GRAYSON US 75 (0047-03-091)

Items: 334

County: GRAYSON
Length: 4.5670 MILES
Highway: US 75
District: PARIS
Control Number: 0047-03-091
DBE Goal: 0.0%
Project: F 2026(545)
Guaranty: $100,000.00
Time: SEE PROPOSAL BOOK FOR DAYS
Engineer's Estimate: $138,485,945.26
Date: 04/07/2026 (2 months ago)
Contract Number: 4263001
Type: WIDEN ROAD - ADD LANES
Project ID: A00123063
Contract Type: Federal
Project Description: WIDEN FROM 4 LANE TO 6 LANE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRYAN ESMAILIDOKI
MELESE NORCHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$138,485,945.26
$125,349,652.11
Over/Under Est: -9.49% -$13,136,293.15
$132,187,242.23
Over/Under Est: -4.55% -$6,298,703.03
Amt Left: 5.45% $6,837,590.12
$136,112,920.51
Over/Under Est: -1.71% -$2,373,024.75
Amt Left: 8.59% $10,763,268.40
Delta: -2.97% -$3,925,678.28
Over/Under Est: 0.74% $1,030,973.20
Amt Left: 11.3% $14,167,266.35
Delta: -2.50% -$3,403,997.95
$140,442,226.74
Over/Under Est: 1.41% $1,956,281.48
Amt Left: 12.04% $15,092,574.63
Delta: -0.66% -$925,308.28
Over/Under Est: 266.98% $369,734,285.69
Amt Left: 305.44% $382,870,578.84
Delta: -261.87% -$367,778,004.21

Bid Items & Bid Tabulations

334 Total 0 of 334
GRAYSON  |  US 75  |  PARIS  |  0047-03-091  |  04/07/2026  |  $138,485,945.26  |  F 2026(545)  |  WIDEN ROAD - ADD LANES  | 
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
RPM XCONSTRUCTION, LLC
INDUS ROAD & BRIDGE, INC.
WEBBER, LLC
MARIO SINACOLA & SONS EXCAVATING, INC.
SEMA CONSTRUCTION, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 305.000 $19,680.000 $3,400.000 $39,977.040 $28,017.880 $15,000.000 $46,046.630 $25,000.000
REMOV CONC (PAV)
SY 107,446.000 $14.500 $8.000 $9.000 $8.850 $12.000 $10.810 $6.800
REMOV CONC (MOWSTRIP)
LF 9,917.000 $6.800 $3.160 $5.000 $4.700 $12.000 $1.720 $5.200
REMOV CONC (RIPRAP)
SY 6,288.000 $13.700 $8.000 $9.000 $8.700 $12.000 $14.940 $5.000
REMOV CONC (RIPRAP)
CY 8.500 $181.000 $84.400 $134.000 $217.000 $700.000 $212.080 $150.000
REMOV CONC (MEDIANS)
SY 19.000 $16.260 $23.200 $27.000 $134.000 $12.000 $177.130 $68.000
REMOV CONC (DRIVEWAYS)
SY 588.000 $19.800 $7.300 $21.000 $18.500 $12.000 $16.340 $8.750
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 293.000 $23.880 $6.400 $10.000 $35.000 $12.000 $25.430 $17.500
REMOV CONC (CURB)
LF 1,498.000 $9.600 $1.400 $9.000 $5.450 $12.000 $12.660 $3.500
REMOV CONC (CURB & GUTTER)
LF 2,798.000 $11.800 $2.100 $9.800 $5.850 $12.000 $13.730 $3.750
REMOV CONC (FOUNDATIONS)
CY 1,641.000 $252.000 $46.400 $61.000 $125.000 $37.000 $170.750 $31.350
REMOV CONC (RETAINING WALLS)
SY 51.000 $85.000 $78.400 $25.000 $138.000 $375.000 $374.340 $50.000
REMOV CONC (APPR SLAB)
SY 14.400 $64.600 $300.000 $50.000 $379.000 $750.000 $892.700 $180.000
REMOV CONC (ABUTMENT BACKWALL)
CY 33.300 $1,030.000 $908.000 $63.000 $421.000 $750.000 $551.090 $226.000
REMOV CONC (TRAFFIC BARRIER)
LF 14,678.000 $30.000 $13.600 $16.000 $19.800 $12.000 $9.570 $10.500
REMOV CONC (RAIL)
LF 2,647.000 $12.000 $15.500 $20.000 $22.000 $25.000 $18.570 $12.000
REMOV CONC (FLUME)
SY 1,116.000 $48.600 $14.500 $6.500 $16.600 $12.000 $14.410 $18.500
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 149,382.000 $6.100 $4.700 $2.700 $3.000 $2.000 $2.410 $2.950
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
SY 27,509.000 $8.300 $7.000 $4.400 $6.750 $3.500 $5.850 $5.750
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
SY 10,783.000 $8.900 $7.600 $7.800 $10.500 $5.000 $8.060 $9.250
RMV (17"-21") TRT/UNTRT BASE & ASPH PAV
SY 1,194.000 $13.000 $13.300 $13.000 $16.600 $15.000 $43.520 $10.400
RMV (0"-2") TRT/UNTRT BASE & ASPH PAV
SY 3,959.000 $4.000 $5.800 $1.100 $1.450 $6.000 $3.460 $2.500
EXCAV (ROADWAY)
CY 185,950.000 $11.500 $7.300 $9.000 $14.100 $16.000 $9.000 $8.000
EMBANK (FNL)(DC)(TY C1)
CY 144,303.000 $24.000 $26.000 $17.000 $29.100 $32.000 $25.000 $14.500
EMBANK (FNL)(DC)(TY C2)
CY 262,559.000 $11.500 $15.500 $7.000 $20.300 $12.000 $13.000 $13.000
BACKFILL (TY A)
STA 731.260 $299.000 $205.000 $260.000 $271.000 $400.000 $98.000 $490.000
COMPOST MANUF TOPSOIL (4")
SY 247,246.000 $1.900 $1.850 $2.000 $1.600 $1.000 $2.910 $3.600
BLOCK SODDING
SY 247,246.000 $3.900 $3.550 $3.450 $3.350 $3.400 $3.400 $3.750
DRILL SEED (TEMP_WARM_COOL)
SY 247,246.000 $0.200 $0.100 $0.100 $0.250 $0.100 $0.100 $0.150
VEGETATIVE WATERING
TGL 54,205.000 $0.100 $1.000 $2.000 $10.500 $0.100 $0.010 $41.250
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 53,999.000 $60.000 $62.000 $68.000 $56.500 $68.000 $59.540 $67.000
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 299,899.000 $2.000 $1.250 $1.500 $1.800 $1.000 $1.460 $1.500
CEM TRT(PLNT MX)(CL L)(TYD)(GR1-2)(6")
