PREPARING ROW
|
STA
|
305.000
|
$19,680.000
|
$3,400.000
|
$39,977.040
|
$28,017.880
|
$15,000.000
|
$46,046.630
|
$25,000.000
|
|
|
|
REMOV CONC (PAV)
|
SY
|
107,446.000
|
$14.500
|
$8.000
|
$9.000
|
$8.850
|
$12.000
|
$10.810
|
$6.800
|
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
9,917.000
|
$6.800
|
$3.160
|
$5.000
|
$4.700
|
$12.000
|
$1.720
|
$5.200
|
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
6,288.000
|
$13.700
|
$8.000
|
$9.000
|
$8.700
|
$12.000
|
$14.940
|
$5.000
|
|
|
|
REMOV CONC (RIPRAP)
|
CY
|
8.500
|
$181.000
|
$84.400
|
$134.000
|
$217.000
|
$700.000
|
$212.080
|
$150.000
|
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
19.000
|
$16.260
|
$23.200
|
$27.000
|
$134.000
|
$12.000
|
$177.130
|
$68.000
|
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
588.000
|
$19.800
|
$7.300
|
$21.000
|
$18.500
|
$12.000
|
$16.340
|
$8.750
|
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
293.000
|
$23.880
|
$6.400
|
$10.000
|
$35.000
|
$12.000
|
$25.430
|
$17.500
|
|
|
|
REMOV CONC (CURB)
|
LF
|
1,498.000
|
$9.600
|
$1.400
|
$9.000
|
$5.450
|
$12.000
|
$12.660
|
$3.500
|
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
2,798.000
|
$11.800
|
$2.100
|
$9.800
|
$5.850
|
$12.000
|
$13.730
|
$3.750
|
|
|
|
REMOV CONC (FOUNDATIONS)
|
CY
|
1,641.000
|
$252.000
|
$46.400
|
$61.000
|
$125.000
|
$37.000
|
$170.750
|
$31.350
|
|
|
|
REMOV CONC (RETAINING WALLS)
|
SY
|
51.000
|
$85.000
|
$78.400
|
$25.000
|
$138.000
|
$375.000
|
$374.340
|
$50.000
|
|
|
|
REMOV CONC (APPR SLAB)
|
SY
|
14.400
|
$64.600
|
$300.000
|
$50.000
|
$379.000
|
$750.000
|
$892.700
|
$180.000
|
|
|
|
REMOV CONC (ABUTMENT BACKWALL)
|
CY
|
33.300
|
$1,030.000
|
$908.000
|
$63.000
|
$421.000
|
$750.000
|
$551.090
|
$226.000
|
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
14,678.000
|
$30.000
|
$13.600
|
$16.000
|
$19.800
|
$12.000
|
$9.570
|
$10.500
|
|
|
|
REMOV CONC (RAIL)
|
LF
|
2,647.000
|
$12.000
|
$15.500
|
$20.000
|
$22.000
|
$25.000
|
$18.570
|
$12.000
|
|
|
|
REMOV CONC (FLUME)
|
SY
|
1,116.000
|
$48.600
|
$14.500
|
$6.500
|
$16.600
|
$12.000
|
$14.410
|
$18.500
|
|
|
|
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
149,382.000
|
$6.100
|
$4.700
|
$2.700
|
$3.000
|
$2.000
|
$2.410
|
$2.950
|
|
|
|
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
|
SY
|
27,509.000
|
$8.300
|
$7.000
|
$4.400
|
$6.750
|
$3.500
|
$5.850
|
$5.750
|
|
|
|
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
|
SY
|
10,783.000
|
$8.900
|
$7.600
|
$7.800
|
$10.500
|
$5.000
|
$8.060
|
$9.250
|
|
|
|
RMV (17"-21") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,194.000
|
$13.000
|
$13.300
|
$13.000
|
$16.600
|
$15.000
|
$43.520
|
$10.400
|
|
|
|
RMV (0"-2") TRT/UNTRT BASE & ASPH PAV
|
SY
|
3,959.000
|
$4.000
|
$5.800
|
$1.100
|
$1.450
|
$6.000
|
$3.460
|
$2.500
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
185,950.000
|
$11.500
|
$7.300
|
$9.000
|
$14.100
|
$16.000
|
$9.000
|
$8.000
|
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
144,303.000
|
$24.000
|
$26.000
|
$17.000
|
$29.100
|
$32.000
|
$25.000
|
$14.500
|
|
|
|
EMBANK (FNL)(DC)(TY C2)
|
CY
|
262,559.000
|
$11.500
|
$15.500
|
$7.000
|
$20.300
|
$12.000
|
$13.000
|
$13.000
|
|
|
|
BACKFILL (TY A)
|
STA
|
731.260
|
$299.000
|
$205.000
|
$260.000
|
$271.000
|
$400.000
|
$98.000
|
$490.000
|
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
247,246.000
|
$1.900
|
$1.850
|
$2.000
|
$1.600
|
$1.000
|
$2.910
|
$3.600
|
|
|
|
BLOCK SODDING
|
SY
|
247,246.000
|
$3.900
|
$3.550
|
$3.450
|
$3.350
|
$3.400
|
$3.400
|
$3.750
|
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
247,246.000
|
$0.200
|
$0.100
|
$0.100
|
$0.250
|
$0.100
|
$0.100
|
$0.150
|
|
|
|
VEGETATIVE WATERING
|
TGL
|
54,205.000
|
$0.100
|
$1.000
|
$2.000
|
$10.500
|
$0.100
|
$0.010
|
$41.250
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
53,999.000
|
$60.000
|
$62.000
|
$68.000
|
$56.500
|
$68.000
|
$59.540
|
$67.000
|
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
299,899.000
|
$2.000
|
$1.250
|
$1.500
|
$1.800
|
$1.000
|
$1.460
|
$1.500
|
|
|
|
CEM TRT(PLNT MX)(CL L)(TYD)(GR1-2)(6")
|
SY
|
241,573.000
|
$16.500
|
$18.500
|
$14.500
|
$21.900
|
$17.000
|
$20.900
|
$17.000
|
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
59,037.000
|
$5.000
|
$4.550
|
$4.500
|
$4.300
|
$4.300
|
$4.300
|
$11.000
|
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
26,281.000
|
$110.000
|
$130.000
|
$126.000
|
$124.000
|
$128.550
|
$124.250
|
$132.000
|
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
26,591.000
|
$140.000
|
$117.500
|
$113.000
|
$112.000
|
$115.850
|
$112.150
|
$136.000
|
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
20,591.000
|
$120.000
|
$150.000
|
$145.000
|
$143.000
|
$147.900
|
$143.200
|
$140.000
|
|
|
|
TACK COAT
|
GAL
|
9,407.000
|
$3.900
|
$4.900
|
$4.700
|
$4.600
|
$4.600
|
$4.600
|
$7.700
|
|
|
|
PLANE & TEXT ASPH CONC PAV(2")
|
SY
|
1,153.000
|
$5.300
|
$7.300
|
$13.000
|
$10.900
|
$10.000
|
$7.030
|
$3.750
|
|
|
|
PLANE ASPH CONC PAV(12")
|
SY
|
22,048.000
|
$9.000
|
$11.750
|
$7.000
|
$12.300
|
$11.000
|
$8.850
|
$8.250
|
|
|
|
CONC PVMT (CRCP) (9")
|
SY
|
2,581.000
|
$101.000
|
$86.000
|
$88.000
|
$122.000
|
$85.000
|
$89.480
|
$120.000
|
|
|
|
CONC PVMT (CRCP) (13")
|
SY
|
237,716.000
|
$100.000
|
$90.000
|
$88.000
|
$99.000
|
$90.000
|
$87.000
|
$124.000
|
|
|
|
FULL - DEPTH REPAIR CRCP (13")
|
CY
|
248.000
|
$805.000
|
$1,965.000
|
$1,100.000
|
$1,110.000
|
$1,400.000
|
$1,791.000
|
$660.000
|
|
|
|
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
|
CY
|
84.000
|
$2,450.000
|
$965.000
|
