Show Job Controls
Bid Cobra

GRAYSON US 75 (0047-18-088)

Items: 331

County: GRAYSON
Length: 1.6900 MILES
Highway: US 75
District: PARIS
Control Number: 0047-18-088
DBE Goal: 0.0%
Project: C 47-18-88
Guaranty: $100,000.00
Time: 0 X
Engineer's Estimate: $134,037,797.92
Date: 10/01/2024 (1 year ago)
Contract Number: 10243031
Type: WIDEN ROAD - ADD LANES
Project ID: A00122735
Project Description: WIDENING FROM 4-LN TO 6-LN
Mail/Deliver Bids To: N/A
AARON BLOOM
MELESE NORCHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$134,037,797.92
$151,581,089.26
Over/Under Est: 13.09% $17,543,291.34
$152,539,698.95
Over/Under Est: 13.8% $18,501,901.03
Amt Left: 0.63% $958,609.69
$155,148,688.98
Over/Under Est: 15.75% $21,110,891.06
Amt Left: 2.35% $3,567,599.72
Delta: -1.71% -$2,608,990.03
Over/Under Est: 37.85% $50,730,303.01
Amt Left: 21.89% $33,187,011.67
Delta: -19.09% -$29,619,411.95
Subcontractor Percentage Amount
NORTH TEXAS CONTRACTING, INC. 6.80% $9,895,822.57
OVERLAND CORPORATION 5.29% $7,698,367.85
MICA CORPORATION 4.45% $6,475,942.71
OSCAR ORDUNO, INC. 3.18% $4,627,752.32
WYLIE DRILLING & DRAINAGE, INC. 2.14% $3,114,273.57
DURABLE SPECIALTIES, INC. 1.30% $1,891,848.43
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.76% $1,106,003.70
HERMANOS STEEL, LLC 0.72% $1,047,792.98
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.63% $916,818.86
JB PINNACLE GROUP, LLC 0.55% $800,397.41
ACT SAW CUTTING & REMOVAL 0.32% $465,685.77
FORTSON CONTRACTING, INC. 0.21% $305,606.29
SCOTT DERR PAINTING CO, LLC 0.16% $232,842.88
TEXOP CONSTRUCTION 0.14% $203,737.52
FC TRAFFIC CONTROL, INC. 0.08% $116,421.44
SOUTHEAST GRINDING AND GROOVING LLC 0.05% $72,763.40
BREDA COMPANY, INC. 0.02% $29,105.36
IMT CONSTRUCTION, LLC 0.00% $0.00
TEXAS AUGER BORING LLC 0.00% $0.00
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
HDW CONSTRUCTION & DRILLING, LLC. 0.00% $0.00
Total: 26.80% $39,001,183.06

Bid Items & Bid Tabulations

331 Total 0 of 331
GRAYSON  |  US 75  |  PARIS  |  0047-18-088  |  10/01/2024  |  $134,037,797.92  |  C 47-18-88  |  WIDEN ROAD - ADD LANES  |  0 X
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
INDUS ROAD & BRIDGE, INC.
RPM XCONSTRUCTION, LLC
WEBBER, LLC
ZACHRY CONSTRUCTION CORPORATION
PREPARING ROW
STA 102.850 $15,000.000 $84,600.000 $18,000.000 $144,868.000 $170,000.000
REMOVING CONC (PAV)
SY 148,923.000 $5.000 $10.000 $7.000 $8.550 $12.760
REMOVING CONC (RIPRAP)
SY 3,990.000 $8.000 $15.000 $7.000 $11.800 $7.890
REMOVING CONC (RIPRAP)
CY 109.000 $100.000 $111.000 $57.000 $108.000 $94.520
REMOVING CONC (SIDEWALKS)
SY 352.000 $12.000 $15.000 $14.000 $33.500 $10.930
REMOVING CONC (DRIVEWAYS)
SY 6,725.000 $12.000 $19.000 $7.600 $14.500 $10.210
REMOVING CONC (CURB AND GUTTER)
LF 1,111.000 $20.000 $11.000 $6.400 $22.900 $6.310
REMOVING CONC (CTB)
LF 1,210.000 $15.000 $26.000 $28.000 $17.600 $20.480
REMOVING CONC (COPING)
LF 135.000 $100.000 $57.000 $18.000 $39.250 $33.040
REMOVING CONC (FLUME)
SY 430.000 $35.000 $22.000 $29.000 $20.890 $36.930
REMOVING CONCRETE(MOW STRIP)
LF 2,400.000 $4.000 $8.000 $5.700 $15.500 $6.210
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 27,383.000 $6.000 $8.000 $10.000 $8.890 $13.160
EXCAVATION (ROADWAY)
CY 275,936.000 $10.000 $12.000 $11.000 $16.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 284,661.000 $10.000 $11.000 $14.000 $9.450 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 821.000 $10.000 $67.000 $17.000 $5.100 $6.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 41,538.000 $14.000 $24.000 $29.500 $39.000 $50.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 25,014.000 $30.000 $19.000 $63.000 $89.500 $65.000
FURNISHING AND PLACING TOPSOIL (4")
SY 248,073.000 $2.000 $1.320 $1.600 $1.660 $2.630
BLOCK SODDING
SY 248,073.000 $3.500 $3.600 $3.700 $3.600 $4.130
BROADCAST SEED (TEMP) (WARM)
SY 31,050.000 $0.150 $0.140 $0.140 $0.150 $0.160
BROADCAST SEED (TEMP) (COOL)
SY 31,050.000 $0.150 $0.170 $0.180 $0.200 $0.200
FERTILIZER
AC 51.200 $1,600.000 $596.000 $615.000 $300.000 $685.520
VEGETATIVE WATERING
MG 930.520 $35.000 $32.000 $56.000 $35.000 $40.000
PROOF ROLLING