SY 241,573.000 $16.500 $18.500 $14.500 $21.900 $17.000 $20.900 $17.000
PRIME COAT(MC-30 OR AE-P)
GAL 59,037.000 $5.000 $4.550 $4.500 $4.300 $4.300 $4.300 $11.000
SP MIXES SP-B PG64-22
TON 26,281.000 $110.000 $130.000 $126.000 $124.000 $128.550 $124.250 $132.000
SP MIXES SP-C PG64-22
TON 26,591.000 $140.000 $117.500 $113.000 $112.000 $115.850 $112.150 $136.000
SP MIXES SP-C SAC-A PG64-22
TON 20,591.000 $120.000 $150.000 $145.000 $143.000 $147.900 $143.200 $140.000
TACK COAT
GAL 9,407.000 $3.900 $4.900 $4.700 $4.600 $4.600 $4.600 $7.700
PLANE & TEXT ASPH CONC PAV(2")
SY 1,153.000 $5.300 $7.300 $13.000 $10.900 $10.000 $7.030 $3.750
PLANE ASPH CONC PAV(12")
SY 22,048.000 $9.000 $11.750 $7.000 $12.300 $11.000 $8.850 $8.250
CONC PVMT (CRCP) (9")
SY 2,581.000 $101.000 $86.000 $88.000 $122.000 $85.000 $89.480 $120.000
CONC PVMT (CRCP) (13")
SY 237,716.000 $100.000 $90.000 $88.000 $99.000 $90.000 $87.000 $124.000
FULL - DEPTH REPAIR CRCP (13")
CY 248.000 $805.000 $1,965.000 $1,100.000 $1,110.000 $1,400.000 $1,791.000 $660.000
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
CY 84.000 $2,450.000 $965.000 $1,250.000 $1,440.000 $1,800.000 $2,312.000 $680.000
CUT & RESTORING PAV
SY 507.000 $699.000 $233.000 $700.000 $165.000 $130.000 $135.170 $430.000
CEM STABIL BKFL
CY 4,792.000 $208.000 $115.000 $300.000 $221.000 $200.000 $158.530 $215.000
FLOWABLE BACKFILL
CY 398.000 $300.000 $200.000 $310.000 $233.000 $220.000 $165.000 $280.000
TRENCH EXCAVATION PROTECTION
LF 12,747.000 $7.400 $3.260 $4.400 $11.600 $10.000 $12.680 $12.000
TEMPORARY SPL SHORING
SF 79,233.000 $30.700 $35.000 $29.000 $20.000 $42.000 $35.000 $35.000
DRILL SHAFT (18 IN)
LF 400.000 $257.000 $112.000 $107.000 $125.000 $110.000 $132.560 $130.000
DRILL SHAFT (36 IN)
LF 4,410.000 $308.000 $204.000 $207.000 $227.000 $200.000 $205.410 $205.000
DRILL SHAFT (42 IN)
LF 1,752.000 $392.000 $236.000 $247.000 $261.000 $260.000 $273.160 $315.000
DRILL SHAFT (60 IN)
LF 471.000 $500.000 $493.000 $722.000 $447.000 $500.000 $479.160 $590.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 315.000 $553.000 $4,360.000 $572.000 $350.000 $564.050 $572.070 $525.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 320.000 $300.000 $330.000 $246.000 $300.000 $242.550 $247.190 $265.000
CL A CONC (FLUME)
CY 321.800 $831.000 $645.000 $615.000 $623.000 $825.000 $679.230 $520.000
CL B CONC (FLUME)
CY 16.200 $1,820.000 $780.000 $788.000 $824.000 $900.000 $731.420 $585.000
CL C CONC (ABUT)(HPC)
CY 653.800 $1,760.000 $1,498.000 $865.000 $1,730.000 $2,000.000 $1,486.850 $1,100.000
CL C CONC (CAP)(HPC)
CY 482.400 $1,920.000 $1,604.000 $1,395.000 $1,750.000 $2,000.000 $1,559.480 $1,650.000
CL C CONC (COLUMN)(HPC)
CY 486.500 $1,590.000 $1,147.000 $1,190.000 $1,200.000 $1,450.000 $1,350.000 $1,600.000
CL C CONC (FOOTING)(HPC)(MASS)
CY 106.800 $810.000 $1,376.000 $800.000 $1,960.000 $2,000.000 $1,501.590 $1,005.000
CL C CONC (RAIL FOUNDATION)
CY 1,045.700 $699.000 $742.000 $560.000 $616.000 $1,100.000 $906.390 $525.000
CL F CONC (CAP)(INVT)(HPC)
CY 76.200 $2,060.000 $1,827.000 $1,590.000 $1,560.000 $3,000.000 $2,268.800 $265.000
CL F CONC (CAP)(STRDL)(HPC)
CY 73.900 $2,060.000 $2,007.000 $1,850.000 $1,590.000 $3,300.000 $2,406.790 $520.000
REINF CONC SLAB (HPC)
SF 134,333.000 $23.500 $27.500 $21.000 $30.500 $35.000 $25.700 $585.000
REINF CONC SLAB (EXTEND SLAB)(HPC)
SF 7,106.000 $40.000 $62.000 $37.000 $44.750 $68.000 $60.880 $1,100.000
APPROACH SLAB (HPC)
CY 1,020.000 $776.000 $752.000 $915.000 $651.000 $1,200.000 $582.480 $1,650.000
APPROACH SLAB (EXTEND) (HPC)
CY 56.000 $1,080.000 $1,090.000 $1,300.000 $1,010.000 $1,650.000 $669.200 $1,600.000
BRIDGE SIDEWALK(HPC)
SF 4,569.000 $125.000 $12.000 $12.000 $10.500 $28.000 $12.830 $765.000
RETAINING WALL (MSE)
SF 65,789.000 $70.000 $87.000 $96.000 $70.750 $112.000 $82.460 $1,850.000
RETAINING WALL (TEMP WALL)
SF 89,533.000 $20.000 $22.000 $28.500 $20.000 $35.000 $22.720 $1,700.000
RETAINING WALL (DRILL SHAFT) (FASCIA)
SF 932.000 $96.700 $111.000 $111.000 $119.000 $165.000 $131.920 $29.000
PRESTR CONC GIRDER (TX34)
LF 1,809.290 $177.000 $264.000 $229.000 $241.000 $225.000 $263.880 $38.000
PRESTR CONC GIRDER (TX54)
LF 12,141.490 $235.000 $280.000 $220.000 $234.000 $235.000 $268.020 $790.000
PRESTR CONC GIRDER (TX62)
LF 4,591.600 $245.000 $428.000 $286.000 $254.000 $275.000 $377.760 $940.000
EPOXY WATERPROOF FINISH (TY X)
SF 16,341.100 $10.500 $6.300 $5.800 $2.000 $5.000 $5.500 $16.500
CONC STR REPAIR (EPOXY MORTAR)
SF 22.600 $200.000 $547.000 $210.000 $450.000 $450.000 $167.000 $264.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 23.600 $540.000 $535.000 $220.000 $450.000 $450.000 $210.000 $250.000
RIPRAP (CONC)(4 IN)