$1,250.000
|
$1,440.000
|
$1,800.000
|
$2,312.000
|
$680.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
507.000
|
$699.000
|
$233.000
|
$700.000
|
$165.000
|
$130.000
|
$135.170
|
$430.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
4,792.000
|
$208.000
|
$115.000
|
$300.000
|
$221.000
|
$200.000
|
$158.530
|
$215.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
398.000
|
$300.000
|
$200.000
|
$310.000
|
$233.000
|
$220.000
|
$165.000
|
$280.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
12,747.000
|
$7.400
|
$3.260
|
$4.400
|
$11.600
|
$10.000
|
$12.680
|
$12.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
79,233.000
|
$30.700
|
$35.000
|
$29.000
|
$20.000
|
$42.000
|
$35.000
|
$35.000
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
400.000
|
$257.000
|
$112.000
|
$107.000
|
$125.000
|
$110.000
|
$132.560
|
$130.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
4,410.000
|
$308.000
|
$204.000
|
$207.000
|
$227.000
|
$200.000
|
$205.410
|
$205.000
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,752.000
|
$392.000
|
$236.000
|
$247.000
|
$261.000
|
$260.000
|
$273.160
|
$315.000
|
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
471.000
|
$500.000
|
$493.000
|
$722.000
|
$447.000
|
$500.000
|
$479.160
|
$590.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
315.000
|
$553.000
|
$4,360.000
|
$572.000
|
$350.000
|
$564.050
|
$572.070
|
$525.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
320.000
|
$300.000
|
$330.000
|
$246.000
|
$300.000
|
$242.550
|
$247.190
|
$265.000
|
|
|
|
CL A CONC (FLUME)
|
CY
|
321.800
|
$831.000
|
$645.000
|
$615.000
|
$623.000
|
$825.000
|
$679.230
|
$520.000
|
|
|
|
CL B CONC (FLUME)
|
CY
|
16.200
|
$1,820.000
|
$780.000
|
$788.000
|
$824.000
|
$900.000
|
$731.420
|
$585.000
|
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
653.800
|
$1,760.000
|
$1,498.000
|
$865.000
|
$1,730.000
|
$2,000.000
|
$1,486.850
|
$1,100.000
|
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
482.400
|
$1,920.000
|
$1,604.000
|
$1,395.000
|
$1,750.000
|
$2,000.000
|
$1,559.480
|
$1,650.000
|
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
486.500
|
$1,590.000
|
$1,147.000
|
$1,190.000
|
$1,200.000
|
$1,450.000
|
$1,350.000
|
$1,600.000
|
|
|
|
CL C CONC (FOOTING)(HPC)(MASS)
|
CY
|
106.800
|
$810.000
|
$1,376.000
|
$800.000
|
$1,960.000
|
$2,000.000
|
$1,501.590
|
$1,005.000
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
1,045.700
|
$699.000
|
$742.000
|
$560.000
|
$616.000
|
$1,100.000
|
$906.390
|
$525.000
|
|
|
|
CL F CONC (CAP)(INVT)(HPC)
|
CY
|
76.200
|
$2,060.000
|
$1,827.000
|
$1,590.000
|
$1,560.000
|
$3,000.000
|
$2,268.800
|
$265.000
|
|
|
|
CL F CONC (CAP)(STRDL)(HPC)
|
CY
|
73.900
|
$2,060.000
|
$2,007.000
|
$1,850.000
|
$1,590.000
|
$3,300.000
|
$2,406.790
|
$520.000
|
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
134,333.000
|
$23.500
|
$27.500
|
$21.000
|
$30.500
|
$35.000
|
$25.700
|
$585.000
|
|
|
|
REINF CONC SLAB (EXTEND SLAB)(HPC)
|
SF
|
7,106.000
|
$40.000
|
$62.000
|
$37.000
|
$44.750
|
$68.000
|
$60.880
|
$1,100.000
|
|
|
|
APPROACH SLAB (HPC)
|
CY
|
1,020.000
|
$776.000
|
$752.000
|
$915.000
|
$651.000
|
$1,200.000
|
$582.480
|
$1,650.000
|
|
|
|
APPROACH SLAB (EXTEND) (HPC)
|
CY
|
56.000
|
$1,080.000
|
$1,090.000
|
$1,300.000
|
$1,010.000
|
$1,650.000
|
$669.200
|
$1,600.000
|
|
|
|
BRIDGE SIDEWALK(HPC)
|
SF
|
4,569.000
|
$125.000
|
$12.000
|
$12.000
|
$10.500
|
$28.000
|
$12.830
|
$765.000
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
65,789.000
|
$70.000
|
$87.000
|
$96.000
|
$70.750
|
$112.000
|
$82.460
|
$1,850.000
|
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
89,533.000
|
$20.000
|
$22.000
|
$28.500
|
$20.000
|
$35.000
|
$22.720
|
$1,700.000
|
|
|
|
RETAINING WALL (DRILL SHAFT) (FASCIA)
|
SF
|
932.000
|
$96.700
|
$111.000
|
$111.000
|
$119.000
|
$165.000
|
$131.920
|
$29.000
|
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,809.290
|
$177.000
|
$264.000
|
$229.000
|
$241.000
|
$225.000
|
$263.880
|
$38.000
|
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
12,141.490
|
$235.000
|
$280.000
|
$220.000
|
$234.000
|
$235.000
|
$268.020
|
$790.000
|
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
4,591.600
|
$245.000
|
$428.000
|
$286.000
|
$254.000
|
$275.000
|
$377.760
|
$940.000
|
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
16,341.100
|
$10.500
|
$6.300
|
$5.800
|
$2.000
|
$5.000
|
$5.500
|
$16.500
|
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
22.600
|
$200.000
|
$547.000
|
$210.000
|
$450.000
|
$450.000
|
$167.000
|
$264.000
|
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
23.600
|
$540.000
|
$535.000
|
$220.000
|
$450.000
|
$450.000
|
$210.000
|
$250.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2,113.300
|
$775.000
|
$630.000
|
$460.000
|
$473.000
|
$550.000
|
$531.630
|
$570.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
40.000
|
$1,060.000
|
$855.000
|
$555.000
|
$501.000
|
$600.000
|
$533.460
|
$530.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
944.500
|
$788.000
|
$695.000
|
$535.000
|
$555.000
|
$640.000
|
$632.410
|
$575.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
1,025.000
|
$213.000
|
$186.000
|
$105.000
|
$334.000
|
$270.000
|
$189.570
|
$215.000
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
185.400
|
$54.000
|
$70.000
|
$42.000
|
$40.000
|
$65.000
|
$65.000
|
$44.000
|
|
|
|
RAIL (TY T221)
|
LF
|
38.000
|
$190.000
|
$86.000
|
$92.000
|
$278.000
|
$420.000
|
$163.280
|
$80.000
|
|
|
|
RAIL (TY SSTR)
|
LF
|
19,949.000
|
$86.500
|
$68.000
|
$76.000
|
$51.250
|
