GREGG SH 300 (1385-02-024)

Items: 128

County: GREGG
Length: N/A
Highway: SH 300
District: TYLER
Control Number: 1385-02-024
DBE Goal: N/A
Project: NH 2018(517)
Guaranty: N/A
Time: 285 WORKING DAYS
Engineer's Estimate: $7,852,366.15
Date: 02/01/2018 (8 years ago)
Contract Number: N/A
Type: BS RPR,OCST,PFC,HMAC,STRS,PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,852,366.15
$6,613,692.24
Over/Under Est: -15.77% -$1,238,673.91
Over/Under Est: -8.82% -$692,566.18
Amt Left: 8.26% $546,107.73
Over/Under Est: -8.36% -$656,337.75
Amt Left: 8.81% $582,336.16
Delta: -0.51% -$36,228.43
Over/Under Est: -1.9% -$149,322.15
Amt Left: 16.47% $1,089,351.76
Delta: -7.05% -$507,015.60

Bid Items & Bid Tabulations

128 Total 0 of 128
GREGG  |  SH 300  |  TYLER  |  1385-02-024  |  02/01/2018  |  $7,852,366.15  |  NH 2018(517)  |  BS RPR,OCST,PFC,HMAC,STRS,PV MK  |  285 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PREPARING ROW
STA 3.000 $3,000.000 $800.000 $2,000.000 $2,000.000 $10,000.000
REMOVING CONC (PAV)
SY 221.000 $25.000 $12.000 $12.000 $25.000 $15.000
REMOVING CONC (DRIVEWAYS)
SY 635.000 $16.000 $15.500 $12.000 $18.000 $15.000
REMOVING CONC (CURB)
LF 12.000 $11.000 $15.000 $20.000 $25.000 $15.000
REMOVING CONC (CURB AND GUTTER)
LF 135.000 $11.000 $5.000 $15.000 $10.000 $4.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,600.000 $3.600 $2.000 $4.000 $3.750 $6.000
SUBGRADE WIDENING (ORD COMP)
STA 115.180 $250.000 $232.000 $325.000 $200.000 $500.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 863.000 $30.000 $20.000 $14.000 $24.000 $36.000
BACKFILL (TY B)
STA 126.720 $200.000 $140.000 $375.000 $190.000 $215.000
BLADING
STA 121.670 $125.000 $150.000 $200.000 $295.000 $325.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,341.000 $2.400 $3.000 $2.000 $3.250 $4.000
BLOCK SODDING
SY 1,083.000 $4.100 $5.350 $5.500 $4.400 $4.500
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 29,270.000 $1.300 $0.850 $0.900 $1.000 $0.800
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 14,638.000 $1.150 $0.850 $0.800 $1.000 $0.750
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 14,638.000 $1.150 $0.840 $0.800 $1.000 $0.750
VEGETATIVE WATERING
MG 433.000 $10.500 $10.000 $15.000 $12.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 2,400.000 $2.500 $1.400 $1.500 $1.000 $1.100
SOIL RETENTION BLANKETS (CL 2) (TY H)
SY 1,041.000 $3.500 $5.970 $4.500 $5.000 $3.150
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 107,280.000 $2.800 $2.200 $3.150 $3.000 $2.400
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 2,554.000 $100.000 $160.000 $122.000 $140.000 $120.000
PFC (ASPHALT) PG76-22
TON 268.000 $130.000 $125.000 $130.000 $160.000 $0.010
PFC-F (AGGR) PG76-22 SAC-A
TON 4,191.000 $135.000 $125.000 $130.000 $160.000 $150.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 3,942.000 $100.000 $80.000 $98.000 $100.000 $108.000
SUPERPAVE MIXTURES SP-C PG64-22
TON 12,868.000 $105.000 $94.000 $95.000 $100.000 $110.000
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 13,314.000 $105.000 $97.000 $100.000 $101.000 $117.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,500.000 $70.000 $50.000 $50.000 $50.000 $58.000
PLANE ASPH CONC PAV(0" TO 2")
SY 64,232.000 $2.600 $2.000 $1.750 $1.500 $2.400
PLANE CONC PAV(0" TO 1-1/2")
SY 2,976.000 $3.600 $4.250 $1.750 $2.750 $2.500
PLANE ASPH CONC PAV (1.5")
SY 1,367.000 $2.100 $4.250 $1.750 $4.750 $5.250
PLANE ASPH CONC PAV (2")
SY 122,412.000 $2.700 $2.000 $1.750 $1.400 $2.400
CUT & RESTORING PAV
SY 94.000 $115.000 $303.000 $135.000 $130.000 $140.000
FLOWABLE BACKFILL
CY 204.000 $300.000 $175.000 $200.000 $190.000 $180.000
TRENCH EXCAVATION PROTECTION
LF 164.000 $6.500 $6.000 $10.000 $17.500 $9.000
TEMPORARY SPL SHORING
SF 2,946.000 $65.000 $20.750 $25.000 $36.000 $30.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 15.000 $220.000 $305.000 $340.000 $335.000 $320.000
CL C CONC (COLLAR)
EA 3.000 $1,200.000 $750.000 $1,000.000 $1,500.000 $1,500.000
CL E CONC (SEAL)
CY 3.000 $550.000 $330.000 $500.000 $1,000.000 $475.000
RIPRAP (CONC)(CL B)