HR 100.000 $150.000 $170.000 $237.000 $166.000 $284.950
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 2,684.000 $60.000 $57.000 $74.000 $79.250 $103.840
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 135,427.000 $20.000 $16.000 $20.000 $11.000 $27.370
CEMENT
TON 1,475.000 $260.000 $250.000 $450.000 $275.000 $258.770
CEMENT TREAT (NEW BASE) (6")
SY 135,427.000 $6.300 $3.500 $2.000 $5.000 $4.000
PRIME COAT (MC-30)
GAL 43,919.000 $8.000 $8.500 $5.900 $6.000 $6.860
CONC PVMT (CONT REINF - CRCP) (9")
SY 83,972.000 $74.000 $78.000 $89.000 $77.000 $98.330
CONC PVMT (CONT REINF - CRCP) (13")
SY 128,471.000 $88.000 $100.000 $110.000 $97.000 $118.030
FULL - DEPTH REPAIR CRCP (10")
SY 7,200.000 $200.000 $437.000 $250.000 $350.000 $197.790
STRUCT EXCAV
CY 5,274.000 $35.000 $16.000 $16.000 $30.750 $21.800
CEM STABIL BKFL
CY 23,311.000 $160.000 $177.000 $203.000 $86.500 $220.520
FLOWABLE BACKFILL
CY 2,349.000 $320.000 $303.000 $330.000 $235.000 $261.110
TRENCH EXCAVATION PROTECTION
LF 12,735.000 $10.000 $2.200 $4.150 $11.000 $12.540
TEMPORARY SPL SHORING
SF 138,111.000 $45.000 $41.000 $38.000 $35.250 $45.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 3.000 $4,500.000 $25,000.000 $26,620.000 $23,920.000 $29,347.020
SOIL NAIL ANCHORS
LF 32,576.000 $35.000 $37.000 $35.000 $18.500 $32.220
DRILL SHAFT (18 IN)
LF 655.000 $160.000 $122.000 $105.500 $136.000 $122.890
DRILL SHAFT (24 IN)
LF 18.000 $240.000 $700.000 $290.000 $725.000 $817.110
DRILL SHAFT (36 IN)
LF 10,926.000 $260.000 $225.000 $250.000 $184.000 $245.630
DRILL SHAFT (48 IN)
LF 21.000 $580.000 $395.000 $618.000 $650.000 $730.800
DRILL SHAFT (84 IN)
LF 997.000 $1,325.000 $1,250.000 $1,300.000 $1,030.000 $1,447.480
DRILL SHAFT (SIGN MTS) (24 IN)
LF 16.000 $240.000 $325.000 $210.000 $185.000 $217.170
DRILL SHAFT (SIGN MTS) (48 IN)
LF 50.000 $650.000 $605.000 $670.000 $595.000 $698.470
DRILL SHAFT (SIGN MTS) (54 IN)
LF 285.000 $760.000 $630.000 $990.000 $879.000 $1,031.850
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 396.000 $850.000 $690.000 $1,150.000 $977.000 $1,146.880
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 30.000 $300.000 $325.000 $345.000 $295.000 $346.290
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 36.000 $380.000 $800.000 $467.000 $399.000 $468.380
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 84.000 $470.000 $980.000 $550.000 $458.000 $537.640
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $600.000 $1,300.000 $800.000 $679.000 $797.070
CL A CONC (PLUG)
EA 24.000 $1,120.000 $300.000 $300.000 $3,040.000 $2,279.630
CL C CONC (ABUT)
CY 581.600 $1,600.000 $875.000 $1,394.000 $1,580.000 $1,400.340
CL C CONC (CAP)
CY 669.200 $1,575.000 $1,200.000 $1,585.000 $1,820.000 $2,178.890
CL C CONC (COLUMN)
CY 702.600 $1,300.000 $1,000.000 $1,360.000 $1,110.000 $1,501.150
CL C CONC (COLUMN)(MASS)
CY 341.100 $1,400.000 $1,450.000 $1,649.000 $1,400.000 $1,979.200
CL C CONC (CULV)
CY 10.000 $1,285.000 $1,700.000 $8,150.000 $5,210.000 $1,438.580
CL C CONC (RAIL FOUNDATION)
CY 633.695 $650.000 $560.000 $740.000 $694.000 $1,200.000
CL C CONC (COLLAR)
EA 4.000 $2,310.000 $3,400.000 $3,505.000 $3,370.000 $17,205.790
CL C CONC (CAP)(INVT)(MASS)
CY 564.500 $1,400.000 $1,100.000 $1,707.000 $1,450.000 $2,082.760
CL F CONC (CAP)(INVT)(MASS)
CY 278.700 $1,550.000 $1,500.000 $1,707.000 $1,900.000 $4,423.440
REINF CONC SLAB
SF 226,721.000 $28.000 $20.000 $30.000 $28.500 $34.850
APPROACH SLAB
CY 940.600 $800.000 $932.000 $1,220.000 $804.000 $1,200.000
RETAINING WALL (MSE)
SF 74,651.000 $80.000 $86.000 $86.000 $75.000 $100.000
RETAINING WALL (SOIL NAIL)(FACIA)
SF 16,454.000 $80.000 $87.000 $112.000 $90.000 $80.000
PRESTR CONC GIRDER (TX40)
LF 8,398.980 $195.000 $215.000 $226.000 $198.000 $245.100
PRESTR CONC GIRDER (TX54)
LF 23,435.660 $225.000 $215.000 $241.000 $191.000 $275.000
SILICONE RESIN PAINT FINISH
SF 25,112.000 $3.420 $11.000 $4.200 $15.300 $7.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 600.000 $165.000 $45.000 $216.000 $130.000 $318.290
RIPRAP (CONC)(4 IN)
CY 1,315.086 $550.000 $490.000 $584.000 $801.000 $752.470