$75.000
|
$70.000
|
$70.000
|
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
4,650.100
|
$107.000
|
$89.000
|
$99.000
|
$63.250
|
$75.000
|
$78.750
|
$80.000
|
|
|
|
RAIL (TY C221)
|
LF
|
961.000
|
$174.000
|
$135.000
|
$130.000
|
$124.000
|
$135.000
|
$179.070
|
$80.000
|
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
1,143.000
|
$249.000
|
$154.000
|
$149.000
|
$108.000
|
$135.000
|
$187.060
|
$200.000
|
|
|
|
RAIL (TY PR11)
|
LF
|
54.000
|
$213.000
|
$167.000
|
$178.000
|
$169.000
|
$169.000
|
$240.630
|
$137.500
|
|
|
|
RAIL (CLF-RO)
|
LF
|
200.000
|
$137.000
|
$197.000
|
$182.000
|
$183.000
|
$160.000
|
$200.000
|
$165.000
|
|
|
|
RAIL (TY T80PP)
|
LF
|
1,203.000
|
$133.000
|
$153.000
|
$185.000
|
$128.000
|
$200.000
|
$198.000
|
$182.000
|
|
|
|
RAIL (TY T80PP-TS)
|
LF
|
736.000
|
$527.000
|
$458.000
|
$420.000
|
$418.000
|
$400.000
|
$379.000
|
$192.500
|
|
|
|
RAIL (CLF-RO)(MOD)
|
LF
|
200.000
|
$82.000
|
$233.000
|
$210.000
|
$212.000
|
$185.000
|
$250.000
|
$192.500
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,228.000
|
$237.000
|
$199.000
|
$183.000
|
$286.000
|
$220.000
|
$199.340
|
$220.000
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
266.000
|
$440.000
|
$290.000
|
$550.000
|
$461.000
|
$1,200.000
|
$559.760
|
$610.000
|
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
382.000
|
$685.000
|
$495.000
|
$900.000
|
$519.000
|
$530.000
|
$890.550
|
$1,110.000
|
|
|
|
CONC BOX CULV (10 FT X 9 FT)
|
LF
|
782.000
|
$2,500.000
|
$1,110.000
|
$2,200.000
|
$1,360.000
|
$1,700.000
|
$1,894.000
|
$3,000.000
|
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
8.000
|
$7,260.000
|
$8,155.000
|
$5,900.000
|
$7,630.000
|
$6,350.000
|
$4,486.530
|
$11,050.000
|
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
17.000
|
$9,480.000
|
$8,185.000
|
$7,500.000
|
$10,280.000
|
$9,000.000
|
$7,154.720
|
$17,000.000
|
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
39.000
|
$7,200.000
|
$9,365.000
|
$6,500.000
|
$5,520.000
|
$8,000.000
|
$6,456.100
|
$7,315.000
|
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$10,280.000
|
$6,395.000
|
$7,700.000
|
$7,900.000
|
$11,000.000
|
$7,851.120
|
$10,700.000
|
|
|
|
JCTBOX(COMPL)(PJB)(5FTX6FT)
|
EA
|
1.000
|
$11,500.000
|
$8,060.000
|
$12,200.000
|
$9,790.000
|
$14,000.000
|
$9,957.130
|
$13,600.000
|
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$12,000.000
|
$8,060.000
|
$12,900.000
|
$11,590.000
|
$15,500.000
|
$10,173.130
|
$13,500.000
|
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
4.000
|
$9,310.000
|
$8,170.000
|
$7,000.000
|
$8,970.000
|
$8,750.000
|
$8,534.350
|
$10,500.000
|
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
12.000
|
$8,800.000
|
$8,670.000
|
$7,300.000
|
$8,940.000
|
$10,500.000
|
$8,821.850
|
$11,000.000
|
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
2.000
|
$9,630.000
|
$8,430.000
|
$7,500.000
|
$9,480.000
|
$10,500.000
|
$9,039.840
|
$10,200.000
|
|
|
|
INLET (COMPL)(PCU)(4FT)(LEFT)
|
EA
|
6.000
|
$7,300.000
|
$9,725.000
|
$8,600.000
|
$10,360.000
|
$13,300.000
|
$9,893.360
|
$14,500.000
|
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
1.000
|
$11,900.000
|
$8,905.000
|
$8,900.000
|
$10,180.000
|
$18,000.000
|
$9,717.900
|
$12,800.000
|
|
|
|
INLET (COMPL)(POD)(FG)(3FTX3FT)
|
EA
|
1.000
|
$6,800.000
|
$6,980.000
|
$5,200.000
|
$9,520.000
|
$7,100.000
|
$8,970.450
|
$10,600.000
|
|
|
|
INLET (COMPL)(POD)(FG)(4FTX4FT)
|
EA
|
2.000
|
$9,300.000
|
$11,350.000
|
$6,200.000
|
$11,340.000
|
$8,000.000
|
$10,777.090
|
$15,600.000
|
|
|
|
INLET (COMPL)(POD)(SFG)(4FTX4FT)
|
EA
|
1.000
|
$9,300.000
|
$7,710.000
|
$6,200.000
|
$11,330.000
|
$11,000.000
|
$10,662.450
|
$15,750.000
|
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
36.000
|
$7,520.000
|
$6,775.000
|
$5,900.000
|
$7,600.000
|
$8,000.000
|
$8,325.280
|
$8,900.000
|
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
9.000
|
$8,380.000
|
$7,710.000
|
$7,900.000
|
$8,640.000
|
$10,000.000
|
$9,342.780
|
$12,350.000
|
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
33.000
|
$7,980.000
|
$7,265.000
|
$6,500.000
|
$8,180.000
|
$7,600.000
|
$8,500.780
|
$9,700.000
|
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
7.000
|
$8,380.000
|
$9,165.000
|
$7,900.000
|
$8,690.000
|
$9,500.000
|
$10,229.960
|
$14,150.000
|
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
6.000
|
$9,510.000
|
$8,185.000
|
$7,400.000
|
$8,250.000
|
$12,100.000
|
$8,883.280
|
$11,800.000
|
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,622.000
|
$7,100.000
|
$5,900.000
|
$7,380.000
|
$9,000.000
|
$9,297.150
|
$9,300.000
|
|
|
|
INLET (COMPL) (TY MSE2)
|
EA
|
29.000
|
$14,830.000
|
$8,955.000
|
$6,200.000
|
$14,770.000
|
$14,332.670
|
$8,804.000
|
$12,025.000
|
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$6,000.000
|
$3,760.000
|
$9,400.000
|
$14,210.000
|
$6,750.000
|
$12,211.680
|
$6,100.000
|
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$8,100.000
|
$5,530.000
|
$10,100.000
|
$14,210.000
|
$8,100.000
|
$13,022.450
|
$7,800.000
|
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$15,000.000
|
$19,650.000
|
$24,000.000
|
$19,501.540
|
$15,000.000
|
$23,101.240
|
$15,500.000
|
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$18,000.000
|
$31,510.000
|
$26,000.000
|
$30,440.000
|
$25,000.000
|
$31,709.770
|
$25,650.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$24,000.000
|
$46,365.000
|
$38,000.000
|
$78,500.000
|
$36,000.000
|
$44,770.390
|
$41,400.000
|
|
|
|
WINGWALL (PW - 1) (HW=18 FT)
|
EA
|
1.000
|
$75,000.000
|
$369,075.000
|
$290,000.000
|
$217,900.000
|
