANEL
|
EA
|
1.000
|
$477.000
|
$400.000
|
$550.000
|
|
|
REPLACE CIRCUIT BREAKER
|
EA
|
2.000
|
$800.000
|
$800.000
|
$850.000
|
|
|
RAISE AND LOWER RING (HIGH MAST LIGHT)
|
EA
|
2.000
|
$500.000
|
$1,000.000
|
$5,000.000
|
|
|
REPLACE LUMINAIRES
|
EA
|
40.000
|
$250.000
|
$210.000
|
$900.000
|
|
|
REPLACE PHOTOCELL
|
EA
|
10.000
|
$85.000
|
$75.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
300.000
|
$100.000
|
$1,000.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,600.000
|
$230.000
|
$1.000
|
$250.000
|
|
Totals: |
$6,380,842.850
|
$4,768,998.000
|