RIPRAP (CONC)(CL C)
CY 109.000 $760.000 $620.000 $1,854.000 $849.000 $953.670
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 1,246.000 $650.000 $565.000 $745.000 $709.000 $623.840
RIPRAP (CONC) (CL B) (4")
CY 1.050 $1,500.000 $1,100.000 $920.000 $455.000 $1,864.970
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 903.000 $250.000 $220.000 $215.000 $377.500 $159.460
RIPRAP (MOW STRIP)(4 IN)
CY 651.336 $550.000 $575.000 $748.000 $915.000 $978.960
STR STEEL (MISC NON - BRIDGE)
LB 439.000 $20.000 $25.000 $18.000 $37.750 $35.990
RAIL (TY T411)
LF 728.000 $250.000 $228.000 $308.000 $765.000 $305.900
RAIL (TY SSTR)
LF 5,640.500 $65.000 $95.000 $100.000 $68.000 $66.000
RAIL (TY C411)
LF 722.300 $220.000 $270.000 $343.000 $805.000 $294.650
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,314.000 $80.000 $100.000 $129.000 $60.250 $76.520
RAIL (TY T80PP)
LF 2,071.000 $150.000 $230.000 $174.000 $215.000 $148.510
RAIL (TY T80PP-TS)
LF 565.000 $360.000 $400.000 $787.000 $368.000 $450.460
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,775.000 $210.000 $250.000 $253.000 $305.000 $300.660
CONC BOX CULV (7 FT X 5 FT)
LF 354.000 $995.000 $1,120.000 $1,050.000 $756.000 $637.310
CONC BOX CULV (7 FT X 6 FT)
LF 1,594.000 $1,000.000 $1,200.000 $1,100.000 $925.000 $694.600
RC PIPE (CL IV)(30 IN)
LF 144.000 $165.000 $230.000 $220.000 $154.000 $157.780
RC PIPE (CL IV)(36 IN)
LF 1,042.000 $305.000 $265.000 $265.000 $200.000 $192.240
RC PIPE (ARCH)(CL IV)(DES 3)
LF 113.000 $420.000 $340.000 $340.000 $324.000 $403.760
MANH (COMPL)(PRM)(48IN)
EA 17.000 $7,000.000 $9,000.000 $8,800.000 $10,175.000 $6,404.330
MANH (COMPL)(PRM)(72IN)
EA 1.000 $14,000.000 $16,000.000 $15,800.000 $14,650.000 $8,249.410
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 2.000 $24,000.000 $30,000.000 $29,200.000 $18,660.000 $17,400.550
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 10.000 $8,500.000 $10,000.000 $9,950.000 $10,470.000 $8,509.540
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 5.000 $7,900.000 $10,000.000 $9,950.000 $9,780.000 $8,807.840
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 18.000 $8,600.000 $12,000.000 $11,100.000 $10,080.000 $7,907.360
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 1.000 $9,400.000 $12,000.000 $11,100.000 $10,250.000 $9,034.380
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 3.000 $10,100.000 $13,000.000 $12,300.000 $10,440.000 $8,623.270
INLET (COMPL)(POD)(FG)(4FTX4FT)
EA 8.000 $17,000.000 $9,200.000 $8,800.000 $10,675.000 $11,899.580
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 73.000 $6,500.000 $6,500.000 $5,850.000 $9,450.000 $9,434.530
INLET (COMPL)(TY MSE2)
EA 11.000 $16,000.000 $16,500.000 $4,100.000 $20,125.000 $11,828.410
INLET (COMPL)(CURB)(TY 2)(20')
EA 33.000 $20,000.000 $45,000.000 $32,000.000 $31,650.000 $34,621.740
JCT BOX (COMPL)(SPL)
EA 2.000 $100,000.000 $190,000.000 $115,000.000 $155,000.000 $127,855.540
MANH (COMPL)(RISER ONLY)
EA 2.000 $8,000.000 $12,000.000 $7,400.000 $17,250.000 $7,940.960
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $50,000.000 $100,000.000 $65,000.000 $225,000.000 $70,088.850
WINGWALL (PW - 2) (HW=12 FT)
EA 1.000 $55,000.000 $140,000.000 $104,000.000 $300,000.000 $112,325.540
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 2.000 $2,000.000 $1,700.000 $1,755.000 $2,370.000 $2,539.370
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,100.000 $2,400.000 $2,400.000 $2,660.000 $2,815.580
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 3.000 $2,300.000 $2,400.000 $2,400.000 $2,660.000 $2,815.580
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $2,300.000 $2,900.000 $3,000.000 $2,960.000 $3,068.770
GRATE AND FRAME (BRIDGE DRAIN)
EA 9.000 $3,100.000 $2,200.000 $3,593.000 $6,675.000 $2,280.830
JACK BOR OR TUN PIPE(36 IN)(RC)(CL IV)
LF 264.000 $1,300.000 $1,150.000 $1,275.000 $1,500.000 $1,625.440
JACK BOR OR TUN PIPE(42 IN)(RC)(CL V)
LF 275.000 $1,500.000 $1,400.000 $1,600.000 $1,400.000 $1,473.000
ADJUSTING MANHOLES
EA 1.000 $1,504.800 $5,600.000 $6,000.000 $4,240.000 $6,558.730
ADJUSTING INLETS