$500,000.000
|
$289,456.000
|
$168,500.000
|
|
|
|
WINGWALL (PW - 1) (HW=23 FT)
|
EA
|
1.000
|
$80,000.000
|
$723,000.000
|
$315,000.000
|
$308,700.000
|
$600,000.000
|
$401,327.000
|
$480,350.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,760.000
|
$1,215.000
|
$2,600.000
|
$2,050.000
|
$2,650.000
|
$1,880.220
|
$1,260.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,400.000
|
$1,215.000
|
$2,600.000
|
$2,050.000
|
$3,350.000
|
$1,880.240
|
$1,260.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,700.000
|
$1,480.000
|
$2,500.000
|
$2,080.000
|
$3,400.000
|
$1,897.600
|
$1,275.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,020.000
|
$1,635.000
|
$2,700.000
|
$2,360.000
|
$3,600.000
|
$2,067.840
|
$1,480.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$3,020.000
|
$1,640.000
|
$2,700.000
|
$2,360.000
|
$3,400.000
|
$2,067.830
|
$1,480.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$1,845.000
|
$3,700.000
|
$4,110.000
|
$3,800.000
|
$3,727.760
|
$2,325.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$4,980.000
|
$2,210.000
|
$4,200.000
|
$5,360.000
|
$4,300.000
|
$3,550.160
|
$3,225.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$5,945.000
|
$4,305.000
|
$4,600.000
|
$7,170.000
|
$6,600.000
|
$5,650.540
|
$4,525.000
|
|
|
|
THERMOPLASTIC PIPE (HDPE) (24")
|
LF
|
1,674.000
|
$100.000
|
$80.000
|
$190.000
|
$102.000
|
$110.000
|
$75.000
|
$180.000
|
|
|
|
THERMOPLASTIC PIPE (HDPE) (36")
|
LF
|
481.000
|
$130.000
|
$115.000
|
$300.000
|
$102.000
|
$168.000
|
$95.000
|
$335.000
|
|
|
|
ADJUSTING INLETS
|
EA
|
2.000
|
$3,260.000
|
$2,575.000
|
$3,100.000
|
$5,300.000
|
$5,500.000
|
$10,015.900
|
$1,800.000
|
|
|
|
ADJUSTING INLETS (CAP)
|
EA
|
5.000
|
$3,260.000
|
$2,575.000
|
$2,100.000
|
$5,300.000
|
$6,500.000
|
$5,006.360
|
$5,900.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
44.000
|
$14,200.000
|
$7,000.000
|
$1,400.000
|
$3,020.000
|
$5,000.000
|
$3,400.000
|
$4,700.000
|
|
|
|
REMOV STR (INLET)
|
EA
|
35.000
|
$1,939.000
|
$998.000
|
$950.000
|
$2,230.000
|
$950.000
|
$946.110
|
$950.000
|
|
|
|
REMOV STR (MANHOLE)
|
EA
|
2.000
|
$2,000.000
|
$1,066.000
|
$1,500.000
|
$1,830.000
|
$1,750.000
|
$942.690
|
$950.000
|
|
|
|
REMOV STR (SET)
|
EA
|
19.000
|
$1,170.000
|
$650.000
|
$890.000
|
$1,160.000
|
$850.000
|
$515.770
|
$800.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$3,280.000
|
$1,730.000
|
$6,900.000
|
$2,160.000
|
$3,500.000
|
$6,453.630
|
$2,350.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
3.000
|
$4,050.000
|
$1,730.000
|
$3,200.000
|
$2,390.000
|
$3,000.000
|
$6,453.630
|
$2,350.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
5,844.000
|
$31.200
|
$17.000
|
$23.000
|
$47.500
|
$30.000
|
$35.460
|
$18.750
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
758.000
|
$110.000
|
$36.000
|
$200.000
|
$145.000
|
$170.000
|
$86.130
|
$25.000
|
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
6.000
|
$100,900.000
|
$80,000.000
|
$125,000.000
|
$101,700.000
|
$81,500.000
|
$76,543.000
|
$27,500.000
|
|
|
|
REMOVE STR (RAIL)
|
LF
|
632.000
|
$79.400
|
$16.000
|
$20.000
|
$23.100
|
$170.000
|
$28.590
|
$6.000
|
|
|
|
REMOVE STR (DRIVEWAY CULVERT)
|
EA
|
3.000
|
$435.000
|
$723.000
|
$1,260.000
|
$604.000
|
$4,150.000
|
$1,809.600
|
$1,250.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$13,960,502.680
|
$12,000,000.000
|
$13,200,000.000
|
$13,600,000.000
|
$13,000,000.000
|
$14,044,222.730
|
$14,000,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
45.000
|
$30,000.000
|
$40,250.000
|
$20,000.000
|
$41,970.000
|
$100,000.000
|
$60,700.000
|
$2,000.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
10.000
|
$22,500.000
|
$18,915.000
|
$23,000.000
|
$25,100.000
|
$9,000.000
|
$18,402.500
|
$15,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
800.000
|
$485.000
|
$255.000
|
$190.000
|
$25.000
|
$250.000
|
$304.180
|
$250.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
400.000
|
$200.000
|
$953.000
|
$650.000
|
$85.000
|
$1,220.000
|
$304.180
|
$350.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,005.000
|
$63.300
|
$70.500
|
$65.000
|
$35.000
|
$35.000
|
$45.000
|
$71.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
1,650.000
|
$66.000
|
$103.000
|
$94.000
|
$70.000
|
$38.000
|
$60.000
|
$105.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,655.000
|
$25.500
|
$28.200
|
$26.000
|
$25.000
|
$2.000
|
$10.000
|
$30.000
|
|
|
|
TEMP PAVED FLUME (INSTALL)
|
SY
|
335.000
|
$30.000
|
$66.000
|
$105.000
|
$75.000
|
$195.000
|
$80.000
|
$58.000
|
|
|
|
TEMP PAVED FLUME (REMOVE)
|
SY
|
336.000
|
$10.000
|
$9.450
|
$10.000
|
$35.000
|
$5.000
|
$21.460
|
$10.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,000.000
|
$33.200
|
$40.550
|
$37.000
|
$16.000
|
$37.000
|
$30.000
|
$41.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,000.000
|
$8.800
|
$12.800
|
$12.000
|
$10.500
|
$5.000
|
$10.000
|
$13.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
33,806.000
|
$4.300
|
$3.700
|
$3.500
|
$2.250
|
$3.000
|
$3.950
|
$3.700
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
33,806.000
|
$0.700
|
$1.050
|
$1.000
|
$0.750
|
$0.100
|
$0.950
|
$1.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
6,888.000
|
$4.600
|
$6.500
|
$6.000
|
$5.000
|
$3.000
|
$5.000
|
$6.500
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
6,888.000
|
$1.200
|
$1.250
|
$1.120
|
$0.750
|
$0.250
|
$1.000
|
$1.250
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
20,891.000
|
$100.000
|
$132.000
|
$108.000
|
$141.000
|
$135.000
|
$103.690
|
$120.000
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