CY 2,113.300 $775.000 $630.000 $460.000 $473.000 $550.000 $531.630 $570.000
RIPRAP (CONC)(5 IN)
CY 40.000 $1,060.000 $855.000 $555.000 $501.000 $600.000 $533.460 $530.000
RIPRAP (MOW STRIP)(4 IN)
CY 944.500 $788.000 $695.000 $535.000 $555.000 $640.000 $632.410 $575.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 1,025.000 $213.000 $186.000 $105.000 $334.000 $270.000 $189.570 $215.000
CLEANING AND SEALING EXISTING JOINTS
LF 185.400 $54.000 $70.000 $42.000 $40.000 $65.000 $65.000 $44.000
RAIL (TY T221)
LF 38.000 $190.000 $86.000 $92.000 $278.000 $420.000 $163.280 $80.000
RAIL (TY SSTR)
LF 19,949.000 $86.500 $68.000 $76.000 $51.250 $75.000 $70.000 $70.000
RAIL (TY SSTR)(HPC)
LF 4,650.100 $107.000 $89.000 $99.000 $63.250 $75.000 $78.750 $80.000
RAIL (TY C221)
LF 961.000 $174.000 $135.000 $130.000 $124.000 $135.000 $179.070 $80.000
RAIL (TY C221)(HPC)
LF 1,143.000 $249.000 $154.000 $149.000 $108.000 $135.000 $187.060 $200.000
RAIL (TY PR11)
LF 54.000 $213.000 $167.000 $178.000 $169.000 $169.000 $240.630 $137.500
RAIL (CLF-RO)
LF 200.000 $137.000 $197.000 $182.000 $183.000 $160.000 $200.000 $165.000
RAIL (TY T80PP)
LF 1,203.000 $133.000 $153.000 $185.000 $128.000 $200.000 $198.000 $182.000
RAIL (TY T80PP-TS)
LF 736.000 $527.000 $458.000 $420.000 $418.000 $400.000 $379.000 $192.500
RAIL (CLF-RO)(MOD)
LF 200.000 $82.000 $233.000 $210.000 $212.000 $185.000 $250.000 $192.500
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,228.000 $237.000 $199.000 $183.000 $286.000 $220.000 $199.340 $220.000
CONC BOX CULV (5 FT X 2 FT)
LF 266.000 $440.000 $290.000 $550.000 $461.000 $1,200.000 $559.760 $610.000
CONC BOX CULV (6 FT X 4 FT)
LF 382.000 $685.000 $495.000 $900.000 $519.000 $530.000 $890.550 $1,110.000
CONC BOX CULV (10 FT X 9 FT)
LF 782.000 $2,500.000 $1,110.000 $2,200.000 $1,360.000 $1,700.000 $1,894.000 $3,000.000
MANH (COMPL)(PRM)(48IN)
EA 8.000 $7,260.000 $8,155.000 $5,900.000 $7,630.000 $6,350.000 $4,486.530 $11,050.000
MANH (COMPL)(PRM)(60IN)
EA 17.000 $9,480.000 $8,185.000 $7,500.000 $10,280.000 $9,000.000 $7,154.720 $17,000.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 39.000 $7,200.000 $9,365.000 $6,500.000 $5,520.000 $8,000.000 $6,456.100 $7,315.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 2.000 $10,280.000 $6,395.000 $7,700.000 $7,900.000 $11,000.000 $7,851.120 $10,700.000
JCTBOX(COMPL)(PJB)(5FTX6FT)
EA 1.000 $11,500.000 $8,060.000 $12,200.000 $9,790.000 $14,000.000 $9,957.130 $13,600.000
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 1.000 $12,000.000 $8,060.000 $12,900.000 $11,590.000 $15,500.000 $10,173.130 $13,500.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 4.000 $9,310.000 $8,170.000 $7,000.000 $8,970.000 $8,750.000 $8,534.350 $10,500.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 12.000 $8,800.000 $8,670.000 $7,300.000 $8,940.000 $10,500.000 $8,821.850 $11,000.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 2.000 $9,630.000 $8,430.000 $7,500.000 $9,480.000 $10,500.000 $9,039.840 $10,200.000
INLET (COMPL)(PCU)(4FT)(LEFT)
EA 6.000 $7,300.000 $9,725.000 $8,600.000 $10,360.000 $13,300.000 $9,893.360 $14,500.000
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 1.000 $11,900.000 $8,905.000 $8,900.000 $10,180.000 $18,000.000 $9,717.900 $12,800.000
INLET (COMPL)(POD)(FG)(3FTX3FT)
EA 1.000 $6,800.000 $6,980.000 $5,200.000 $9,520.000 $7,100.000 $8,970.450 $10,600.000
INLET (COMPL)(POD)(FG)(4FTX4FT)
EA 2.000 $9,300.000 $11,350.000 $6,200.000 $11,340.000 $8,000.000 $10,777.090 $15,600.000
INLET (COMPL)(POD)(SFG)(4FTX4FT)
EA 1.000 $9,300.000 $7,710.000 $6,200.000 $11,330.000 $11,000.000 $10,662.450 $15,750.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 36.000 $7,520.000 $6,775.000 $5,900.000 $7,600.000 $8,000.000 $8,325.280 $8,900.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 9.000 $8,380.000 $7,710.000 $7,900.000 $8,640.000 $10,000.000 $9,342.780 $12,350.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 33.000 $7,980.000 $7,265.000 $6,500.000 $8,180.000 $7,600.000 $8,500.780 $9,700.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 7.000 $8,380.000 $9,165.000 $7,900.000 $8,690.000 $9,500.000 $10,229.960 $14,150.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 6.000 $9,510.000 $8,185.000 $7,400.000 $8,250.000 $12,100.000 $8,883.280 $11,800.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $5,622.000 $7,100.000 $5,900.000 $7,380.000 $9,000.000 $9,297.150 $9,300.000
INLET (COMPL) (TY MSE2)
