Show Job Controls
Bid Cobra

GREGG IH 20 (0495-07-075)

Items: 43

County: GREGG
Length: N/A
Highway: IH 20
District: TYLER
Control Number: 0495-07-075
DBE Goal: N/A
Project: NH 2018(516)
Guaranty: N/A
Time: 50 WORKING DAYS
Engineer's Estimate: $2,937,496.30
Date: 02/02/2018 (8 years ago)
Contract Number: N/A
Type: TBPFC & ACP SURF,PLNG,MBGF,SHLD TXT,PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,937,496.30
$2,447,523.75
Over/Under Est: -16.68% -$489,972.55
Over/Under Est: 14.35% $421,571.36
Amt Left: 37.24% $911,543.91

Bid Items & Bid Tabulations

43 Total 0 of 43
GREGG  |  IH 20  |  TYLER  |  0495-07-075  |  02/02/2018  |  $2,937,496.30  |  NH 2018(516)  |  TBPFC & ACP SURF,PLNG,MBGF,SHLD TXT,...  |  50 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
EAST TEXAS BRIDGE, INC.
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 276.000 $35.000 $25.000 $35.000
BACKFILL (TY A)
STA 217.660 $330.000 $290.000 $375.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 34,341.000 $1.050 $0.850 $0.810
VEGETATIVE WATERING
MG 378.000 $15.000 $15.000 $8.000
ASPH (AC-20-5TR)
GAL 7,475.000 $3.650 $2.200 $4.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 178.000 $110.000 $200.000 $172.000
SUPERPAVE MIXTURES SP-C PG64-22
TON 4,928.000 $110.000 $100.500 $105.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
TON 2,546.000 $125.000 $110.250 $111.000
TBPFC (MEMBRANE)
GAL 26,045.000 $2.400 $2.350 $3.000
TBPFC (ASPHALT)(PG 76-22)
TON 361.000 $145.000 $130.000 $200.000
TBPFC (AGGREGATE) (SAC-A)
TON 5,650.000 $145.000 $130.000 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,500.000 $65.000 $40.000 $60.000
PLANE ASPH CONC PAV(0" TO 2")
SY 4,243.000 $3.000 $2.500 $3.000
PLANE ASPH CONC PAV (2")
SY 16,456.000 $3.150 $2.500 $3.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 4,088.000 $2.750 $2.500 $4.000
PLANE ASPH CONC PAV (2 1/2")
SY 35,840.000 $2.000 $2.000 $3.250
RIPRAP (MOW STRIP)(4 IN)
CY 115.000 $450.000 $415.000 $400.000
MOBILIZATION
LS 1.000 $265,000.000 $155,000.000 $330,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $7,000.000 $3,000.000 $15,000.000
RUMBLE STRIPS (SHOULDER)
LF 52,948.000 $0.400 $0.150 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 1,100.000 $20.000 $19.750 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $55.000 $84.000 $70.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,835.000 $1,500.000 $1,550.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,300.000 $1,025.000 $220.000
REMOVE METAL BEAM GUARD FENCE
LF 1,062.500 $3.400 $3.000 $5.500
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $300.000 $250.000 $220.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $300.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $2,300.000 $2,280.000 $2,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $400.000 $250.000 $220.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 12.000 $28.000 $24.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 41.000 $45.000 $39.000 $25.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 202.000 $1.200 $1.250 $2.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 3,128.000 $1.400 $1.250 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,022.000 $0.850 $0.800 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,300.000 $0.450 $0.520 $0.360
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 6,950.000 $0.450 $0.650 $0.680
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 27,800.000 $0.500 $0.520 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,300.000 $0.450 $0.520 $0.360
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 27,800.000 $0.500 $0.520 $0.500
REFL PAV MRKR TY II-C-R
EA 450.000 $3.500 $3.500 $5.000
MEMBRANE UNDERSEAL
GAL 4,767.000 $2.400 $2.350 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 108.000 $110.000 $100.000 $100.000
TMA (STATIONARY)
EA 3.000 $10,000.000 $1.000 $15,000.000
Totals: $2,937,496.300 $2,447,523.750 $3,359,067.660