47,900.000
|
$30.000
|
$10.000
|
$50.000
|
$25.800
|
$10.000
|
$39.370
|
$90.000
|
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
150.000
|
$50.000
|
$4.800
|
$70.000
|
$34.000
|
$10.000
|
$56.880
|
$95.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
4,120.000
|
$49.900
|
$77.000
|
$84.000
|
$25.400
|
$40.000
|
$57.670
|
$101.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$63.200
|
$81.000
|
$76.000
|
$87.500
|
$90.000
|
$72.530
|
$92.000
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
95,580.000
|
$9.000
|
$3.600
|
$10.000
|
$6.950
|
$5.000
|
$19.560
|
$8.500
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
930.000
|
$7.400
|
$6.700
|
$11.000
|
$13.600
|
$5.000
|
$17.390
|
$9.000
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
21,560.000
|
$6.200
|
$4.400
|
$6.000
|
$10.200
|
$5.000
|
$9.420
|
$8.500
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
540.000
|
$11.000
|
$11.700
|
$9.000
|
$16.200
|
$5.000
|
$16.180
|
$8.000
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
47,900.000
|
$17.000
|
$5.800
|
$12.500
|
$9.200
|
$5.000
|
$9.540
|
$10.000
|
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
150.000
|
$6.700
|
$7.000
|
$9.000
|
$15.000
|
$5.000
|
$37.740
|
$17.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
4,120.000
|
$8.300
|
$5.800
|
$14.000
|
$13.000
|
$5.000
|
$13.060
|
$10.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$20.400
|
$11.000
|
$14.000
|
$15.800
|
$5.000
|
$26.840
|
$21.000
|
|
|
|
PORT CTB(FUR & INSTL)(F-SHAPE)(TY T)
|
LF
|
1.000
|
$69.200
|
$1,423.000
|
$575.000
|
$1,500.000
|
$150.000
|
$5,000.000
|
$1,900.000
|
|
|
|
PORT CTB(MOVE)(F-SHAPE)(TY T)
|
LF
|
2.000
|
$51.400
|
$113.000
|
$205.000
|
$150.000
|
$5.000
|
$2,500.000
|
$585.000
|
|
|
|
PORT CTB(REMOVE)(F-SHAPE)(TY T)
|
LF
|
1.000
|
$82.400
|
$300.000
|
$320.000
|
$1,000.000
|
$5.000
|
$3,000.000
|
$1,200.000
|
|
|
|
PORT CTB (PINNING)
|
EA
|
1,736.000
|
$13.000
|
$94.050
|
$65.000
|
$9.800
|
$120.000
|
$57.820
|
$110.000
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
14,617.000
|
$99.000
|
$93.000
|
$96.000
|
$83.000
|
$90.000
|
$70.000
|
$88.000
|
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,200.000
|
$9.300
|
$0.700
|
$5.000
|
$8.200
|
$1.000
|
$3.900
|
$10.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
8,035.000
|
$45.500
|
$30.000
|
$17.000
|
$44.500
|
$35.000
|
$31.700
|
$22.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,989.000
|
$102.000
|
$107.000
|
$90.000
|
$108.000
|
$100.000
|
$98.480
|
$82.500
|
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,912.500
|
$97.000
|
$62.200
|
$50.000
|
$79.750
|
$70.000
|
$73.210
|
$55.000
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$3,780.000
|
$2,575.000
|
$2,600.000
|
$3,050.000
|
$2,900.000
|
$2,609.260
|
$2,000.000
|
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$4,160.000
|
$2,575.000
|
$3,400.000
|
$2,480.000
|
$2,900.000
|
$2,609.270
|
$2,750.000
|
|
|
|
CURB RAMPS (TY 6)
|
EA
|
4.000
|
$6,050.000
|
$1,470.000
|
$4,000.000
|
$4,730.000
|
$2,900.000
|
$2,609.260
|
$3,300.000
|
|
|
|
CURB RAMPS (TY 7)
|
EA
|
8.000
|
$3,790.000
|
$2,785.000
|
$3,400.000
|
$2,970.000
|
$2,900.000
|
$2,609.260
|
$3,900.000
|
|
|
|
MILL RUMBLE STRIPS (CONC) (SHLDR)
|
LF
|
63,069.000
|
$0.600
|
$1.050
|
$0.750
|
$0.800
|
$0.500
|
$0.640
|
$0.600
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
12,562.500
|
$25.800
|
$30.750
|
$30.000
|
$27.500
|
$27.500
|
$29.500
|
$32.500
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
41.000
|
$2,670.000
|
$2,470.000
|
$2,300.000
|
$2,100.000
|
$2,100.000
|
$2,250.000
|
$2,615.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
33.000
|
$1,440.000
|
$1,530.000
|
$1,250.000
|
$1,350.000
|
$1,350.000
|
$1,200.000
|
$1,320.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
11,712.500
|
$2.300
|
$2.100
|
$2.600
|
$2.000
|
$2.000
|
$2.500
|
$2.750
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$212.000
|
$210.000
|
$128.000
|
$200.000
|
$200.000
|
$125.000
|
$140.000
|
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
5.000
|
$212.000
|
$210.000
|
$154.000
|
$200.000
|
$200.000
|
$150.000
|
$165.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
27.000
|
$179.000
|
$210.000
|
$254.000
|
$150.000
|
$150.000
|
$250.000
|
$275.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
44.000
|
$2,910.000
|
$3,430.000
|
$3,100.000
|
$3,100.000
|
$3,100.000
|
$3,000.000
|
$3,300.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
25.000
|
$212.000
|
$210.000
|
$254.000
|
$200.000
|
$200.000
|
$250.000
|
$275.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
43.000
|
$2,350.000
|
$1,175.000
|
$1,900.000
|
$1,700.000
|
$1,250.000
|
$1,204.010
|
$2,000.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
24.000
|
$1,170.000
|
$785.000
|
$820.000
|
$1,110.000
|
$1,500.000
|
$846.000
|
$400.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
$17,440.000
|
$31,965.000
|
$38,000.000
|
$24,850.000
|
$26,000.000
|
$27,913.520
|
$33,000.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$56,470.000
|
$31,965.000
|
$54,000.000
|
$39,500.000
|
$29,000.000
|
$27,403.520
|
$46,750.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
|
EA
|
22.000
|
$8,000.000
|
$9,000.000
|
$7,800.000
|
$7,350.000
|
$5,500.000
|
$7,725.310
|
$11,000.000
|
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
31,841.000
|
$36.000
|
$23.950
|
$33.000
|
$37.250
|
$35.000
|
$15.000
|
$30.000
|
|
|
|
RELOCATE RD IL ASM (SHOE-BASE)
|
EA
|
1.000
|
$2,064.000
|
$1,330.000
|
$4,100.000
|
$2,500.000
|
$3,985.000
|
$3,985.000
|
$2,750.000
