GRAYSON US 75 (0047-18-086)

Items: 121

County: GRAYSON
Length: N/A
Highway: US 75
District: PARIS
Control Number: 0047-18-086
DBE Goal: N/A
Project: NH 2019(618)
Guaranty: N/A
Time: 250 WORKING DAYS
Engineer's Estimate: $4,419,624.60
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: FREEWAY OPERATIONAL IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$4,419,624.60
$4,623,050.08
Over/Under Est: 4.6% $203,425.48
$5,267,407.32
Over/Under Est: 19.18% $847,782.72
Amt Left: 13.94% $644,357.24

Bid Items & Bid Tabulations

121 Total 0 of 121
GRAYSON  |  US 75  |  PARIS  |  0047-18-086  |  04/03/2019  |  $4,419,624.60  |  NH 2019(618)  |  FREEWAY OPERATIONAL IMPRVS  |  250 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ED BELL CONSTRUCTION COMPANY
JAGOE-PUBLIC COMPANY
PREPARING ROW
STA 76.000 $3,000.000 $525.000 $1,450.000
REMOVING CONC (PAV)
SY 5,501.000 $8.000 $15.750 $24.000
REMOVING CONC (RIPRAP)
SY 581.000 $20.000 $10.500 $14.000
REMOVING CONC (MEDIANS)
SY 14.000 $20.000 $52.500 $66.000
REMOVING CONC (DRIVEWAYS)
SY 375.000 $15.000 $15.750 $11.000
REMOVING CONC (CURB)
LF 300.000 $5.000 $10.500 $9.000
REMOVING CONC (PAVERS)
SY 14.000 $8.000 $31.500 $77.000
REMOVING STB BASE AND ASPH PAV(10-14")
SY 11,064.000 $5.000 $6.030 $6.040
OBLITERATING ABANDONED ROAD
SY 12,285.000 $5.000 $11.550 $6.040
EXCAVATION (ROADWAY)
CY 44,229.000 $7.000 $15.750 $16.000
SUBGRADE WIDENING (ORD COMP)
STA 15.000 $180.000 $420.000 $1,292.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 14,843.000 $7.000 $15.750 $16.500
BACKFILLING PAVEMENT EDGES
CY 224.000 $60.000 $52.500 $73.000
ROAD GRADER WORK (ORD COMP)
STA 79.000 $150.000 $840.000 $360.000
BLOCK SODDING
SY 15,013.000 $6.000 $3.150 $2.830
STRAW OR HAY MULCH
SY 69,356.000 $0.150 $0.210 $0.230
DRILL SEEDING (TEMP) (WARM)
SY 34,678.000 $0.150 $0.050 $0.190
DRILL SEEDING (TEMP) (COOL)
SY 34,678.000 $0.400 $0.050 $0.200
VEGETATIVE WATERING
MG 2,093.000 $11.000 $3.150 $29.000
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
CY 8,549.000 $60.000 $59.000 $82.000
CEMENT
TON 371.000 $150.000 $140.000 $155.000
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 29,113.000 $5.000 $2.100 $2.500
PRIME COAT (RC-250)
GAL 8,152.000 $7.250 $4.750 $6.180
ASPH (AC-20-5TR OR AC-20XP)
GAL 13,393.000 $5.900 $4.500 $4.470
AGGR (TY-B GR-3)
CY 278.000 $230.000 $210.000 $200.000
D-GR HMA TY-B PG64-22
TON 4,444.000 $78.000 $88.000 $80.000
D-GR HMA TY-C PG64-22
TON 2,906.000 $80.000 $92.100 $83.000
PLANE ASPH CONC PAV (2")
SY 1,391.000 $3.250 $6.300 $6.320
CURB (TYPE II - A)
LF 300.000 $20.000 $25.200 $22.690
FULL - DEPTH REPAIR CRCP (9")
SY 200.000 $610.000 $222.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 199.000 $5.000 $21.000 $11.600
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 96.000 $250.000 $183.750 $193.690
RIPRAP (CONC)(4 IN)
CY 123.000 $600.000 $525.000 $1,000.000
RIPRAP (CONC) (CL B) (4")
CY 4.300 $530.000 $840.000 $590.000
RIPRAP (MOW STRIP)(4 IN)
CY 49.000 $450.000 $630.000 $715.000
CMP (GAL STL 24 IN)
LF 112.000 $80.000 $73.500 $76.830
RC PIPE (CL III)(24 IN)
LF 114.000 $100.000 $84.000 $128.640
RC PIPE (CL IV)(18 IN)
LF 60.000 $100.000 $73.500 $107.470
RC PIPE (CL IV)(24 IN)
LF 68.000 $150.000 $115.500 $132.170
RC PIPE (CL IV)(42 IN)
LF 143.000 $200.000 $210.000 $225.000
INLET (COMPL) (TY C) (2 GRATE)
EA 2.000 $5,000.000 $5,250.000 $2,803.300
HEADWALL (CH - FW - 30) (DIA= 42 IN)
EA 1.000 $10,000.000 $7,350.000 $8,522.050
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $1,500.000 $630.000 $765.380
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,350.000 $945.000 $1,600.550
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $840.000 $1,051.770
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $945.000 $1,620.370
ADJUSTING INLET (CAP)
EA 1.000 $2,000.000 $2,100.000 $892.710
REMOV STR (INLET)
EA 3.000 $1,000.000 $735.000 $448.700
REMOV STR (SET)
EA 2.000 $500.000 $315.000 $448.710
REMOV STR (HEADWALL)
EA 2.000 $1,500.000 $1,155.000 $1,368.460
REMOV STR (PIPE)
LF 621.000 $20.000 $15.750 $15.410
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $80,000.000 $42,000.000 $60,000.000
MOBILIZATION
LS 1.000 $405,000.000 $354,000.000 $520,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $4,500.000 $10,500.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $18.000 $26.460 $38.950
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 880.000 $29.000 $30.350 $44.210
ROCK FILTER DAMS (REMOVE)
LF 980.000 $9.000 $7.680 $15.790
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,008.000 $24.000 $29.360 $29.430