EA 2.000 $3,000.000 $5,600.000 $6,000.000 $4,240.000 $6,558.700
ADJUSTING INLET (CAP)
EA 13.000 $4,000.000 $5,600.000 $6,000.000 $4,240.000 $6,718.550
ADJUSTING MANHOLES(CAP)
EA 1.000 $5,000.000 $5,600.000 $6,000.000 $4,240.000 $5,450.500
PIPE (PVC) (SCH 40) (6 IN)
LF 215.000 $140.000 $145.000 $167.000 $180.000 $283.690
REMOV STR (INLET)
EA 47.000 $1,100.000 $2,400.000 $2,350.000 $2,160.000 $2,127.750
REMOV STR (WINGWALL)
EA 1.000 $1,600.000 $8,500.000 $2,896.000 $7,140.000 $4,513.380
REMOV STR (PIPE)
LF 5,207.000 $21.000 $60.000 $46.700 $36.750 $18.370
REMOV STR (BOX CULVERT)
LF 504.000 $80.000 $270.000 $88.000 $88.500 $61.120
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 4.000 $100,000.000 $117,000.000 $200,000.000 $155,920.000 $112,102.080
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 2.000 $300,000.000 $175,000.000 $260,000.000 $196,840.000 $96,925.780
REMOV STR (RET WALL)
LF 3,858.000 $100.000 $46.000 $53.000 $45.000 $90.000
REMOVE STR (RAIL)
LF 3,906.000 $30.000 $28.000 $50.000 $28.890 $26.330
MOBILIZATION
LS 1.000 $12,520,037.090 $14,000,000.000 $14,000,000.000 $15,512,940.600 $17,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 31.000 $15,000.000 $69,000.000 $103,000.000 $27,400.000 $35,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 275.000 $45.000 $170.000 $185.000 $147.000 $169.180
ROCK FILTER DAMS (REMOVE)
LF 275.000 $13.500 $42.000 $46.000 $37.000 $42.570
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,160.000 $40.000 $44.000 $50.000 $44.000 $44.090
CONSTRUCTION EXITS (REMOVE)
SY 2,160.000 $10.000 $13.000 $15.000 $12.500 $13.730
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,472.000 $5.000 $4.000 $4.500 $4.000 $3.980
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,472.000 $1.000 $1.000 $1.300 $1.000 $1.170
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,843.000 $6.000 $8.000 $9.000 $5.000 $8.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,843.000 $1.000 $1.000 $1.300 $1.000 $1.170
CONSTRUCTING DETOURS
SY 25,499.000 $95.000 $165.000 $128.000 $125.000 $139.320
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 18,970.000 $70.000 $102.000 $68.000 $45.250 $50.340
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 5,040.000 $60.000 $92.000 $66.000 $36.500 $49.030
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 380.000 $70.000 $90.000 $66.000 $65.000 $53.740
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 39,930.000 $7.000 $10.000 $6.000 $7.550 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 26,200.000 $7.000 $5.500 $5.500 $13.000 $7.080
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 860.000 $10.000 $8.500 $9.000 $44.250 $10.310
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 22,370.000 $15.000 $12.000 $7.000 $18.500 $10.500
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 5,040.000 $14.000 $14.000 $7.700 $18.400 $14.250
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 380.000 $14.000 $13.000 $7.000 $58.500 $14.560
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 7,763.000 $80.000 $124.000 $138.000 $88.000 $89.760
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 1,372.000 $225.000 $263.000 $397.000 $267.000 $492.000
CONC CURB (MONO) (TY II)
LF 31,053.000 $6.000 $5.100 $2.600 $5.150 $5.610
DRIVEWAYS (CONC)
SY 4,340.302 $100.000 $86.000 $104.000 $169.000 $159.010
CONC SIDEWALKS (4")
SY 353.000 $100.000 $67.000 $77.000 $156.000 $182.960
CURB RAMPS (TY 1)
EA 6.000 $2,600.000 $2,500.000 $3,400.000 $2,810.000 $2,753.490
CONC MEDIAN
SY 4,468.000 $80.000 $84.000 $137.000 $157.000 $107.840
MTL W-BEAM GD FEN (STEEL POST)
LF 7,868.200 $34.000 $27.000 $25.000 $26.300 $27.620
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 23.000 $2,150.000 $2,400.000 $2,060.000 $2,300.000 $2,301.730
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,500.000 $1,700.000 $1,400.000 $1,570.000 $1,553.660
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 31.800 $100.000 $130.000 $86.000 $125.000 $95.520
REMOVE METAL BEAM GUARD FENCE
LF 2,087.000 $3.000 $2.600 $2.100 $2.500 $2.300
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $215.000 $265.000 $206.000 $250.000 $230.170