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
33.000
|
$550.000
|
$1,030.000
|
$475.000
|
$650.000
|
$460.000
|
$460.000
|
$550.000
|
|
|
|
IN RD IL (TY SP) 38S-8-8 (250W EQ) LED
|
EA
|
14.000
|
$5,500.000
|
$7,225.000
|
$5,900.000
|
$7,000.000
|
$5,790.000
|
$5,790.000
|
$7,260.000
|
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
40.000
|
$6,650.000
|
$6,030.000
|
$3,900.000
|
$4,800.000
|
$3,800.000
|
$3,800.000
|
$5,000.000
|
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
140.000
|
$33.400
|
$26.000
|
$42.000
|
$20.000
|
$41.000
|
$41.000
|
$22.000
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
15,200.000
|
$42.700
|
$16.500
|
$16.000
|
$10.500
|
$15.650
|
$15.650
|
$22.000
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,340.000
|
$41.720
|
$25.050
|
$36.000
|
$22.500
|
$34.800
|
$34.800
|
$55.000
|
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
10.000
|
$21.000
|
$47.500
|
$75.000
|
$30.000
|
$74.300
|
$74.300
|
$33.000
|
|
|
|
CONDUIT (PREPARE)
|
LF
|
1,135.000
|
$2.500
|
$2.100
|
$1.100
|
$4.000
|
$1.050
|
$1.050
|
$3.300
|
|
|
|
ITS MULTI-DUCT CND (PVC-80)
|
LF
|
10,015.000
|
$39.000
|
$28.550
|
$41.000
|
$40.000
|
$40.300
|
$40.300
|
$44.000
|
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
710.000
|
$60.000
|
$43.800
|
$37.000
|
$36.250
|
$36.250
|
$36.250
|
$66.000
|
|
|
|
ELEC CONDR (NO.14) BARE
|
LF
|
10,735.000
|
$2.000
|
$2.500
|
$1.900
|
$2.000
|
$1.800
|
$1.800
|
$1.050
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
17,540.000
|
$2.700
|
$2.500
|
$3.000
|
$2.500
|
$2.950
|
$2.950
|
$1.950
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
35,200.000
|
$4.000
|
$2.700
|
$3.000
|
$2.550
|
$2.950
|
$2.950
|
$2.150
|
|
|
|
ITS GND BOX TY 1 (362422)W/APRON
|
EA
|
18.000
|
$6,820.000
|
$8,335.000
|
$4,500.000
|
$4,430.000
|
$4,429.000
|
$4,429.000
|
$5,500.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
29.000
|
$1,680.000
|
$1,610.000
|
$2,000.000
|
$1,300.000
|
$1,919.000
|
$1,919.000
|
$1,070.000
|
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$406.000
|
$725.000
|
$465.000
|
$450.000
|
$459.000
|
$459.000
|
$385.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$12,800.000
|
$10,865.000
|
$12,400.000
|
$9,500.000
|
$12,085.000
|
$12,085.000
|
$8,800.000
|
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,587.000
|
$35.400
|
$40.100
|
$37.000
|
$37.750
|
$35.750
|
$35.750
|
$31.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
59.000
|
$689.000
|
$725.000
|
$615.000
|
$635.000
|
$610.000
|
$815.000
|
$675.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
14.000
|
$783.000
|
$865.000
|
$730.000
|
$755.000
|
$725.000
|
$1,033.000
|
$800.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
138.000
|
$765.000
|
$930.000
|
$720.000
|
$744.000
|
$715.000
|
$918.000
|
$790.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
4.000
|
$928.000
|
$960.000
|
$780.000
|
$807.000
|
$775.000
|
$910.000
|
$860.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
25.000
|
$989.000
|
$1,200.000
|
$950.000
|
$984.000
|
$945.000
|
$1,160.000
|
$1,050.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,220.000
|
$1,310.000
|
$1,100.000
|
$1,130.000
|
$1,090.000
|
$1,421.000
|
$1,200.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
3.000
|
$1,490.000
|
$2,330.000
|
$2,265.000
|
$2,350.000
|
$2,255.000
|
$2,870.000
|
$2,500.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
5.000
|
$2,270.000
|
$2,565.000
|
$2,400.000
|
$2,480.000
|
$2,380.000
|
$3,136.000
|
$2,620.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
|
EA
|
1.000
|
$2,555.000
|
$2,670.000
|
$2,400.000
|
$2,480.000
|
$2,380.000
|
$3,190.000
|
$2,620.000
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
7.000
|
$3,780.000
|
$2,015.000
|
$3,400.000
|
$3,090.000
|
$3,270.000
|
$3,270.000
|
$3,265.000
|
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$671.670
|
$715.000
|
$605.000
|
$619.000
|
$595.000
|
$1,223.000
|
$660.000
|
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$525.000
|
$825.000
|
$805.000
|
$828.000
|
$795.000
|
$2,009.000
|
$875.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
227.000
|
$86.900
|
$111.000
|
$83.000
|
$82.250
|
$79.000
|
$153.100
|
$100.000
|
|
|
|
REMOVE LRSA
|
EA
|
9.000
|
$1,410.000
|
$1,020.000
|
$935.000
|
$920.000
|
$920.000
|
$920.000
|
$605.000
|
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
22.000
|
$35,480.000
|
$38,900.000
|
$32,000.000
|
$30,730.000
|
$30,730.000
|
$30,521.000
|
$33,000.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
45.000
|
$52.400
|
$53.500
|
$46.000
|
$45.000
|
$45.000
|
$50.000
|
$50.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
175.000
|
$17.200
|
$26.600
|
$21.000
|
$18.000
|
$18.000
|
$40.000
|
$22.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
170.000
|
$22.000
|
$33.250
|
$26.000
|
$25.000
|
$25.000
|
$25.000
|
$27.500
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
118.000
|
$17.200
|
$26.600
|
$21.000
|
$18.000
|
$18.000
|
$40.000
|
$22.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
255.000
|
$17.200
|
$26.600
|
$21.000
|
$18.000
|
$18.000
|
$25.000
|
$22.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
66.000
|
$22.000
|
$33.250
|
$26.000
|
$25.000
|
$25.000
|
$25.000
|
$27.500
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
76.000
|
$52.400
|
$26.600
|
$46.000
|
$18.000
|
$18.000
|
$80.000
|
$50.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
45.000
|
$110.000
|
$75.500
|
$62.000
|
$65.000
|
$65.000
|
$60.000
|
$66.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
308.000
|
$50.000