CY 2.000 $525.000 $350.000 $1,000.000 $850.000 $1,000.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 100.000 $180.000 $150.000 $150.000 $155.000 $155.000
CONC BOX CULV (4 FT X 4 FT)
LF 96.000 $375.000 $400.000 $350.000 $265.000 $540.000
CONC BOX CULV (4 FT X 7 FT) (EXTEND)
LF 8.000 $800.000 $800.000 $1,000.000 $700.000 $1,275.000
CONC BOX CULV (4FT X 6FT)(EXTEND)
LF 8.000 $685.000 $700.000 $1,000.000 $700.000 $1,760.000
RC PIPE (CL III)(18 IN)
LF 2,080.000 $40.000 $50.000 $40.000 $38.000 $65.000
RC PIPE (CL III)(24 IN)
LF 236.000 $60.000 $60.000 $50.000 $68.000 $90.000
RC PIPE (CL III)(30 IN)
LF 42.000 $70.000 $80.000 $65.000 $97.000 $300.000
WINGWALL (PW - 2) (HW=10 FT)
EA 1.000 $28,000.000 $26,000.000 $30,000.000 $35,000.000 $27,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $10,500.000 $8,900.000 $7,500.000 $11,000.000 $7,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $11,000.000 $10,200.000 $16,000.000 $20,000.000 $8,000.000
WINGWALL (PW - 2) (HW=9 FT)
EA 1.000 $25,000.000 $21,000.000 $22,000.000 $27,000.000 $24,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 124.000 $650.000 $600.000 $550.000 $600.000 $335.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $800.000 $650.000 $900.000 $765.000 $1,275.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,270.000 $1,000.000 $1,000.000 $950.000 $600.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 4.000 $1,500.000 $890.000 $1,100.000 $925.000 $1,125.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,200.000 $2,500.000 $1,800.000 $1,575.000 $1,100.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $2,300.000 $1,700.000 $2,100.000 $1,375.000 $2,000.000
CLEAN EXIST CULVERTS
EA 2.000 $1,650.000 $600.000 $1,000.000 $1,500.000 $1,500.000
MOBILIZATION
LS 1.000 $725,000.000 $458,000.000 $500,000.000 $500,000.000 $455,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $6,800.000 $1,500.000 $10,000.000 $2,500.000 $4,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,530.000 $27.000 $20.000 $24.000 $24.000 $25.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,620.000 $30.000 $25.000 $27.000 $28.000 $28.000
ROCK FILTER DAMS (REMOVE)
LF 3,150.000 $7.500 $10.000 $10.000 $11.000 $11.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 200.000 $35.000 $10.000 $30.000 $18.000 $20.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $90.000 $110.000 $125.000 $195.000 $95.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,240.000 $3.000 $3.000 $3.000 $1.800 $1.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,240.000 $1.000 $1.000 $1.000 $0.550 $1.260
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $90.000 $150.000 $125.000 $195.000 $122.000
CONSTRUCTING DETOURS
SY 2,416.000 $70.000 $44.000 $55.000 $60.000 $70.000
INTERSECTIONS (CONC)
SY 215.660 $108.000 $90.000 $100.000 $110.000 $100.000
INTERSECTIONS (ACP)
SY 2,134.000 $40.000 $40.000 $50.000 $50.000 $70.000
DRIVEWAYS (ACP)
SY 5,448.000 $35.000 $22.500 $28.000 $26.000 $26.000
TURNOUTS (ACP)
SY 679.000 $42.000 $32.000 $35.000 $42.000 $30.000
DRIVEWAYS (CONC) (HES)
SY 621.000 $105.000 $95.000 $95.000 $100.000 $87.010
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 44.000 $280.000 $175.000 $200.000 $190.000 $178.500
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 7.000 $266.000 $215.000 $250.000 $200.000 $194.250
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $360.000 $350.000 $400.000 $370.000 $351.750
TRAY CABLE (3 CONDR) (12 AWG)
LF 170.000 $1.700 $5.000 $5.500 $5.500 $5.250
ZINC-COAT STL WIRE STRAND (3/8")
LF 210.000 $4.500 $6.000 $7.000 $6.600 $6.300
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $750.000 $600.000 $650.000 $715.000 $682.500
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 25.000 $380.000 $400.000 $450.000 $495.000 $472.500
RELOCATE SM RD SN SUP&AM TY TWT
EA 1.000 $260.000 $305.000 $350.000 $495.000 $472.500
REMOVE SM RD SN SUP&AM
EA 30.000 $100.000 $80.000 $90.000 $110.000 $105.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 18.000 $52.000 $60.000 $65.000 $54.000 $51.450
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 13,124.000 $0.300 $0.150 $0.160 $0.170 $0.160
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,806.000 $0.750 $0.350 $0.380 $0.390 $0.370