EA 29.000 $14,830.000 $8,955.000 $6,200.000 $14,770.000 $14,332.670 $8,804.000 $12,025.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 1.000 $6,000.000 $3,760.000 $9,400.000 $14,210.000 $6,750.000 $12,211.680 $6,100.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 2.000 $8,100.000 $5,530.000 $10,100.000 $14,210.000 $8,100.000 $13,022.450 $7,800.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $15,000.000 $19,650.000 $24,000.000 $19,501.540 $15,000.000 $23,101.240 $15,500.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $18,000.000 $31,510.000 $26,000.000 $30,440.000 $25,000.000 $31,709.770 $25,650.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $24,000.000 $46,365.000 $38,000.000 $78,500.000 $36,000.000 $44,770.390 $41,400.000
WINGWALL (PW - 1) (HW=18 FT)
EA 1.000 $75,000.000 $369,075.000 $290,000.000 $217,900.000 $500,000.000 $289,456.000 $168,500.000
WINGWALL (PW - 1) (HW=23 FT)
EA 1.000 $80,000.000 $723,000.000 $315,000.000 $308,700.000 $600,000.000 $401,327.000 $480,350.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 2.000 $2,760.000 $1,215.000 $2,600.000 $2,050.000 $2,650.000 $1,880.220 $1,260.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,400.000 $1,215.000 $2,600.000 $2,050.000 $3,350.000 $1,880.240 $1,260.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,700.000 $1,480.000 $2,500.000 $2,080.000 $3,400.000 $1,897.600 $1,275.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $3,020.000 $1,635.000 $2,700.000 $2,360.000 $3,600.000 $2,067.840 $1,480.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $3,020.000 $1,640.000 $2,700.000 $2,360.000 $3,400.000 $2,067.830 $1,480.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $2,500.000 $1,845.000 $3,700.000 $4,110.000 $3,800.000 $3,727.760 $2,325.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $4,980.000 $2,210.000 $4,200.000 $5,360.000 $4,300.000 $3,550.160 $3,225.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $5,945.000 $4,305.000 $4,600.000 $7,170.000 $6,600.000 $5,650.540 $4,525.000
THERMOPLASTIC PIPE (HDPE) (24")
LF 1,674.000 $100.000 $80.000 $190.000 $102.000 $110.000 $75.000 $180.000
THERMOPLASTIC PIPE (HDPE) (36")
LF 481.000 $130.000 $115.000 $300.000 $102.000 $168.000 $95.000 $335.000
ADJUSTING INLETS
EA 2.000 $3,260.000 $2,575.000 $3,100.000 $5,300.000 $5,500.000 $10,015.900 $1,800.000
ADJUSTING INLETS (CAP)
EA 5.000 $3,260.000 $2,575.000 $2,100.000 $5,300.000 $6,500.000 $5,006.360 $5,900.000
CLEAN EXIST CULVERTS
EA 44.000 $14,200.000 $7,000.000 $1,400.000 $3,020.000 $5,000.000 $3,400.000 $4,700.000
REMOV STR (INLET)
EA 35.000 $1,939.000 $998.000 $950.000 $2,230.000 $950.000 $946.110 $950.000
REMOV STR (MANHOLE)
EA 2.000 $2,000.000 $1,066.000 $1,500.000 $1,830.000 $1,750.000 $942.690 $950.000
REMOV STR (SET)
EA 19.000 $1,170.000 $650.000 $890.000 $1,160.000 $850.000 $515.770 $800.000
REMOV STR (WINGWALL)
EA 10.000 $3,280.000 $1,730.000 $6,900.000 $2,160.000 $3,500.000 $6,453.630 $2,350.000
REMOV STR (HEADWALL)
EA 3.000 $4,050.000 $1,730.000 $3,200.000 $2,390.000 $3,000.000 $6,453.630 $2,350.000
REMOV STR (PIPE)
LF 5,844.000 $31.200 $17.000 $23.000 $47.500 $30.000 $35.460 $18.750
REMOV STR (BOX CULVERT)
LF 758.000 $110.000 $36.000 $200.000 $145.000 $170.000 $86.130 $25.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 6.000 $100,900.000 $80,000.000 $125,000.000 $101,700.000 $81,500.000 $76,543.000 $27,500.000
REMOVE STR (RAIL)
LF 632.000 $79.400 $16.000 $20.000 $23.100 $170.000 $28.590 $6.000
REMOVE STR (DRIVEWAY CULVERT)
EA 3.000 $435.000 $723.000 $1,260.000 $604.000 $4,150.000 $1,809.600 $1,250.000
MOBILIZATION
LS 1.000 $13,960,502.680 $12,000,000.000 $13,200,000.000 $13,600,000.000 $13,000,000.000 $14,044,222.730 $14,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 45.000 $30,000.000 $40,250.000 $20,000.000 $41,970.000 $100,000.000 $60,700.000 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $22,500.000 $18,915.000 $23,000.000 $25,100.000 $9,000.000 $18,402.500 $15,000.000
TMA (STATIONARY)
DAY 800.000 $485.000 $255.000 $190.000 $25.000 $250.000 $304.180 $250.000
TMA (MOBILE OPERATION)
DAY 400.000 $200.000 $953.000 $650.000 $85.000 $1,220.000 $304.180 $350.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,005.000 $63.300 $70.500 $65.000 $35.000 $35.000 $45.000 $71.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,650.000 $66.000 $103.000 $94.000 $70.000 $38.000 $60.000 $105.000
ROCK FILTER DAMS (REMOVE)
LF 2,655.000 $25.500 $28.200 $26.000 $25.000 $2.000 $10.000 $30.000
TEMP PAVED FLUME (INSTALL)
SY 335.000 $30.000 $66.000 $105.000 $75.000 $195.000 $80.000 $58.000
TEMP PAVED FLUME (REMOVE)
SY 336.000 $10.000 $9.450 $10.000 $35.000 $5.000 $21.460 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,000.000 $33.200 $40.550 $37.000 $16.000 $37.000 $30.000 $41.000
CONSTRUCTION EXITS (REMOVE)