|
$20.500
|
$42.000
|
$29.700
|
$35.000
|
$20.000
|
$22.000
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
24,559.000
|
$1.700
|
$1.050
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
202.000
|
$2.000
|
$2.600
|
$2.600
|
$2.500
|
$2.500
|
$2.500
|
$2.750
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
113,618.000
|
$1.600
|
$0.900
|
$0.900
|
$0.850
|
$0.850
|
$0.850
|
$0.950
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
118,469.000
|
$1.600
|
$0.900
|
$0.900
|
$0.850
|
$0.850
|
$0.850
|
$0.950
|
|
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
118,723.000
|
$1.300
|
$0.750
|
$0.740
|
$0.700
|
$0.700
|
$0.700
|
$0.800
|
|
|
|
RE PM TY III (W)(6")(BRK)
|
LF
|
39,967.000
|
$1.700
|
$0.800
|
$0.780
|
$0.750
|
$0.750
|
$0.750
|
$0.850
|
|
|
|
RE PM TY III (W)(6")(DOT)
|
LF
|
244.000
|
$2.900
|
$2.600
|
$2.600
|
$2.500
|
$2.500
|
$2.500
|
$2.750
|
|
|
|
RE PM TY III (W)(8")(SLD)
|
LF
|
24,814.000
|
$2.000
|
$1.250
|
$1.250
|
$1.200
|
$1.200
|
$1.200
|
$1.350
|
|
|
|
RE PM TY III (W)(12")(SLD)
|
LF
|
4,233.000
|
$6.500
|
$6.850
|
$6.700
|
$6.550
|
$6.550
|
$6.550
|
$7.200
|
|
|
|
RE PM TY III (W)(12")(DOT)
|
LF
|
797.000
|
$2.500
|
$3.950
|
$4.000
|
$3.800
|
$3.800
|
$3.800
|
$4.200
|
|
|
|
RE PM TY III (W)(24")(SLD)
|
LF
|
853.000
|
$12.300
|
$9.400
|
$9.300
|
$9.000
|
$9.000
|
$9.000
|
$10.000
|
|
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
119,826.000
|
$1.300
|
$0.750
|
$0.740
|
$0.700
|
$0.700
|
$0.700
|
$0.800
|
|
|
|
RE PM TY III (Y)(8")(SLD)
|
LF
|
246.000
|
$3.000
|
$3.150
|
$3.100
|
$3.000
|
$3.000
|
$3.000
|
$3.300
|
|
|
|
RE PM TY III (Y)(12")(SLD)
|
LF
|
524.000
|
$1.410
|
$9.400
|
$9.200
|
$9.000
|
$9.000
|
$9.000
|
$10.000
|
|
|
|
RE PM TY III (W)(ARROW)
|
EA
|
42.000
|
$285.000
|
$270.400
|
$267.000
|
$260.000
|
$260.000
|
$260.000
|
$290.000
|
|
|
|
RE PM TY III (W)(WORD)
|
EA
|
25.000
|
$424.000
|
$280.800
|
$278.000
|
$270.000
|
$270.000
|
$270.000
|
$300.000
|
|
|
|
RE PM TY III (W)(NUMBER)
|
EA
|
8.000
|
$290.000
|
$105.000
|
$105.000
|
$100.000
|
$100.000
|
$100.000
|
$110.000
|
|
|
|
RE PM TY III (BLK)(6")(SHADOW)
|
LF
|
39,967.000
|
$1.300
|
$0.900
|
$0.900
|
$0.850
|
$0.850
|
$0.850
|
$0.950
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,238.000
|
$7.200
|
$5.050
|
$5.000
|
$4.850
|
$4.850
|
$4.850
|
$5.350
|
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
80,082.000
|
$0.870
|
$0.550
|
$0.550
|
$0.500
|
$0.500
|
$0.500
|
$0.550
|
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
14,394.000
|
$1.800
|
$0.550
|
$0.550
|
$0.500
|
$0.500
|
$0.500
|
$0.550
|
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
6,384.000
|
$1.300
|
$1.050
|
$1.000
|
$1.000
|
$0.980
|
$0.980
|
$1.100
|
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
3,675.000
|
$2.600
|
$2.600
|
$2.600
|
$2.500
|
$2.500
|
$2.500
|
$4.150
|
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
322.000
|
$5.100
|
$5.200
|
$5.100
|
$5.000
|
$5.000
|
$5.000
|
$5.500
|
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
8.000
|
$130.000
|
$105.000
|
$105.000
|
$100.000
|
$100.000
|
$100.000
|
$110.000
|
|
|
|
ELIM EXT PM & MRKS (NUMBER)
|
EA
|
1.000
|
$150.000
|
$260.000
|
$255.000
|
$250.000
|
$250.000
|
$250.000
|
$275.000
|
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
2.000
|
$160.000
|
$260.000
|
$255.000
|
$250.000
|
$250.000
|
$250.000
|
$275.000
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
318,816.000
|
$0.300
|
$0.160
|
$0.170
|
$0.150
|
$0.150
|
$0.150
|
$0.200
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
25,060.000
|
$0.500
|
$0.210
|
$0.210
|
$0.200
|
$0.200
|
$0.200
|
$0.250
|
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
4,757.000
|
$2.000
|
$0.520
|
$0.520
|
$0.500
|
$0.500
|
$0.500
|
$0.550
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
853.000
|
$3.900
|
$1.050
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
42.000
|
$41.700
|
$26.000
|
$26.000
|
$25.000
|
$25.000
|
$25.000
|
$27.500
|
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
8.000
|
$60.400
|
$52.000
|
$51.000
|
$50.000
|
$50.000
|
$50.000
|
$55.000
|
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
25.000
|
$85.000
|
$41.600
|
$41.000
|
$40.000
|
$40.000
|
$40.000
|
$45.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
100.000
|
$3.300
|
$2.950
|
$10.000
|
$3.500
|
$9.450
|
$9.450
|
$2.950
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
2,680.000
|
$6.000
|
$5.150
|
$15.000
|
$4.500
|
$14.700
|
$14.700
|
$3.600
|
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
1,195.000
|
$3.200
|
$2.950
|
$3.400
|
$2.500
|
$3.150
|
$3.150
|
$2.200
|
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$4,750.000
|
$3,920.000
|
$12,900.000
|
$3,000.000
|
$12,510.000
|
$12,510.000
|
$2,750.000
|
|
|
|
RELOCATE PED POLE ASSEMBLY
|
EA
|
7.000
|
$4,000.000
|
$2,690.000
|
$9,200.000
|
$2,500.000
|
$9,050.000
|
$9,050.000
|
$1,870.000
|
|
|
|
REMOVAL OF CABLES
|
LF
|
10,435.000
|
$2.100
|
$1.460
|
$0.950
|
$1.250
|
$0.900
|
$0.900
|
$1.100
|
|
|
|
RELOCATE OF PEDESTRIAN PUSH BUTTON
|
EA
|
10.000
|
$415.000
|
$2,500.000
|
$125.000
|
$350.000
|
$121.000
|
$121.000
|
$250.000
|
|
|
|
INSTALL FOUNDATION
|
EA
|
1.000
|
$2,500.000
|
$14,150.000
|
$4,200.000
|
$3,000.000
|
$4,150.000
|
$4,150.000
|
$8,250.000
|
|
|
|
REMOVE FOUNDATION
|
EA
|
1.000
|
$164.320
|
$2,175.000
|
$1,050.000
|
$620.000
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
200.000
|
$187.000
|
$510.000
|
$230.000
|
$750.000
|
$250.000
|
$464.340
|
$350.000
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
14.000
|
$5,620.000
|
$4,650.000
|
$8,000.000