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 1,216.000 $1.250 $2.000 $2.200 $2.200 $2.100
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,294.000 $2.600 $2.250 $2.500 $2.500 $2.360
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 1.000 $50.000 $75.000 $100.000 $82.500 $78.750
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 13,732.000 $0.200 $0.150 $0.160 $0.170 $0.160
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 82,734.000 $0.200 $0.150 $0.160 $0.170 $0.160
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 218.000 $4.000 $4.000 $4.400 $4.400 $4.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,059.000 $0.800 $1.250 $1.750 $1.250 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,680.000 $0.850 $1.250 $1.750 $1.250 $1.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 5,900.000 $0.870 $1.250 $1.750 $1.450 $1.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 10,156.000 $1.120 $1.250 $1.750 $1.450 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,791.000 $1.100 $0.880 $1.000 $0.970 $0.920
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,434.000 $2.100 $3.200 $3.500 $3.500 $3.360
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,269.000 $3.450 $5.100 $5.600 $5.600 $5.360
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 13,194.000 $0.250 $0.420 $0.460 $0.460 $0.440
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,646.000 $0.250 $0.500 $0.550 $0.550 $0.530
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,840.000 $0.250 $0.420 $0.460 $0.460 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 51,836.000 $0.250 $0.380 $0.420 $0.420 $0.400
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 40,956.000 $0.250 $0.750 $0.820 $0.820 $0.790
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 4,570.000 $0.250 $1.000 $1.100 $1.100 $1.050
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 31,436.000 $0.250 $0.750 $0.820 $0.820 $0.790
PREFAB PAV MRK TY B (W)(18")(YLD TRI)
EA 1.000 $120.000 $75.000 $100.000 $82.000 $78.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 78.000 $180.000 $180.000 $200.000 $200.000 $189.000
PREFAB PAV MRK TY C (W) (WORD)
EA 46.000 $230.000 $218.000 $340.000 $240.000 $228.900
REFL PAV MRKR TY I-C
EA 931.000 $3.500 $3.400 $3.700 $3.750 $4.000
REFL PAV MRKR TY II-A-A
EA 2,289.000 $3.500 $3.400 $3.700 $3.750 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,372.000 $0.500 $0.500 $0.550 $0.550 $0.530
ELIM EXT PAV MRK & MRKS (8")
LF 75.000 $1.100 $1.000 $1.200 $1.100 $1.050
ELIM EXT PAV MRK & MRKS (24")
LF 25.000 $2.350 $2.000 $2.200 $2.200 $2.100
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $86.000 $50.000 $80.000 $55.000 $52.500
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $145.000 $50.000 $80.000 $55.000 $52.500
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
EA 1.000 $15.000 $50.000 $80.000 $55.000 $52.500
PAV SURF PREP FOR MRK (4")
LF 1,372.000 $0.300 $0.200 $0.220 $0.220 $0.210
PAV SURF PREP FOR MRK (8")
LF 75.000 $0.420 $0.300 $0.330 $0.330 $0.320
PAV SURF PREP FOR MRK (24")
LF 25.000 $1.200 $1.000 $1.200 $1.100 $1.050
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $28.000 $20.000 $30.000 $22.000 $21.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $35.000 $20.000 $30.000 $22.000 $21.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 1.000 $18.000 $20.000 $30.000 $22.000 $21.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $280.000 $265.000 $300.000 $290.000 $278.250
VEH SIG SEC (12")LED(RED)
EA 2.000 $250.000 $265.000 $300.000 $290.000 $278.250
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 130.000 $3.250 $4.000 $4.500 $4.400 $4.200
RELOC TRF SG PL AM (S) (STRAIN POLE)
EA 1.000 $2,800.000 $1,550.000 $1,700.000 $1,700.000 $1,627.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 84.000 $100.000 $90.000 $100.000 $75.000 $120.000
TMA (STATIONARY)
EA 2.000 $10,000.000 $5,250.000 $4,000.000 $5,000.000 $1,400.000
TMA (STATIONARY)
DAY 62.000 $350.000 $1.000 $150.000 $250.000 $340.000
Totals: $7,852,366.150 $6,613,692.240 $7,159,799.970 $7,196,028.400 $7,703,044.000