CONSTRUCTION EXITS (REMOVE)
SY 1,008.000 $8.000 $8.140 $8.160
TEMP SEDMT CONT FENCE (INSTALL)
LF 80.000 $5.000 $8.400 $8.420
TEMP SEDMT CONT FENCE (REMOVE)
LF 80.000 $1.000 $5.250 $5.260
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $3.250 $8.400 $8.420
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $1.000 $5.250 $5.260
CONSTRUCTING DETOURS
SY 4,424.000 $65.000 $63.000 $58.450
PORT CTB (DES SOURCE)(F-SHAPE)(TY 2)
LF 3,930.000 $10.000 $5.250 $20.130
PORT CTB (MOVE)(F-SHAPE)(TY 2)
LF 5,590.000 $5.000 $5.250 $20.000
PORT CTB (STKPL)(F-SHAPE)(TY 2)
LF 3,930.000 $10.000 $5.250 $19.010
LANDSCAPE PAVERS
SY 14.000 $55.000 $262.500 $415.070
DRIVEWAYS (CONC)
SY 324.000 $80.000 $94.500 $72.000
CURB RAMPS (TY 20)
EA 1.000 $1,950.000 $3,150.000 $2,025.000
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 1,666.000 $0.550 $6.300 $5.310
MTL W-BEAM GD FEN (STEEL POST)
LF 875.000 $28.750 $22.270 $21.050
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,000.000 $2,241.270 $1,736.880
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $1,023.750 $968.450
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $3.250 $3.150 $3.160
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $550.000 $157.500 $194.740
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $800.000 $157.500 $194.740
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,500.000 $2,756.250 $2,473.740
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $300.000 $262.500 $194.740
CRASH CUSH ATTEN (INSTL)
EA 8.000 $14,800.000 $9,450.000 $7,842.290
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $1,650.000 $1,155.000 $1,052.660
CRASH CUSH ATTEN (STKPL)
EA 8.000 $1,200.000 $735.000 $631.590
REMOVE RD IL ASM (TRANS-BASE)
EA 9.000 $1,600.000 $504.000 $333.690
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 12.000 $3,150.000 $4,242.000 $3,221.130
CONDT (PVC) (SCH 40) (3")
LF 25.000 $15.000 $32.550 $48.630
CONDT (RM) (3") (BORE)
LF 44.000 $50.000 $54.600 $63.160
DCT CBL (3 NO.8) (2 INSULATED 1 BARE)
LF 3,282.000 $15.000 $8.400 $10.680
ALUMINUM SIGNS (TY A)
SF 212.000 $20.000 $18.900 $21.050
ALUMINUM SIGNS (TY G)
SF 198.000 $25.000 $22.050 $31.840
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 22.000 $700.000 $451.500 $785.280
REMOVE SM RD SN SUP&AM
EA 21.000 $80.000 $72.450 $277.900
REMOVE LRSA
EA 3.000 $900.000 $782.250 $666.330
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 5,192.000 $0.200 $0.370 $0.370
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,696.000 $0.200 $0.370 $0.370
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 2,046.000 $0.750 $1.520 $1.530
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 61.000 $1.000 $2.100 $2.110
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 16,163.000 $0.700 $1.250 $1.250
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,925.000 $0.700 $1.250 $1.250
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 54.000 $2.500 $2.630 $2.630
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,785.000 $1.000 $1.210 $1.210
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 808.000 $5.000 $3.150 $3.160
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 85.000 $8.000 $6.300 $6.320
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 6.000 $135.000 $152.250 $152.640
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 2.000 $160.000 $288.750 $289.480
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 4.000 $150.000 $204.750 $205.270
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 5.000 $35.000 $89.250 $89.480
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 220.000 $10.000 $6.300 $6.320
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 1,280.000 $0.500 $0.790 $0.790
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 8,617.000 $0.500 $0.580 $0.580
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 6,569.000 $0.500 $0.580 $0.580
REFL PAV MRKR TY II-C-R
EA 167.000 $5.000 $6.300 $6.320
RELOCATE PED POLE ASSEMBLY
EA 1.000 $1,200.000 $2,415.000 $14,589.810
REMOVAL OF CONDUIT
LF 25.000 $15.000 $12.600 $3.470
REMOVAL OF CABLES
LF 3,180.000 $2.000 $0.530 $0.890
REMOVAL OF PEDESTRIAN RAMPS
EA 1.000 $451.000 $699.660 $796.980
GEOGRID BASE REINFORCEMENT (TY II)
SY 29,113.000 $2.000 $2.100 $1.990
PATCHING MILLED CONCRETE RUMBLE STRIPS
LF 3,327.000 $17.000 $12.600 $11.050
INSTALL CONDUCTOR
LF 25.000 $10.000 $33.600 $8.160
REMOVE CONDUCTOR
LF 25.000 $5.000 $2.100 $4.740
TMA (STATIONARY)
DAY 40.000 $200.090 $420.000 $248.000
TMA (MOBILE OPERATION)
HR 60.000 $150.000 $31.500 $200.000
Totals: $4,419,624.600 $4,623,050.080 $5,267,407.320