GREGG IH 20 (0495-07-076)

Items: 44

County: GREGG
Length: N/A
Highway: IH 20
District: TYLER
Control Number: 0495-07-076
DBE Goal: N/A
Project: NH 2019(436)
Guaranty: N/A
Time: 50 WORKING DAYS
Engineer's Estimate: $1,774,088.17
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: TBPFC&ACP SURF,PLNG,SHLDR TXTR, PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,774,088.17
$1,878,815.37
Over/Under Est: 5.9% $104,727.20
Over/Under Est: 6.46% $114,625.86
Amt Left: 0.53% $9,898.66
Over/Under Est: 30.34% $538,242.28
Amt Left: 23.07% $433,515.08
Delta: -22.43% -$423,616.42

Bid Items & Bid Tabulations

44 Total 0 of 44
GREGG  |  IH 20  |  TYLER  |  0495-07-076  |  01/09/2019  |  $1,774,088.17  |  NH 2019(436)  |  TBPFC&ACP SURF,PLNG,SHLDR TXTR, PV M...  |  50 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EAST TEXAS BRIDGE, INC.
MADDEN CONTRACTING COMPANY, LLC.
CLARK CONSTRUCTION OF TEXAS, INC.
REMOVING CONC (CTB)
LF 30.000 $12.000 $60.000 $104.000 $114.400
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 158.000 $50.000 $25.000 $42.000 $46.200
BACKFILL (TY A)
STA 205.000 $275.000 $300.000 $380.000 $250.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 28,599.000 $1.000 $0.830 $0.770 $2.000
VEGETATIVE WATERING
MG 315.000 $3.000 $8.000 $10.000 $50.000
ASPH (AC-20-5TR)
GAL 7,810.000 $2.700 $4.000 $3.150 $4.500
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 186.000 $120.000 $150.000 $195.000 $250.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
TON 2,013.000 $115.000 $123.000 $124.000 $163.930
TBPFC (MEMBRANE)
GAL 25,994.000 $2.100 $3.250 $2.600 $2.950
TBPFC (ASPHALT)(PG 76-22)
TON 360.000 $150.000 $155.000 $155.750 $174.210
TBPFC (AGGREGATE) (SAC-A)
TON 5,639.000 $150.000 $155.000 $155.750 $174.210
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 267.000 $45.000 $65.000 $70.500 $141.690
PLANE ASPH CONC PAV(0" TO 2")
SY 4,220.000 $3.000 $2.500 $3.250 $3.750
PLANE ASPH CONC PAV (2")
SY 14,082.000 $2.000 $2.500 $3.250 $3.750
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,633.000 $4.500 $5.000 $3.250 $5.500
RIPRAP (MOW STRIP)(4 IN)
CY 66.000 $520.000 $425.000 $470.000 $517.000
MOBILIZATION
LS 1.000 $137,439.020 $100,000.000 $155,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,500.000 $7,000.000 $5,000.000 $3,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 300.000 $74.000 $70.000 $85.000 $93.500
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 300.000 $14.000 $20.000 $18.750 $20.630
PERM CTB (F-SHAPE) (TY 1)
LF 30.000 $80.000 $350.000 $500.000 $536.800
RUMBLE STRIPS (SHOULDER)
LF 54,090.000 $0.250 $0.250 $0.200 $0.130
MTL W-BEAM GD FEN (TIM POST)
LF 675.000 $20.000 $20.000 $21.000 $23.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $1,500.000 $1,375.000 $1,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,300.000 $1,300.000 $1,125.000 $1,240.000
REMOVE METAL BEAM GUARD FENCE
LF 475.000 $3.250 $2.200 $4.000 $4.500
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $330.000 $220.000 $300.000 $350.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $1,175.000 $165.000 $300.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,500.000 $2,900.000 $2,735.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $600.000 $220.000 $300.000 $350.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $10,500.000 $10,500.000 $9,000.000 $9,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,500.000 $550.000 $900.000 $950.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 12.000 $25.000 $20.000 $24.000 $27.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 25.000 $30.000 $30.000 $34.000 $37.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 136.000 $1.000 $2.000 $1.000 $3.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 3,128.000 $0.800 $2.000 $1.300 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,022.000 $0.850 $1.350 $1.200 $1.020
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 6,950.000 $0.650 $0.570 $0.520 $0.800
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 27,800.000 $0.550 $0.570 $0.520 $0.800
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 27,800.000 $0.520 $0.570 $0.520 $0.800
REFL PAV MRKR TY II-C-R
EA 450.000 $3.800 $5.500 $5.000 $5.350
MEMBRANE UNDERSEAL
GAL 3,661.000 $2.400 $5.000 $2.600 $3.300
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 108.000 $150.000 $185.000 $100.000 $250.000
TMA (STATIONARY)
EA 3.000 $8,000.000 $15,000.000 $1.000 $20,000.000
Totals: $1,774,088.170 $1,878,815.370 $1,888,714.030 $2,312,330.450