SY 1,000.000 $8.800 $12.800 $12.000 $10.500 $5.000 $10.000 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 33,806.000 $4.300 $3.700 $3.500 $2.250 $3.000 $3.950 $3.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 33,806.000 $0.700 $1.050 $1.000 $0.750 $0.100 $0.950 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,888.000 $4.600 $6.500 $6.000 $5.000 $3.000 $5.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,888.000 $1.200 $1.250 $1.120 $0.750 $0.250 $1.000 $1.250
CONSTRUCTING DETOURS
SY 20,891.000 $100.000 $132.000 $108.000 $141.000 $135.000 $103.690 $120.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 47,900.000 $30.000 $10.000 $50.000 $25.800 $10.000 $39.370 $90.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 150.000 $50.000 $4.800 $70.000 $34.000 $10.000 $56.880 $95.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,120.000 $49.900 $77.000 $84.000 $25.400 $40.000 $57.670 $101.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 120.000 $63.200 $81.000 $76.000 $87.500 $90.000 $72.530 $92.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 95,580.000 $9.000 $3.600 $10.000 $6.950 $5.000 $19.560 $8.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 930.000 $7.400 $6.700 $11.000 $13.600 $5.000 $17.390 $9.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 21,560.000 $6.200 $4.400 $6.000 $10.200 $5.000 $9.420 $8.500
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 540.000 $11.000 $11.700 $9.000 $16.200 $5.000 $16.180 $8.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 47,900.000 $17.000 $5.800 $12.500 $9.200 $5.000 $9.540 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 150.000 $6.700 $7.000 $9.000 $15.000 $5.000 $37.740 $17.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,120.000 $8.300 $5.800 $14.000 $13.000 $5.000 $13.060 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 120.000 $20.400 $11.000 $14.000 $15.800 $5.000 $26.840 $21.000
PORT CTB(FUR & INSTL)(F-SHAPE)(TY T)
LF 1.000 $69.200 $1,423.000 $575.000 $1,500.000 $150.000 $5,000.000 $1,900.000
PORT CTB(MOVE)(F-SHAPE)(TY T)
LF 2.000 $51.400 $113.000 $205.000 $150.000 $5.000 $2,500.000 $585.000
PORT CTB(REMOVE)(F-SHAPE)(TY T)
LF 1.000 $82.400 $300.000 $320.000 $1,000.000 $5.000 $3,000.000 $1,200.000
PORT CTB (PINNING)
EA 1,736.000 $13.000 $94.050 $65.000 $9.800 $120.000 $57.820 $110.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 14,617.000 $99.000 $93.000 $96.000 $83.000 $90.000 $70.000 $88.000
CONC CURB (MONO) (TY II)
LF 1,200.000 $9.300 $0.700 $5.000 $8.200 $1.000 $3.900 $10.000
CONC CURB & GUTTER (TY II)
LF 8,035.000 $45.500 $30.000 $17.000 $44.500 $35.000 $31.700 $22.000
DRIVEWAYS (CONC)
SY 1,989.000 $102.000 $107.000 $90.000 $108.000 $100.000 $98.480 $82.500
CONC SIDEWALKS (4")
SY 3,912.500 $97.000 $62.200 $50.000 $79.750 $70.000 $73.210 $55.000
CURB RAMPS (TY 1)
EA 4.000 $3,780.000 $2,575.000 $2,600.000 $3,050.000 $2,900.000 $2,609.260 $2,000.000
CURB RAMPS (TY 2)
EA 2.000 $4,160.000 $2,575.000 $3,400.000 $2,480.000 $2,900.000 $2,609.270 $2,750.000
CURB RAMPS (TY 6)
EA 4.000 $6,050.000 $1,470.000 $4,000.000 $4,730.000 $2,900.000 $2,609.260 $3,300.000
CURB RAMPS (TY 7)
EA 8.000 $3,790.000 $2,785.000 $3,400.000 $2,970.000 $2,900.000 $2,609.260 $3,900.000
MILL RUMBLE STRIPS (CONC) (SHLDR)
LF 63,069.000 $0.600 $1.050 $0.750 $0.800 $0.500 $0.640 $0.600
MTL W-BEAM GD FEN (STEEL POST)
LF 12,562.500 $25.800 $30.750 $30.000 $27.500 $27.500 $29.500 $32.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 41.000 $2,670.000 $2,470.000 $2,300.000 $2,100.000 $2,100.000 $2,250.000 $2,615.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 33.000 $1,440.000 $1,530.000 $1,250.000 $1,350.000 $1,350.000 $1,200.000 $1,320.000
REMOVE METAL BEAM GUARD FENCE
LF 11,712.500 $2.300 $2.100 $2.600 $2.000 $2.000 $2.500 $2.750
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $212.000 $210.000 $128.000 $200.000 $200.000 $125.000 $140.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $212.000 $210.000 $154.000 $200.000 $200.000 $150.000 $165.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 27.000 $179.000 $210.000 $254.000 $150.000 $150.000 $250.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 44.000 $2,910.000 $3,430.000 $3,100.000 $3,100.000 $3,100.000 $3,000.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 25.000 $212.000 $210.000 $254.000 $200.000 $200.000 $250.000 $275.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 43.000 $2,350.000 $1,175.000 $1,900.000 $1,700.000 $1,250.000 $1,204.010 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 24.000 $1,170.000 $785.000 $820.000 $1,110.000 $1,500.000 $846.000 $400.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 6.000 $17,440.000 $31,965.000 $38,000.000 $24,850.000 $26,000.000 $27,913.520 $33,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $56,470.000 $31,965.000 $54,000.000 $39,500.000 $29,000.000 $27,403.520 $46,750.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 22.000 $8,000.000 $9,000.000 $7,800.000 $7,350.000 $5,500.000 $7,725.310 $11,000.000