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $225.000 $265.000 $206.000 $250.000 $230.170
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 11.000 $250.000 $265.000 $206.000 $250.000 $230.170
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $3,300.000 $3,300.000 $3,000.000 $3,180.000 $3,337.500
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $300.000 $265.000 $206.000 $250.000 $230.170
CRASH CUSH ATTEN (MOVE & RESET)
EA 19.000 $1,600.000 $1,800.000 $1,700.000 $1,200.000 $1,375.270
CRASH CUSH ATTEN (REMOVE)
EA 17.000 $1,000.000 $1,000.000 $960.000 $1,530.000 $1,755.070
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $26,000.000 $35,000.000 $34,000.000 $47,160.000 $36,683.780
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 4.000 $30,000.000 $35,000.000 $34,000.000 $52,200.000 $46,023.040
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 10.000 $9,400.000 $9,000.000 $8,500.000 $7,560.000 $8,694.770
PIPE UNDERDRAINS (TY 8) (6")
LF 9,796.000 $50.000 $35.000 $28.000 $51.750 $35.520
PIPE UNDERDRAINS (TY 9) (6")
LF 810.000 $50.000 $64.000 $67.000 $55.750 $97.260
REMOVE RD IL ASM (TRANS-BASE)
EA 66.000 $1,000.000 $700.000 $1,420.000 $1,210.000 $1,420.410
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 22.000 $1,500.000 $2,200.000 $1,750.000 $1,490.000 $1,747.910
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 14.000 $1,400.000 $2,300.000 $2,175.000 $1,850.000 $2,171.670
IN RD IL (TY SA) 50B-12 (400W EQ) LED
EA 3.000 $5,400.000 $5,300.000 $6,175.000 $5,280.000 $6,198.090
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 3.000 $6,000.000 $4,700.000 $6,850.000 $5,850.000 $6,867.210
HI MST IL POLE (150 FT)( 80 MPH)
EA 11.000 $54,000.000 $45,000.000 $60,520.000 $51,700.000 $60,745.990
CONDT (PVC) (SCH 40) (2")
LF 9,840.000 $14.000 $22.000 $12.050 $10.300 $12.070
CONDT (PVC) (SCH 40) (2") (BORE)
LF 650.000 $35.000 $79.000 $36.250 $31.000 $36.390
CONDT (PVC) (SCH 40) (3")
LF 174.000 $25.000 $42.000 $15.050 $12.900 $15.100
CONDT (PVC) (SCH 40) (3") (BORE)
LF 1,155.000 $40.000 $84.000 $45.600 $39.000 $45.780
CONDT (PVC) (SCH 40) (4")
LF 35.000 $26.000 $45.000 $29.250 $25.000 $29.350
CONDT (PVC) (SCH 40) (4") (BORE)
LF 316.000 $40.000 $84.000 $55.000 $47.000 $55.170
CONDT (PVC) (SCH 80) (2")
LF 7,960.000 $14.000 $26.000 $15.000 $12.800 $14.980
CONDT (PVC) (SCH 80) (2") (BORE)
LF 4,462.000 $30.000 $45.000 $39.000 $33.250 $39.080
CONDT (PVC) (SCH 80) (3")
LF 8,065.000 $27.000 $28.000 $17.750 $15.100 $17.740
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,535.000 $38.000 $64.000 $48.000 $41.000 $48.130
CONDT (RM) (3/4")
LF 2,452.000 $35.000 $50.000 $44.500 $38.000 $44.610
CONDT (RM) (2")
LF 1,558.000 $50.000 $61.000 $52.750 $45.000 $52.820
CONDT (RM) (3")
LF 1,569.000 $65.000 $100.000 $76.000 $65.000 $76.300
ELEC CONDR (NO.14) INSULATED
LF 11,180.000 $1.100 $2.500 $1.300 $1.100 $1.270
ELEC CONDR (NO.8) BARE
LF 3,854.000 $2.000 $2.900 $2.000 $1.700 $1.970
ELEC CONDR (NO.8) INSULATED
LF 7,708.000 $2.000 $3.000 $2.100 $1.750 $2.050
ELEC CONDR (NO.6) BARE
LF 17,045.000 $2.000 $3.200 $2.250 $1.900 $2.240
ELEC CONDR (NO.6) INSULATED
LF 27,316.000 $2.500 $3.100 $2.250 $1.850 $2.150
TRAY CABLE (3 CONDR) (12 AWG)
LF 9,370.000 $2.500 $6.000 $3.500 $2.900 $3.380
GROUND BOX TY A (122311)
EA 11.000 $1,300.000 $1,650.000 $1,175.000 $998.000 $1,171.530
GROUND BOX TY A (122311)W/APRON
EA 33.000 $1,500.000 $2,700.000 $1,300.000 $1,110.000 $1,298.310
GROUND BOX TY D (162922)W/APRON
EA 26.000 $1,450.000 $3,600.000 $1,560.000 $1,330.000 $1,560.080
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
EA 7.000 $10,800.000 $14,000.000 $12,350.000 $10,550.000 $12,384.440
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 5.000 $10,000.000 $12,000.000 $11,680.000 $9,990.000 $11,721.210
ALUMINUM SIGNS (TY G)
SF 78.000 $36.000 $36.000 $35.000 $31.000 $29.920
ALUMINUM SIGNS (TY O)
SF 2,769.000 $38.000 $33.000 $40.000 $35.500 $41.690
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 49.000 $750.000 $790.000 $760.000 $678.000 $702.030
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $850.000 $850.000 $805.000 $717.000 $730.800
