GRAYSON US 377 (0081-07-028)

Items: 129

County: GRAYSON
Length: 1.4960 MILES
Highway: US 377
District: PARIS
Control Number: 0081-07-028
DBE Goal: 3.0%
Project: F 2025(150)
Guaranty: $100,000.00
Time: 198 WORKING DAYS
Engineer's Estimate: $10,545,460.17
Date: 03/04/2025 (1 year ago)
Contract Number: 3253034
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184722
Contract Type: Federal
Project Description: ADD LTL
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
AARON BLOOM
MELESE NORCHA
DARIUS SAMUELS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$10,545,460.17
$6,968,770.85
Over/Under Est: -33.92% -$3,576,689.32
Over/Under Est: -26.24% -$2,766,613.43
Amt Left: 11.62% $810,075.89
Over/Under Est: 7.13% $752,089.83
Amt Left: 62.12% $4,328,779.15
Delta: -45.23% -$3,518,703.26
Subcontractor Percentage Amount
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION 5.34% $372,132.36
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 3.85% $268,297.68
DUSTROL, INC. 1.82% $126,831.63
J. H. ODEN CONTRACTING COMPANY 1.50% $104,531.56
TRP CONSTRUCTION GROUP, LLC 0.61% $42,509.50
MARCOMS CONSTRUCTION LLC 0.51% $35,540.73
DIIBS SPECIALISTS, LLC 0.35% $24,390.70
BARRICADES UNLIMITED 0.25% $17,421.93
Total: 14.23% $991,656.09

Bid Items & Bid Tabulations

129 Total 0 of 129
GRAYSON  |  US 377  |  PARIS  |  0081-07-028  |  03/04/2025  |  $10,545,460.17  |  F 2025(150)  |  HAZARD ELIM & SAFETY  |  198 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
ED BELL CONSTRUCTION COMPANY
GREY SKY CONSTRUCTION LLC
PREPARING ROW
STA 81.000 $7,616.670 $100.000 $4,260.000 $9,450.000
REMOV CONC (DRIVEWAYS)
SY 728.000 $27.150 $22.000 $40.000 $30.000
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
SY 2,492.000 $53.700 $9.000 $10.000 $30.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 6,905.000 $89.500 $4.250 $10.000 $30.000
EXCAV (ROADWAY)
CY 21,612.000 $31.540 $20.000 $30.000 $30.000
EMBANK (FNL)(OC)(TY B)
CY 7,581.000 $38.770 $3.500 $20.000 $50.000
BLOCK SODDING
SY 58,681.000 $6.000 $4.000 $3.750 $10.000
BROADCAST SEED (TEMP_COOL)
SY 29,341.000 $2.690 $0.150 $0.160 $1.000
VEGETATIVE WATERING
TGL 1,399.000 $76.990 $60.000 $20.000 $20.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 367.000 $387.480 $325.000 $500.000 $400.000
LIME TRT (EXIST MATL)(6")
SY 22,655.000 $12.500 $9.000 $15.000 $10.000
D-GR HMA TY-B PG64-22
TON 9,434.000 $135.270 $115.000 $113.400 $180.000
D-GR HMA TY-D PG64-22
TON 2,049.000 $280.000 $120.000 $115.500 $220.000
SP MIXES SP-C PG64-22
TON 8,440.000 $230.000 $125.000 $118.150 $220.000
TACK COAT
GAL 4,630.000 $5.400 $5.000 $5.000 $10.000
PLANE ASPH CONC PAV(1")
SY 31,568.000 $9.130 $1.500 $2.000 $10.000
STRUCT EXCAV
CY 926.000 $34.330 $38.000 $15.000 $100.000
CEM STABIL BKFL
CY 585.000 $234.950 $250.000 $300.000 $85.000
TEMPORARY SPL SHORING
SF 1,505.000 $40.000 $10.000 $85.000 $85.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 48.000 $585.000 $500.000 $424.000 $500.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $428.880 $525.000 $450.500 $650.000
RIPRAP (CONC)(5 IN)
CY 14.000 $1,000.000 $600.000 $1,000.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 33.000 $719.030 $1,000.000 $900.000 $550.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 201.000 $225.000 $500.000 $250.000 $250.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 12.000 $923.530 $600.000 $1,200.000 $1,000.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 12.000 $1,350.000 $700.000 $1,400.000 $1,000.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 37.000 $1,569.750 $1,300.000 $1,600.000 $1,500.000
RC PIPE (CL III)(24 IN)
LF 1,072.000 $108.430 $110.000 $90.000 $100.000
RC PIPE (CL III)(30 IN)
LF 72.000 $180.000 $175.000 $120.000 $2,000.000
WINGWALL (FW - S) (HW=6 FT)
EA 2.000 $20,000.000 $17,000.000 $20,000.000 $25,000.000
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C)
EA 1.000 $10,000.000 $16,000.000 $20,000.000 $15,000.000
SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $15,890.100 $21,000.000 $29,000.000 $16,500.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $17,000.000 $12,000.000 $15,000.000 $18,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 44.000 $1,415.250 $2,400.000 $1,700.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $3,650.000 $4,500.000 $5,100.000 $3,500.000
CLEAN EXIST CULVERTS
EA 3.000 $2,000.000 $2,300.000 $5,250.000 $1,500.000
REMOV STR (SET)
EA 42.000 $378.240 $39.000 $250.000 $500.000
REMOV STR (WINGWALL)
EA 6.000 $1,000.000 $2,300.000 $5,000.000 $2,500.000
REMOV STR (PIPE)
LF 945.000 $27.500 $23.000 $20.000 $50.000
REMOV STR (BOX CULVERT)
LF 8.000 $82.790 $800.000 $800.000 $150.000
MOBILIZATION
LS 1.000 $705,648.870 $767,000.000 $800,000.000 $765,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $14,000.000 $40,000.000 $42,000.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,282.610 $15,000.000 $9,500.000 $20,000.000
TMA (STATIONARY)
DAY 360.000 $125.850 $180.000 $105.000 $250.000
TMA (MOBILE OPERATION)
DAY 30.000 $600.000 $200.000 $1,200.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,030.000 $125.000 $70.000 $48.760 $40.000
ROCK FILTER DAMS (REMOVE)
LF 1,030.000 $35.000 $15.000 $22.260 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 472.000 $49.980 $25.000 $39.490 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 472.000 $14.410 $10.000 $11.660 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,860.000 $5.890 $6.000 $3.710 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,860.000 $1.460 $1.000 $1.330 $2.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,320.000 $65.960 $32.000 $36.000 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $67.200 $30.000 $100.000 $100.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,260.000 $16.000 $28.000 $12.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 20.000 $16.910 $10.000 $60.000 $20.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,320.000 $18.520 $25.000 $18.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $19.740 $5.000 $75.000 $20.000
PORT CTB(FUR & INSTL)(F-SHAPE)(TY T)
LF 20.000 $100.000 $32.000 $250.000 $100.000
PORT CTB(MOVE)(F-SHAPE)(TY T)
LF 10.000 $50.000 $10.000 $125.000 $20.000
PORT CTB(REMOVE)(F-SHAPE)(TY T)
LF 20.000 $50.000 $5.000 $150.000 $20.000
DRIVEWAYS (CONC)
SY 593.000 $130.310 $140.000 $150.000 $100.000
DRIVEWAYS (ACP)
SY 1,177.000 $104.870 $90.000 $93.000 $45.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 4,200.000 $4.610 $2.500 $2.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $29.150 $28.000 $26.240 $30.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,376.010 $3,500.000 $3,253.140 $3,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $2,150.000 $2,500.000 $2,000.000 $8,500.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $537.500 $1,500.000 $1,000.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $9,191.250 $15,000.000 $9,000.000 $21,500.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 4.000 $252.670 $300.000 $300.000 $1,500.000
CONDT (PVC) (SCH 40) (3")
LF 100.000 $34.680 $30.000 $24.380 $40.000
CONDT (PVC) (SCH 40) (4")
LF 220.000 $26.740 $32.000 $26.500 $60.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 165.000 $56.020 $50.000 $40.280 $80.000
CONDT (PVC) (SCH 80) (2")
LF 235.000 $19.260 $27.000 $22.260 $30.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 60.000 $25.710 $40.000 $33.920 $60.000
ELEC CONDR (NO.6) BARE
LF 485.000 $5.520 $4.500 $3.710 $3.000
ELEC CONDR (NO.6) INSULATED
LF 30.000 $7.260 $5.250 $4.240 $3.000
TRAY CABLE (3 CONDR) (12 AWG)
LF 1,800.000 $3.300 $4.000 $3.180 $3.000
GROUND BOX TY D (162922)
EA 2.000 $2,297.070 $1,700.000 $1,431.000 $1,500.000
GROUND BOX TY D (162922)W/APRON
EA 8.000 $1,733.260 $2,000.000 $1,590.000 $1,500.000
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 2.000 $7,750.000 $8,500.000 $6,996.000 $12,500.000
ALUMINUM SIGNS (TY A)
