GRAYSON VA (0901-19-176)

Items: 43

County: GRAYSON
Length: N/A
Highway: VA
District: PARIS
Control Number: 0901-19-176
DBE Goal: N/A
Project: C 901-19-176
Guaranty: N/A
Time: 176 WORKING DAYS
Engineer's Estimate: $2,810,273.12
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
AARON BLOOM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,810,273.12
$4,478,108.30
Over/Under Est: 59.35% $1,667,835.18
$4,714,873.75
Over/Under Est: 67.77% $1,904,600.63
Amt Left: 5.29% $236,765.45
$5,064,936.44
Over/Under Est: 80.23% $2,254,663.32
Amt Left: 13.1% $586,828.14
Delta: -7.42% -$350,062.69
Subcontractor Percentage Amount
GUARDRAIL SAFETY SERVICES, LLC 1.31% $57,037.45
DIIBS SPECIALISTS, LLC 1.27% $55,295.85
STRIPING TECHNOLOGY, L.P. 0.88% $38,315.23
Total: 3.46% $150,648.53

Bid Items & Bid Tabulations

43 Total 0 of 43
GRAYSON  |  VA  |  PARIS  |  0901-19-176  |  01/05/2023  |  $2,810,273.12  |  C 901-19-176  |  PREVENT MAINT  |  176 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
JAGOE-PUBLIC COMPANY
RK HALL, LLC
PREPARING ROW
STA 4.440 $4,000.000 $50,000.000 $1,000.000 $3,570.680
REMOVING STAB BASE AND ASPH PAV (6")
SY 653.000 $5.000 $20.000 $20.000 $17.700
EXCAVATION (ROADWAY)
CY 564.980 $6.000 $20.000 $35.000 $29.500
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 224.220 $25.000 $30.000 $40.000 $29.500
BACKFILL (TY A)
STA 672.390 $4.500 $150.000 $100.000 $395.980
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 25,908.000 $0.220 $0.500 $0.250 $0.380
VEGETATIVE WATERING
MG 164.000 $20.000 $50.000 $125.000 $261.910
PROOF ROLLING
HR 9.150 $250.000 $200.000 $65.000 $177.000
FL BS (CMP IN PLC)(TY D GR 4) (6")
SY 13,509.000 $27.000 $20.000 $35.000 $31.270
REWORK BS MTL (TY B) (8") (DENS CONT)
SY 13,509.000 $3.200 $5.000 $6.000 $10.620
ASPH (AC-20-5TR OR AC-20XP)
GAL 6,221.000 $4.300 $8.000 $8.000 $12.980
AGGR (TY-B GR-3)
CY 136.000 $150.000 $500.000 $350.000 $324.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,731.000 $48.000 $85.000 $85.000 $110.630
PLANE ASPH CONC PAV(0" TO 2")
SY 134.000 $10.000 $20.000 $20.000 $67.260
RIPRAP (CONC)(5 IN)
CY 12.000 $575.000 $650.000 $1,500.000 $885.000
RIPRAP (CONC)(6 IN)
CY 12.000 $650.000 $750.000 $1,500.000 $885.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 7.400 $220.000 $185.000 $1,400.000 $354.000
MOBILIZATION
LS 1.000 $249,530.280 $400,000.000 $435,000.000 $354,545.550
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $8,000.000 $8,500.000 $10,000.000 $21,406.720
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,196.000 $7.000 $18.000 $7.000 $7.080
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,196.000 $2.200 $9.000 $1.000 $1.180
CONC CURB & GUTTER (TY II)
LF 129.000 $42.000 $55.000 $85.000 $76.700
MTL W-BEAM GD FEN (STEEL POST)
LF 3,542.500 $33.000 $35.000 $35.000 $33.630
REMOVE METAL BEAM GUARD FENCE
LF 4,573.000 $2.500 $3.000 $1.250 $2.360
REMOVE TERMINAL ANCHOR SECTION
EA 24.000 $230.000 $1,000.000 $250.000 $177.000
GUARDRAIL END TREATMENT (INSTALL)
EA 24.000 $3,250.000 $3,800.000 $3,500.000 $3,363.000
IN SM RD SN SUP&AM TYTWT(1)UB(P)
EA 2.000 $550.000 $850.000 $1,000.000 $1,770.000
REMOVE SM RD SN SUP&AM
EA 2.000 $85.000 $250.000 $500.000 $177.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 59.000 $25.000 $100.000 $25.000 $47.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,038.000 $1.850 $5.000 $5.000 $3.170
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 184.500 $4.000 $20.000 $5.250 $5.900
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 3.000 $130.000 $250.000 $275.000 $295.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 4,978.000 $0.600 $1.000 $3.250 $3.540
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 144.000 $2.000 $3.000 $2.250 $2.360
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 20,704.000 $0.400 $1.000 $1.100 $1.180
D-GR HMA TY-D SAC-A PG64-22
TON 15,527.000 $97.000 $150.000 $175.000 $167.360
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 211.000 $105.000 $130.000 $175.000 $204.490
BONDING COURSE
GAL 7,068.510 $4.400 $10.000 $1.250 $9.720
PRECAST CONCRETE WHEEL STOPS
EA 237.000 $115.000 $500.000 $175.000 $213.160
MOVE AND RESTE PRECAST CONC WHEEL STOPS
EA 238.000 $65.000 $250.000 $125.000 $226.300
PREFB PAV MK TY C (ACC PARK)
EA 3.000 $475.000 $500.000 $275.000 $354.000
TMA (STATIONARY)
DAY 124.000 $150.000 $250.000 $350.000 $526.410
TMA (MOBILE OPERATION)
HR 160.000 $30.000 $65.000 $75.000 $114.030
Totals: $2,810,273.119 $4,478,108.300 $4,714,873.762 $5,064,936.464