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 74.000 $850.000 $810.000 $785.000 $699.000 $776.840
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,000.000 $1,250.000 $1,115.000 $992.000 $1,030.030
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 14.000 $800.000 $900.000 $810.000 $721.000 $891.920
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
EA 1.000 $895.000 $860.000 $775.000 $689.000 $949.470
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 14.000 $900.000 $925.000 $880.000 $783.000 $943.720
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $1,100.000 $1,100.000 $1,025.000 $911.000 $983.990
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $1,100.000 $1,100.000 $1,008.000 $898.000 $1,133.590
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,100.000 $1,400.000 $1,330.000 $1,180.000 $1,345.350
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 1.000 $1,800.000 $900.000 $863.000 $769.000 $1,260.190
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 5.000 $1,129.000 $950.000 $900.000 $800.000 $1,047.290
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 2.000 $1,200.000 $1,700.000 $1,545.000 $1,380.000 $1,288.960
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 3.000 $1,600.000 $1,900.000 $1,760.000 $1,570.000 $1,714.790
IN SM RD SN SUP&AM TYS80(2)SB(P)
EA 2.000 $2,300.000 $1,700.000 $1,615.000 $1,440.000 $3,009.510
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
EA 6.000 $4,000.000 $1,300.000 $1,235.000 $1,100.000 $3,136.110
REMOVE SM RD SN SUP&AM
EA 98.000 $115.000 $170.000 $163.000 $145.000 $86.310
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
EA 6.000 $6,400.000 $7,200.000 $6,042.000 $5,380.000 $6,197.400
IN SRSS & AM (RAIL)(90 MPH)(T MOUNT)
EA 8.000 $5,000.000 $7,200.000 $6,605.000 $5,880.000 $5,006.260
REMOVE LRSA
EA 10.000 $1,400.000 $1,350.000 $2,122.000 $1,890.000 $978.240
INS OH SN SUP(35 FT CANT)
EA 6.000 $50,000.000 $52,000.000 $60,420.000 $53,800.000 $63,297.510
INS OH SN SUP(40 FT CANT)
EA 5.000 $50,000.000 $62,000.000 $69,225.000 $61,600.000 $72,504.420
REMOVE OVERHD SIGN SUP
EA 8.000 $7,000.000 $9,000.000 $7,565.000 $6,740.000 $8,056.050
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 1.000 $1,337.500 $1,300.000 $2,570.000 $2,290.000 $2,762.080
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 81.000 $26.000 $21.000 $155.000 $20.000 $23.020
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 95.000 $25.500 $21.000 $170.000 $20.000 $23.020
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 72.000 $22.000 $26.000 $24.000 $20.000 $23.020
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 76.000 $31.000 $26.000 $40.000 $25.000 $44.880
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 24.000 $25.000 $26.000 $40.000 $25.000 $44.880
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 30.000 $60.000 $46.000 $88.000 $55.000 $63.300
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 34.000 $60.000 $96.000 $104.000 $55.000 $63.300
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 35,400.000 $2.000 $1.700 $1.600 $1.450 $1.700
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 293.000 $1.400 $3.200 $3.150 $2.850 $3.350
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 141,255.000 $1.250 $1.300 $1.200 $1.100 $1.270
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 12,520.000 $2.000 $2.300 $2.250 $2.000 $2.350
WK ZN PAV MRK REMOV (W)12"(LNDP)
LF 11,978.000 $6.000 $6.200 $6.100 $5.450 $6.400
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 1,200.000 $5.000 $9.000 $9.000 $8.000 $9.390
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 520.000 $12.000 $16.000 $15.500 $14.000 $16.430
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 155.000 $25.000 $125.000 $122.000 $110.000 $129.120
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 184,795.000 $2.000 $1.300 $1.200 $1.100 $1.270
REFL PAV MRKR TY II-A-A
EA 264.000 $6.000 $9.000 $8.350 $7.500 $8.800
REFL PAV MRKR TY II-C-R
EA 1,827.000 $6.000 $8.000 $7.800 $7.000 $8.220
ELIM EXT PAV MRK & MRKS (4")
LF 31,779.000 $1.500 $0.450 $0.400 $0.350 $0.410
