GRAYSON SH 160 (0410-02-038)

Items: 59

County: GRAYSON
Length: N/A
Highway: SH 160
District: PARIS
Control Number: 0410-02-038
DBE Goal: N/A
Project: F 2022(948)
Guaranty: N/A
Time: 147 WORKING DAYS
Engineer's Estimate: $10,196,403.88
Date: 12/02/2022 (3 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
AARON BLOOM
COLBY SHELTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$10,196,403.88
1
$7,831,624.15
Over/Under Est: -23.19% -$2,364,779.73
Over/Under Est: -6.71% -$684,502.08
Amt Left: 21.46% $1,680,277.65

Bid Items & Bid Tabulations

59 Total 0 of 59
GRAYSON  |  SH 160  |  PARIS  |  0410-02-038  |  12/02/2022  |  $10,196,403.88  |  F 2022(948)  |  PREVENT MAINT  |  147 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 200.000 $400.000 $488.250 $1,000.000
EXCAVATION (ROADWAY)
CY 100.000 $35.000 $36.460 $33.740
BACKFILL (TY B)
STA 837.000 $190.000 $128.940 $102.720
ROAD GRADER WORK (ORD COMP)
STA 9.000 $350.000 $272.940 $319.250
BROADCAST SEED (TEMP) (WARM)
SY 93,076.000 $0.350 $0.110 $0.100
BROADCAST SEED (TEMP) (COOL)
SY 93,076.000 $0.350 $0.120 $0.110
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 186,149.000 $1.250 $0.400 $0.380
VEGETATIVE WATERING
MG 559.000 $40.000 $40.950 $114.000
FL BS (CMP IN PLC)(RAP) (6")
SY 400.000 $25.000 $14.750 $2.810
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,019.000 $85.000 $66.790 $121.110
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 411,696.000 $1.950 $2.080 $1.500
CUT & RESTORING PAV
SY 25.000 $120.000 $157.500 $200.000
FLOWABLE BACKFILL
CY 30.000 $295.000 $231.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 102.000 $10.000 $52.500 $10.000
TEMPORARY SPL SHORING
SF 50.000 $300.000 $210.000 $50.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 154.000 $200.000 $152.250 $145.000
RIPRAP (MOW STRIP)(4 IN)
CY 254.600 $415.000 $540.750 $515.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 225.000 $50.000 $51.450 $49.000
RC PIPE (CL III)(30 IN)
LF 78.000 $125.000 $110.250 $105.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $1,395.000 $1,338.750 $1,275.000
REMOV & RE - LAY PIPE (48 IN)
LF 18.000 $110.000 $183.750 $175.000
REMOV STR (PIPE)
EA 1.000 $275.000 $498.750 $475.000
MOBILIZATION
LS 1.000 $950,917.380 $234,948.720 $951,190.180
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $4,000.000 $21,672.130 $50,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 148.000 $6.000 $5.250 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 148.000 $3.000 $1.580 $1.500
DRIVEWAYS (CONC)
SY 611.000 $120.000 $120.750 $124.570
DRIVEWAYS (ACP)
SY 2,482.000 $50.000 $37.210 $54.690
RUMBLE STRIPS (SHOULDER)
LF 165,665.000 $0.180 $0.120 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 83,155.000 $0.180 $0.120 $0.100
MTL W-BEAM GD FEN (STEEL POST)
LF 2,950.000 $35.000 $28.090 $25.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $2,300.000 $2,834.710 $2,100.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 16.000 $1,050.000 $1,023.750 $875.000
REMOVE METAL BEAM GUARD FENCE
LF 1,800.000 $2.900 $2.100 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $220.000 $262.500 $185.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,200.000 $3,097.500 $2,775.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 6.000 $55.000 $78.750 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 90.000 $30.000 $23.100 $20.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 14,730.000 $0.240 $0.210 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 87,476.000 $0.280 $0.170 $0.160
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,721.000 $1.700 $1.730 $0.650
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,758.000 $2.000 $1.050 $1.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 591.000 $5.900 $7.880 $7.500
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 8.000 $130.000 $136.500 $130.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 8.000 $160.000 $210.000 $200.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 18.000 $55.000 $52.500 $50.000
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 242.000 $5.500 $8.930 $8.500
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 150.000 $2.000 $1.050 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 170,618.000 $0.400 $0.470 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 14,730.000 $0.370 $0.490 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 87,476.000 $0.370 $0.470 $0.450
REFL PAV MRKR TY I-C
EA 171.000 $3.500 $5.250 $5.000
REFL PAV MRKR TY II-A-A
EA 1,918.000 $3.500 $4.200 $4.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 7,032.000 $115.000 $97.000 $148.000
SP MIXES SP-C PG64-22
TON 45,288.000 $130.000 $96.850 $107.500
BONDING COURSE
GAL 20,507.000 $4.750 $5.980 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $13,504.750 $6,300.000
TMA (STATIONARY)
DAY 30.000 $225.000 $425.900 $292.400
TMA (MOBILE OPERATION)
DAY 30.000 $150.000 $967.240 $20.000
Totals: $10,196,403.880 $7,831,624.150 $9,511,901.800