PIPE UNDERDRAINS (TY 7) (6")
LF 31,841.000 $36.000 $23.950 $33.000 $37.250 $35.000 $15.000 $30.000
RELOCATE RD IL ASM (SHOE-BASE)
EA 1.000 $2,064.000 $1,330.000 $4,100.000 $2,500.000 $3,985.000 $3,985.000 $2,750.000
REMOVE RD IL ASM (TRANS-BASE)
EA 33.000 $550.000 $1,030.000 $475.000 $650.000 $460.000 $460.000 $550.000
IN RD IL (TY SP) 38S-8-8 (250W EQ) LED
EA 14.000 $5,500.000 $7,225.000 $5,900.000 $7,000.000 $5,790.000 $5,790.000 $7,260.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 40.000 $6,650.000 $6,030.000 $3,900.000 $4,800.000 $3,800.000 $3,800.000 $5,000.000
CONDT (PVC) (SCH 40) (3")
LF 140.000 $33.400 $26.000 $42.000 $20.000 $41.000 $41.000 $22.000
CONDT (PVC) (SCH 80) (2")
LF 15,200.000 $42.700 $16.500 $16.000 $10.500 $15.650 $15.650 $22.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,340.000 $41.720 $25.050 $36.000 $22.500 $34.800 $34.800 $55.000
CONDT (PVC) (SCH 80) (3")
LF 10.000 $21.000 $47.500 $75.000 $30.000 $74.300 $74.300 $33.000
CONDUIT (PREPARE)
LF 1,135.000 $2.500 $2.100 $1.100 $4.000 $1.050 $1.050 $3.300
ITS MULTI-DUCT CND (PVC-80)
LF 10,015.000 $39.000 $28.550 $41.000 $40.000 $40.300 $40.300 $44.000
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 710.000 $60.000 $43.800 $37.000 $36.250 $36.250 $36.250 $66.000
ELEC CONDR (NO.14) BARE
LF 10,735.000 $2.000 $2.500 $1.900 $2.000 $1.800 $1.800 $1.050
ELEC CONDR (NO.6) BARE
LF 17,540.000 $2.700 $2.500 $3.000 $2.500 $2.950 $2.950 $1.950
ELEC CONDR (NO.6) INSULATED
LF 35,200.000 $4.000 $2.700 $3.000 $2.550 $2.950 $2.950 $2.150
ITS GND BOX TY 1 (362422)W/APRON
EA 18.000 $6,820.000 $8,335.000 $4,500.000 $4,430.000 $4,429.000 $4,429.000 $5,500.000
GROUND BOX TY A (122311)W/APRON
EA 29.000 $1,680.000 $1,610.000 $2,000.000 $1,300.000 $1,919.000 $1,919.000 $1,070.000
REMOVE GROUND BOX
EA 1.000 $406.000 $725.000 $465.000 $450.000 $459.000 $459.000 $385.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 3.000 $12,800.000 $10,865.000 $12,400.000 $9,500.000 $12,085.000 $12,085.000 $8,800.000
ALUMINUM SIGNS (TY O)
SF 2,587.000 $35.400 $40.100 $37.000 $37.750 $35.750 $35.750 $31.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 59.000 $689.000 $725.000 $615.000 $635.000 $610.000 $815.000 $675.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 14.000 $783.000 $865.000 $730.000 $755.000 $725.000 $1,033.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 138.000 $765.000 $930.000 $720.000 $744.000 $715.000 $918.000 $790.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $928.000 $960.000 $780.000 $807.000 $775.000 $910.000 $860.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 25.000 $989.000 $1,200.000 $950.000 $984.000 $945.000 $1,160.000 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,220.000 $1,310.000 $1,100.000 $1,130.000 $1,090.000 $1,421.000 $1,200.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 3.000 $1,490.000 $2,330.000 $2,265.000 $2,350.000 $2,255.000 $2,870.000 $2,500.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 5.000 $2,270.000 $2,565.000 $2,400.000 $2,480.000 $2,380.000 $3,136.000 $2,620.000
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
EA 1.000 $2,555.000 $2,670.000 $2,400.000 $2,480.000 $2,380.000 $3,190.000 $2,620.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 7.000 $3,780.000 $2,015.000 $3,400.000 $3,090.000 $3,270.000 $3,270.000 $3,265.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $671.670 $715.000 $605.000 $619.000 $595.000 $1,223.000 $660.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $525.000 $825.000 $805.000 $828.000 $795.000 $2,009.000 $875.000
REMOVE SM RD SN SUP&AM
EA 227.000 $86.900 $111.000 $83.000 $82.250 $79.000 $153.100 $100.000
REMOVE LRSA
EA 9.000 $1,410.000 $1,020.000 $935.000 $920.000 $920.000 $920.000 $605.000
INS OH SN SUP(25 FT CANT)
EA 22.000 $35,480.000 $38,900.000 $32,000.000 $30,730.000 $30,730.000 $30,521.000 $33,000.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 45.000 $52.400 $53.500 $46.000 $45.000 $45.000 $50.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 175.000 $17.200 $26.600 $21.000 $18.000 $18.000 $40.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 170.000 $22.000 $33.250 $26.000 $25.000 $25.000 $25.000 $27.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 118.000 $17.200 $26.600 $21.000 $18.000 $18.000 $40.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 255.000 $17.200 $26.600 $21.000 $18.000 $18.000 $25.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 66.000 $22.000 $33.250 $26.000 $25.000 $25.000 $25.000 $27.500