ELIM EXT PAV MRK & MRKS (6")
LF 158,575.000 $1.000 $0.600 $0.550 $0.500 $0.560
ELIM EXT PAV MRK & MRKS (8")
LF 7,545.000 $4.000 $1.300 $1.150 $1.000 $1.170
ELIM EXT PAV MRK & MRKS (12")
LF 1,920.000 $2.130 $1.700 $1.650 $1.500 $1.760
ELIM EXT PAV MRK & MRKS (24")
LF 140.000 $10.000 $3.900 $3.750 $3.350 $3.930
ELIM EXT PAV MRK & MRKS (ARROW)
EA 5.000 $100.000 $160.000 $155.000 $140.000 $164.350
ELIM EXT PAV MRK & MRKS (WORD)
EA 3.000 $75.000 $205.000 $200.000 $180.000 $211.300
PAV SURF PREP FOR MRK (6")
LF 115,849.000 $0.140 $0.300 $0.300 $0.250 $0.290
PAV SURF PREP FOR MRK (8")
LF 13,529.000 $0.240 $0.400 $0.400 $0.350 $0.410
PAV SURF PREP FOR MRK (12")
LF 5,127.000 $0.750 $1.600 $1.500 $1.350 $1.580
PAV SURF PREP FOR MRK (24")
LF 884.000 $4.500 $2.600 $2.500 $2.250 $2.640
PAV SURF PREP FOR MRK (ARROW)
EA 66.000 $28.000 $55.000 $53.500 $48.000 $56.340
PAV SURF PREP FOR MRK (DBL ARROW)
EA 16.000 $56.000 $125.000 $122.600 $110.000 $129.130
PAV SURF PREP FOR MRK (NUMBER)
EA 5.000 $40.000 $80.000 $78.000 $70.000 $82.170
PAV SURF PREP FOR MRK (WORD)
EA 64.000 $65.000 $120.000 $117.000 $105.000 $123.250
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 94.000 $25.000 $29.000 $27.850 $25.000 $29.350
PAV SURF PREP FOR MRK (RPM)
EA 2,091.000 $2.000 $2.400 $2.250 $2.000 $2.350
INSTALL HWY TRF SIG (SYSTEM)
EA 3.000 $35,000.000 $47,000.000 $60,500.000 $51,700.000 $60,736.600
REMOVING TRAFFIC SIGNALS
EA 2.000 $8,400.000 $9,500.000 $10,500.000 $8,940.000 $10,494.490
TEMP TRAF SIGNALS
EA 1.000 $75,000.000 $150,000.000 $18,000.000 $15,390.000 $18,066.030
VEH SIG SEC (12")LED(GRN)
EA 41.000 $365.000 $900.000 $415.000 $355.000 $416.730
VEH SIG SEC (12")LED(GRN ARW)
EA 7.000 $365.000 $900.000 $420.000 $360.000 $422.600
VEH SIG SEC (12")LED(YEL)
EA 41.000 $365.000 $900.000 $415.000 $355.000 $416.730
VEH SIG SEC (12")LED(YEL ARW)
EA 10.000 $365.000 $900.000 $420.000 $360.000 $422.600
VEH SIG SEC (12")LED(RED)
EA 41.000 $365.000 $900.000 $415.000 $355.000 $416.730
VEH SIG SEC (12")LED(RED ARW)
EA 6.000 $365.000 $900.000 $420.000 $360.000 $422.600
PED SIG SEC (LED)(COUNTDOWN)
EA 4.000 $735.000 $900.000 $920.000 $789.000 $926.200
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 42.000 $200.000 $270.000 $175.000 $150.000 $176.090
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 5.000 $225.000 $285.000 $228.000 $195.000 $228.910
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 2,156.000 $2.250 $4.500 $2.750 $2.400 $2.790
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 4,772.000 $3.000 $5.500 $3.450 $2.950 $3.460
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 470.000 $3.500 $5.500 $4.450 $3.800 $4.470
TRF SIG CBL (TY A)(12 AWG)(9 CONDR)
LF 6,806.000 $4.000 $9.000 $4.650 $4.000 $4.700
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 1.000 $16,578.750 $30,000.000 $15,000.000 $12,840.000 $15,072.630
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 2.000 $13,500.000 $32,000.000 $16,625.000 $14,220.000 $16,691.410
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 2.000 $16,500.000 $38,000.000 $19,700.000 $16,820.000 $19,744.680
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 2.000 $20,000.000 $40,000.000 $20,125.000 $17,210.000 $20,202.490
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 1.000 $20,000.000 $42,000.000 $22,835.000 $19,530.000 $22,925.890
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $42,000.000 $56,000.000 $42,680.000 $36,500.000 $42,846.660
INS TRF SIG PL AM(S)2 ARM(40-32')LUM
EA 1.000 $25,000.000 $47,000.000 $26,150.000 $22,370.000 $26,259.720
INS TRF SIG PL AM(S)2 ARM(50-36')LUM
EA 1.000 $40,000.000 $68,000.000 $48,315.000 $41,320.000 $48,504.770
INS TRF SIG PL AM(S)2 ARM(50 - 40')LUM
EA 1.000 $40,000.000 $69,000.000 $48,935.000 $41,850.000 $49,126.910
INS TRF SIG PL AM(S)2 ARM(50-44')LUM
EA 1.000 $46,100.000 $70,000.000 $49,850.000 $42,630.000 $50,042.550
PED POLE ASSEMBLY
EA 3.000 $2,700.000 $8,000.000 $4,535.000 $3,880.000 $4,554.660
PED DETECT PUSH BUTTON (APS)
EA 4.000 $1,100.000 $2,500.000 $950.000 $811.000 $952.020
PED DETECTOR CONTROLLER UNIT