|
$5,430.000
|
$5,000.000
|
$5,000.000
|
$5,500.000
|
|
|
|
LITTER REMOVAL
|
CYC
|
14.000
|
$4,480.000
|
$2,550.000
|
$4,400.000
|
$3,000.000
|
$750.000
|
$4,889.510
|
$7,500.000
|
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
4.000
|
$2,760.000
|
$3,330.000
|
$1,250.000
|
$4,000.000
|
$750.000
|
$4,889.510
|
$3,800.000
|
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
4.000
|
$3,090.000
|
$3,330.000
|
$1,250.000
|
$834.000
|
$750.000
|
$4,889.510
|
$5,700.000
|
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
4.000
|
$2,430.000
|
$3,330.000
|
$1,250.000
|
$1,000.000
|
$750.000
|
$4,889.510
|
$3,000.000
|
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
4.000
|
$3,210.000
|
$2,675.000
|
$900.000
|
$8,000.000
|
$2,000.000
|
$3,600.000
|
$2,750.000
|
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
4.000
|
$3,880.000
|
$2,675.000
|
$3,100.000
|
$5,000.000
|
$2,000.000
|
$3,600.000
|
$3,000.000
|
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
4.000
|
$2,880.000
|
$2,675.000
|
$3,100.000
|
$3,000.000
|
$2,000.000
|
$3,600.000
|
$2,800.000
|
|
|
|
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
|
SF
|
81,318.000
|
$0.900
|
$1.250
|
$1.200
|
$0.800
|
$1.170
|
$0.750
|
$1.300
|
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
264.000
|
$2.500
|
$47.250
|
$15.000
|
$12.900
|
$10.000
|
$50.000
|
$19.000
|
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
786.000
|
$4.300
|
$63.500
|
$15.000
|
$14.900
|
$15.000
|
$60.000
|
$17.000
|
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
336.000
|
$4.400
|
$74.250
|
$15.000
|
$18.000
|
$20.000
|
$65.000
|
$20.000
|
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
580.000
|
$600.000
|
$665.000
|
$55.000
|
$150.000
|
$343.050
|
$351.990
|
$150.000
|
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
41.000
|
$84.200
|
$240.000
|
$180.000
|
$225.000
|
$225.000
|
$110.000
|
$150.000
|
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
189.000
|
$400.000
|
$640.000
|
$360.000
|
$365.000
|
$365.000
|
$1,000.000
|
$715.000
|
|
|
|
REPLACING ELASTOMERIC BEARING PADS
|
EA
|
7.000
|
$9,660.000
|
$10,610.000
|
$8,100.000
|
$8,900.000
|
$8,900.000
|
$8,900.000
|
$8,800.000
|
|
|
|
CONCRETE BEAM REPAIR
|
EA
|
2.000
|
$7,740.000
|
$2,980.000
|
$4,000.000
|
$2,500.000
|
$2,500.000
|
$4,969.000
|
$1,650.000
|
|
|
|
NO. OF WORKING DAYS
|
$/D
|
30,075.000
|
$30,075.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,150.000
|
|
|
|
NO. OF DAYS MILESTONE 1
|
$/D
|
2,516.000
|
$2,516.000
|
$65.000
|
$46.000
|
$46.000
|
$65.000
|
$65.000
|
$65.000
|
|
|
|
STONE COLUMNS (30 IN)
|
LF
|
29,985.000
|
$70.000
|
$32.100
|
$35.000
|
$33.000
|
$35.260
|
$18.000
|
$31.000
|
|
|
|
REM LEAD-CONTAINING COATING(LOCATION)
|
EA
|
2.000
|
$15,000.000
|
$10,500.000
|
$6,500.000
|
$6,400.000
|
$6,399.000
|
$25,000.000
|
$7,150.000
|
|
|
|
ITS POLE (40 FT)(RELOCATE)
|
EA
|
1.000
|
$5,240.000
|
$14,250.000
|
$5,600.000
|
$7,500.000
|
$5,536.000
|
$5,536.000
|
$3,685.000
|
|
|
|
GROUND BOX (PREPARE)
|
EA
|
9.000
|
$600.000
|
$436.000
|
$61.000
|
$300.000
|
$9.000
|
$60.000
|
$400.000
|
|
|
|
BENT CAP/ABUTMENT CAP CLEANING
|
EA
|
2.000
|
$1,200.000
|
$3,575.000
|
$3,200.000
|
$3,000.000
|
$3,000.000
|
$1,500.000
|
$2,000.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,979.000
|
$119.000
|
$65.000
|
$68.000
|
$77.250
|
$110.000
|
$92.700
|
$128.000
|
|
1
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
156.000
|
$119.000
|
$66.500
|
$151.000
|
$91.250
|
$130.000
|
$135.800
|
$130.000
|
|
1
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
1,165.000
|
$119.000
|
$69.000
|
$140.000
|
$96.750
|
$140.000
|
$115.360
|
$132.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
0.000
|
$119.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
7,940.000
|
$129.250
|
$76.500
|
$88.000
|
$88.750
|
$120.000
|
$102.550
|
$176.000
|
|
2
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
166.000
|
$129.250
|
$91.000
|
$180.000
|
$152.000
|
$150.000
|
$130.380
|
$183.000
|
|
2
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
2,396.000
|
$129.250
|
$95.000
|
$166.000
|
$113.000
|
$160.000
|
$120.940
|
$192.000
|
|
2A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
0.000
|
$129.250
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
3
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,109.000
|
$148.000
|
$98.000
|
$145.000
|
$108.000
|
$155.000
|
$124.880
|
$250.000
|
|
3
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
108.000
|
$148.000
|
$115.500
|
$153.000
|
$127.000
|
$270.000
|
$123.940
|
$260.000
|
|
3
|
|
RC PIPE (CL V)(30 IN)
|
LF
|
179.000
|
$148.000
|
$140.000
|
$205.000
|
$159.000
|
$240.000
|
$154.950
|
$275.000
|
|
3A
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
0.000
|
$148.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
4
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
483.000
|
$170.000
|
$130.000
|
$175.000
|
$158.000
|
$180.000
|
$175.630
|
$330.000
|
|
4A
|
|
THERMOPLASTIC PIPE (PP) (36")
|
LF
|
0.000
|
$170.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
5
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
249.000
|
$206.500
|
$205.000
|
$299.000
|
$238.000
|
$255.000
|
$266.650
|
$600.000
|
|
5
|
|
RC PIPE (CL V)(48 IN)
|
LF
|
34.000
|
$206.500
|
$355.000
|
$405.000
|
$451.000
|
$650.000
|
$453.470
|
$770.000
|
|
5A
|
|
THERMOPLASTIC PIPE (PP) (48")
|
LF
|
0.000
|
$206.500
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$1,049,321,826.260
|
$155,588,192.105
|
$162,377,978.230
|
$166,303,656.500
|
$169,755,458.460
|
$170,680,766.728
|
$542,970,020.945
|