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 76.000 $52.400 $26.600 $46.000 $18.000 $18.000 $80.000 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 45.000 $110.000 $75.500 $62.000 $65.000 $65.000 $60.000 $66.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 308.000 $50.000 $20.500 $42.000 $29.700 $35.000 $20.000 $22.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 24,559.000 $1.700 $1.050 $1.050 $1.000 $1.000 $1.000 $1.100
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 202.000 $2.000 $2.600 $2.600 $2.500 $2.500 $2.500 $2.750
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 113,618.000 $1.600 $0.900 $0.900 $0.850 $0.850 $0.850 $0.950
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 118,469.000 $1.600 $0.900 $0.900 $0.850 $0.850 $0.850 $0.950
RE PM TY III (W)(6")(SLD)
LF 118,723.000 $1.300 $0.750 $0.740 $0.700 $0.700 $0.700 $0.800
RE PM TY III (W)(6")(BRK)
LF 39,967.000 $1.700 $0.800 $0.780 $0.750 $0.750 $0.750 $0.850
RE PM TY III (W)(6")(DOT)
LF 244.000 $2.900 $2.600 $2.600 $2.500 $2.500 $2.500 $2.750
RE PM TY III (W)(8")(SLD)
LF 24,814.000 $2.000 $1.250 $1.250 $1.200 $1.200 $1.200 $1.350
RE PM TY III (W)(12")(SLD)
LF 4,233.000 $6.500 $6.850 $6.700 $6.550 $6.550 $6.550 $7.200
RE PM TY III (W)(12")(DOT)
LF 797.000 $2.500 $3.950 $4.000 $3.800 $3.800 $3.800 $4.200
RE PM TY III (W)(24")(SLD)
LF 853.000 $12.300 $9.400 $9.300 $9.000 $9.000 $9.000 $10.000
RE PM TY III (Y)(6")(SLD)
LF 119,826.000 $1.300 $0.750 $0.740 $0.700 $0.700 $0.700 $0.800
RE PM TY III (Y)(8")(SLD)
LF 246.000 $3.000 $3.150 $3.100 $3.000 $3.000 $3.000 $3.300
RE PM TY III (Y)(12")(SLD)
LF 524.000 $1.410 $9.400 $9.200 $9.000 $9.000 $9.000 $10.000
RE PM TY III (W)(ARROW)
EA 42.000 $285.000 $270.400 $267.000 $260.000 $260.000 $260.000 $290.000
RE PM TY III (W)(WORD)
EA 25.000 $424.000 $280.800 $278.000 $270.000 $270.000 $270.000 $300.000
RE PM TY III (W)(NUMBER)
EA 8.000 $290.000 $105.000 $105.000 $100.000 $100.000 $100.000 $110.000
RE PM TY III (BLK)(6")(SHADOW)
LF 39,967.000 $1.300 $0.900 $0.900 $0.850 $0.850 $0.850 $0.950
REFL PAV MRKR TY II-C-R
EA 3,238.000 $7.200 $5.050 $5.000 $4.850 $4.850 $4.850 $5.350
ELIM EXT PM & MRKS (4")
LF 80,082.000 $0.870 $0.550 $0.550 $0.500 $0.500 $0.500 $0.550
ELIM EXT PM & MRKS (6")
LF 14,394.000 $1.800 $0.550 $0.550 $0.500 $0.500 $0.500 $0.550
ELIM EXT PM & MRKS (8")
LF 6,384.000 $1.300 $1.050 $1.000 $1.000 $0.980 $0.980 $1.100
ELIM EXT PM & MRKS (12")
LF 3,675.000 $2.600 $2.600 $2.600 $2.500 $2.500 $2.500 $4.150
ELIM EXT PM & MRKS (24")
LF 322.000 $5.100 $5.200 $5.100 $5.000 $5.000 $5.000 $5.500
ELIM EXT PM & MRKS (ARROW)
EA 8.000 $130.000 $105.000 $105.000 $100.000 $100.000 $100.000 $110.000
ELIM EXT PM & MRKS (NUMBER)
EA 1.000 $150.000 $260.000 $255.000 $250.000 $250.000 $250.000 $275.000
ELIM EXT PM & MRKS (WORD)
EA 2.000 $160.000 $260.000 $255.000 $250.000 $250.000 $250.000 $275.000
PAV SURF PREP FOR MRK (6")
LF 318,816.000 $0.300 $0.160 $0.170 $0.150 $0.150 $0.150 $0.200
PAV SURF PREP FOR MRK (8")
LF 25,060.000 $0.500 $0.210 $0.210 $0.200 $0.200 $0.200 $0.250
PAV SURF PREP FOR MRK (12")
LF 4,757.000 $2.000 $0.520 $0.520 $0.500 $0.500 $0.500 $0.550
PAV SURF PREP FOR MRK (24")
LF 853.000 $3.900 $1.050 $1.050 $1.000 $1.000 $1.000 $1.100
PAV SURF PREP FOR MRK (ARROW)
EA 42.000 $41.700 $26.000 $26.000 $25.000 $25.000 $25.000 $27.500
PAV SURF PREP FOR MRK (NUMBER)
EA 8.000 $60.400 $52.000 $51.000 $50.000 $50.000 $50.000 $55.000
PAV SURF PREP FOR MRK (WORD)
EA 25.000 $85.000 $41.600 $41.000 $40.000 $40.000 $40.000 $45.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 100.000 $3.300 $2.950 $10.000 $3.500 $9.450 $9.450 $2.950
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 2,680.000 $6.000 $5.150 $15.000 $4.500 $14.700 $14.700 $3.600
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,195.000 $3.200 $2.950 $3.400 $2.500 $3.150 $3.150 $2.200
PED POLE ASSEMBLY
EA 1.000 $4,750.000 $3,920.000 $12,900.000 $3,000.000 $12,510.000 $12,510.000 $2,750.000
RELOCATE PED POLE ASSEMBLY
EA 7.000 $4,000.000 $2,690.000 $9,200.000 $2,500.000 $9,050.000 $9,050.000 $1,870.000
REMOVAL OF CABLES
LF 10,435.000 $2.100 $1.460 $0.950 $1.250 $0.900 $0.900 $1.100
RELOCATE OF PEDESTRIAN PUSH BUTTON
EA 10.000 $415.000 $2,500.000 $125.000 $350.000 $121.000 $121.000 $250.000
INSTALL FOUNDATION
EA 1.000 $2,500.000 $14,150.000 $4,200.000 $3,000.000 $4,150.000 $4,150.000 $8,250.000
REMOVE FOUNDATION
EA 1.000 $164.320 $2,175.000 $1,050.000 $620.000 $1,500.000 $1,000.000 $2,000.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 200.000 $187.000 $510.000 $230.000 $750.000 $250.000 $464.340 $350.000
FULL - WIDTH MOWING
CYC 14.000 $5,620.000 $4,650.000 $8,000.000 $5,430.000 $5,000.000 $5,000.000 $5,500.000