SF 81.000 $53.050 $41.000 $38.160 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $808.240 $750.000 $715.500 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $831.000 $850.000 $832.100 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $1,776.350 $950.000 $927.500 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 7.000 $782.600 $1,100.000 $1,054.700 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,000.000 $1,100.000 $1,033.500 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $1,112.470 $1,200.000 $1,139.500 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,100.000 $1,300.000 $1,266.700 $1,500.000
REMOVE SM RD SN SUP&AM
EA 44.000 $110.280 $90.000 $83.740 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $45.130 $28.000 $26.500 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 8.000 $100.000 $80.000 $79.500 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 800.000 $2.000 $5.000 $6.000 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 400.000 $1.500 $5.000 $6.150 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 650.000 $2.540 $1.750 $2.120 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 270.000 $11.420 $10.000 $8.480 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 41.000 $228.280 $210.000 $148.400 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $256.820 $310.000 $190.800 $250.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 630.000 $13.260 $9.000 $8.480 $20.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 15,115.000 $5.730 $0.800 $0.950 $1.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 2,475.000 $0.990 $1.250 $1.060 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 18,304.000 $3.150 $0.800 $0.950 $1.000
REFL PAV MRKR TY I-C
EA 34.000 $7.180 $8.000 $6.360 $6.000
REFL PAV MRKR TY II-A-A
EA 408.000 $8.360 $8.000 $5.300 $6.000
INSTALL HWY TRF SIG (ISOLATED)
EA 2.000 $41,252.490 $20,000.000 $15,900.000 $55,000.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $386.640 $500.000 $397.500 $325.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $386.460 $500.000 $397.500 $325.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $387.040 $500.000 $397.500 $325.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $342.890 $500.000 $397.500 $325.000
VEH SIG SEC (12")LED(RED)
EA 12.000 $386.640 $500.000 $397.500 $325.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $342.890 $500.000 $397.500 $325.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 12.000 $199.550 $300.000 $233.200 $250.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 2.000 $257.170 $275.000 $222.600 $350.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 486.000 $3.630 $5.000 $4.240 $3.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 112.000 $4.970 $6.500 $5.300 $3.000
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 660.000 $3.900 $8.000 $6.360 $3.000
INS TRF SIG PL AM(S)1 ARM(24')LUM&ILSN
EA 1.000 $17,131.000 $15,000.000 $13,462.000 $35,000.000
INS TRF SIG PL AM(S)1 ARM(28')LUM&ILSN
EA 1.000 $13,840.000 $15,500.000 $13,780.000 $38,500.000
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
EA 2.000 $19,937.250 $16,000.000 $14,098.000 $40,000.000
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
EA 1.000 $15,399.660 $17,000.000 $15,370.000 $45,000.000
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
EA 1.000 $17,264.114 $17,500.000 $15,900.000 $50,000.000
ITS COM CBL (ETHERNET)
LF 115.000 $4.000 $4.500 $3.710 $10.000
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 2.000 $10,000.000 $10,000.000 $8,480.000 $12,500.000
ITS RADIO (DUAL) (5 GHZ/5 GHZ)-I-U
EA 2.000 $3,500.000 $4,500.000 $3,710.000 $6,500.000
VDS PROSR SYS
EA 2.000 $35,000.000 $35,000.000 $27,878.000 $30,000.000
HVDS W/VAR LNS
EA 2.000 $8,000.000 $22,000.000 $19,080.000 $30,000.000
VDS CNTRL SOFTWARE
EA 2.000 $2,000.000 $250.000 $212.000 $8,500.000
VDS ATSPM
EA 2.000 $4,000.000 $3,000.000 $2,650.000 $60,000.000
VDS CABLING
LF 903.000 $5.000 $5.000 $4.240 $3.000
VDS RECORDING
EA 2.000 $900.000 $260.000 $212.000 $65,000.000
Totals: $10,545,460.174 $6,968,770.850 $7,778,846.740 $11,297,550.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $70,564.89
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $141,129.77
Total: $211,694.66