EA 1.000 $5,000.000 $8,200.000 $5,100.000 $4,360.000 $5,118.140
NO. OF WORKING DAYS
$/D 11,083.000 $795.000 $555.000 $675.000 $555.000 $795.000
SP MIXES SP-B PG64-22
TON 40,433.000 $120.000 $168.000 $130.000 $164.000 $148.550
TIP TESTING(DRILL SHAFT)
EA 21.000 $4,000.000 $5,750.000 $6,005.000 $5,780.000 $6,617.470
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 442.000 $79.000 $0.000 $0.000 $0.000 $0.000
THERMO PIPE(24")(PP)(TY S)(TY II)
LF 12,130.000 $110.000 $0.000 $0.000 $0.000 $0.000
THERMO PIPE(30")(PP)(TY S)(TY II)
LF 2,920.000 $136.000 $0.000 $0.000 $0.000 $0.000
THERMO PIPE(36")(PP)(TY S)(TY II)
LF 79.000 $165.000 $0.000 $0.000 $0.000 $0.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 225,599.000 $2.000 $2.000 $1.300 $2.350 $1.740
LEAD CONTAINING COATING MANAGEMENT
SF 120.500 $330.000 $198.000 $225.000 $192.000 $245.070
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $15,000.000 $20,000.000 $21,000.000 $24,580.000 $21,801.670
ITS MULTI-DUCT CND (PVC-80)
LF 7,960.000 $25.000 $37.000 $45.550 $39.000 $45.720
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 1,200.000 $60.000 $75.000 $64.300 $55.000 $64.560
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 46,575.000 $1.520 $1.000 $0.900 $0.800 $0.940
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 13,739.000 $1.300 $1.000 $1.000 $0.850 $1.020
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 785.000 $2.100 $2.500 $2.400 $2.150 $2.520
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 11,668.000 $1.810 $1.600 $1.500 $1.350 $1.580
MULTIPOLYMER PAV MRK (W)(8")(DOT)
LF 1,861.000 $2.500 $3.000 $2.950 $2.650 $3.110
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 4,682.000 $5.000 $6.000 $5.600 $5.000 $5.870
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 445.000 $4.000 $4.500 $4.100 $3.650 $4.280
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 884.000 $10.500 $11.500 $11.150 $10.000 $11.740
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 46,404.000 $1.000 $1.000 $0.900 $0.800 $0.940
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 9,360.000 $1.200 $1.200 $1.150 $1.000 $1.170
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 64.000 $310.000 $285.000 $285.000 $255.000 $299.340
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
EA 16.000 $465.000 $500.000 $495.000 $440.000 $516.510
MULTIPOLYMER PAV MRK (W) (WORD)
EA 64.000 $400.000 $395.000 $392.000 $350.000 $410.860
MULTIPOLYMER PAV MRK (W) 36" YLD TRI
EA 94.000 $100.000 $130.000 $125.000 $112.000 $131.480
MULTIPOLYMER PAV MRK (W) (NUMBER)
EA 5.000 $210.000 $210.000 $210.000 $187.000 $219.520
MULTIPOLYMER PAV MRK (W) (LNDP ARW)
EA 2.000 $475.000 $640.000 $650.000 $575.000 $674.990
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 3.000 $9,000.000 $10,500.000 $10,700.000 $9,150.000 $10,741.010
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
EA 3.000 $3,759.030 $6,700.000 $6,175.000 $5,280.000 $6,198.090
ITS POLE (60 FT)(REL)
EA 1.000 $13,000.000 $18,500.000 $5,350.000 $4,570.000 $5,368.180
ITS POLE MNT CAB (TY 2)(CONF 2)(REL)
EA 2.000 $5,000.000 $6,500.000 $5,040.000 $4,310.000 $5,059.430
VIDEO IMAGING AND RAD VEH DETECTION SYS
EA 3.000 $55,000.000 $52,000.000 $37,000.000 $31,650.000 $37,153.330
CAT 5 ETHERNET CABLE
LF 719.000 $4.000 $5.500 $2.800 $2.400 $2.790
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 11.000 $50,000.000 $32,000.000 $56,450.000 $48,270.000 $56,663.240
TMA (STATIONARY)
DAY 3,500.000 $220.000 $180.000 $250.000 $423.000 $182.880
TMA (MOBILE OPERATION)
HR 2,000.000 $90.000 $105.000 $130.000 $81.250 $75.530
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 23.000 $5,800.000 $5,000.000 $6,690.000 $5,720.000 $6,715.770
1
RC PIPE (CL III)(18 IN)
LF 442.000 $79.000 $170.000 $160.000 $93.750 $73.390
2
RC PIPE (CL III)(24 IN)
LF 12,130.000 $110.000 $180.000 $175.000 $127.000 $103.840
3
RC PIPE (CL III)(30 IN)
LF 2,920.000 $136.000 $190.000 $185.000 $139.000 $132.160
4
RC PIPE (CL III)(36 IN)
LF 79.000 $165.000 $210.000 $210.000 $186.250 $201.140
Totals: $135,817,170.920 $151,581,089.262 $152,539,698.970 $155,148,688.994 $184,768,100.994