LITTER REMOVAL
CYC 14.000 $4,480.000 $2,550.000 $4,400.000 $3,000.000 $750.000 $4,889.510 $7,500.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 4.000 $2,760.000 $3,330.000 $1,250.000 $4,000.000 $750.000 $4,889.510 $3,800.000
DEBRIS REMOVAL (FRONTAGE ROADS)
CYC 4.000 $3,090.000 $3,330.000 $1,250.000 $834.000 $750.000 $4,889.510 $5,700.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
CYC 4.000 $2,430.000 $3,330.000 $1,250.000 $1,000.000 $750.000 $4,889.510 $3,000.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 4.000 $3,210.000 $2,675.000 $900.000 $8,000.000 $2,000.000 $3,600.000 $2,750.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 4.000 $3,880.000 $2,675.000 $3,100.000 $5,000.000 $2,000.000 $3,600.000 $3,000.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 4.000 $2,880.000 $2,675.000 $3,100.000 $3,000.000 $2,000.000 $3,600.000 $2,800.000
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
SF 81,318.000 $0.900 $1.250 $1.200 $0.800 $1.170 $0.750 $1.300
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 264.000 $2.500 $47.250 $15.000 $12.900 $10.000 $50.000 $19.000
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 786.000 $4.300 $63.500 $15.000 $14.900 $15.000 $60.000 $17.000
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 336.000 $4.400 $74.250 $15.000 $18.000 $20.000 $65.000 $20.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 580.000 $600.000 $665.000 $55.000 $150.000 $343.050 $351.990 $150.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 41.000 $84.200 $240.000 $180.000 $225.000 $225.000 $110.000 $150.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 189.000 $400.000 $640.000 $360.000 $365.000 $365.000 $1,000.000 $715.000
REPLACING ELASTOMERIC BEARING PADS
EA 7.000 $9,660.000 $10,610.000 $8,100.000 $8,900.000 $8,900.000 $8,900.000 $8,800.000
CONCRETE BEAM REPAIR
EA 2.000 $7,740.000 $2,980.000 $4,000.000 $2,500.000 $2,500.000 $4,969.000 $1,650.000
NO. OF WORKING DAYS
$/D 30,075.000 $30,075.000 $1,000.000 $1,000.000 $1,000.000 $1,000.000 $1,000.000 $1,150.000
NO. OF DAYS MILESTONE 1
$/D 2,516.000 $2,516.000 $65.000 $46.000 $46.000 $65.000 $65.000 $65.000
STONE COLUMNS (30 IN)
LF 29,985.000 $70.000 $32.100 $35.000 $33.000 $35.260 $18.000 $31.000
REM LEAD-CONTAINING COATING(LOCATION)
EA 2.000 $15,000.000 $10,500.000 $6,500.000 $6,400.000 $6,399.000 $25,000.000 $7,150.000
ITS POLE (40 FT)(RELOCATE)
EA 1.000 $5,240.000 $14,250.000 $5,600.000 $7,500.000 $5,536.000 $5,536.000 $3,685.000
GROUND BOX (PREPARE)
EA 9.000 $600.000 $436.000 $61.000 $300.000 $9.000 $60.000 $400.000
BENT CAP/ABUTMENT CAP CLEANING
EA 2.000 $1,200.000 $3,575.000 $3,200.000 $3,000.000 $3,000.000 $1,500.000 $2,000.000
1
RC PIPE (CL III)(18 IN)
LF 3,979.000 $119.000 $65.000 $68.000 $77.250 $110.000 $92.700 $128.000
1
RC PIPE (CL IV)(18 IN)
LF 156.000 $119.000 $66.500 $151.000 $91.250 $130.000 $135.800 $130.000
1
RC PIPE (CL V)(18 IN)
LF 1,165.000 $119.000 $69.000 $140.000 $96.750 $140.000 $115.360 $132.000
1A
THERMOPLASTIC PIPE (PP) (18")
LF 0.000 $119.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
2
RC PIPE (CL III)(24 IN)
LF 7,940.000 $129.250 $76.500 $88.000 $88.750 $120.000 $102.550 $176.000
2
RC PIPE (CL IV)(24 IN)
LF 166.000 $129.250 $91.000 $180.000 $152.000 $150.000 $130.380 $183.000
2
RC PIPE (CL V)(24 IN)
LF 2,396.000 $129.250 $95.000 $166.000 $113.000 $160.000 $120.940 $192.000
2A
THERMOPLASTIC PIPE (PP) (24")
LF 0.000 $129.250 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
3
RC PIPE (CL III)(30 IN)
LF 1,109.000 $148.000 $98.000 $145.000 $108.000 $155.000 $124.880 $250.000
3
RC PIPE (CL IV)(30 IN)
LF 108.000 $148.000 $115.500 $153.000 $127.000 $270.000 $123.940 $260.000
3
RC PIPE (CL V)(30 IN)
LF 179.000 $148.000 $140.000 $205.000 $159.000 $240.000 $154.950 $275.000
3A
THERMOPLASTIC PIPE (PP) (30")
LF 0.000 $148.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
4
RC PIPE (CL III)(36 IN)
LF 483.000 $170.000 $130.000 $175.000 $158.000 $180.000 $175.630 $330.000
4A
THERMOPLASTIC PIPE (PP) (36")
LF 0.000 $170.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
5
RC PIPE (CL III)(48 IN)
LF 249.000 $206.500 $205.000 $299.000 $238.000 $255.000 $266.650 $600.000
5
RC PIPE (CL V)(48 IN)
LF 34.000 $206.500 $355.000 $405.000 $451.000 $650.000 $453.470 $770.000
5A
THERMOPLASTIC PIPE (PP) (48")
LF 0.000 $206.500 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
Totals: $1,049,321,826.260 $155,588,192.105 $162,377,978.230 $166,303,656.500 $169,755,458.460 $170,680,766.728 $542,970,020.945
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,396,050.27
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,792,100.54
Total: $4,338,150.81