GRAYSON US 82 (0045-18-038)

Items: 49

County: GRAYSON
Length: N/A
Highway: US 82
District: PARIS
Control Number: 0045-18-038
DBE Goal: N/A
Project: NH 2019(723)
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $7,649,584.98
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,649,584.98
$7,390,532.53
Over/Under Est: -3.39% -$259,052.45
Over/Under Est: 1.02% $78,108.91
Amt Left: 4.56% $337,161.36
$8,122,138.84
Over/Under Est: 6.18% $472,553.86
Amt Left: 9.9% $731,606.31
Delta: -5.10% -$394,444.95
$8,442,981.08
Over/Under Est: 10.37% $793,396.10
Amt Left: 14.24% $1,052,448.55
Delta: -3.95% -$320,842.24

Bid Items & Bid Tabulations

49 Total 0 of 49
GRAYSON  |  US 82  |  PARIS  |  0045-18-038  |  04/03/2019  |  $7,649,584.98  |  NH 2019(723)  |  OVERLAY  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
EUROVIA ATLANTIC COAST LLC
JAGOE-PUBLIC COMPANY
RK HALL, LLC
REMOVING CONCRETE(MOW STRIP)
LF 735.000 $8.000 $6.000 $19.000 $35.370 $11.940
REMOVING STAB BASE & ASPH PAV(14")
SY 1,319.000 $4.650 $7.000 $11.000 $8.420 $9.200
EXCAVATION (ROADWAY)
CY 494.000 $14.000 $18.000 $25.000 $18.500 $20.570
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 386.000 $25.000 $73.000 $35.000 $90.000 $30.140
BACKFILL (TY A)
STA 1,206.000 $300.000 $147.000 $250.000 $212.000 $194.090
BROADCAST SEED (TEMP) (WARM)
SY 42,324.000 $0.200 $0.140 $0.130 $0.070 $0.120
BROADCAST SEED (TEMP) (COOL)
SY 42,324.000 $0.100 $0.140 $0.130 $0.070 $0.120
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 84,646.000 $0.250 $0.300 $0.260 $0.210 $0.230
VEGETATIVE WATERING
MG 2,031.000 $13.000 $44.100 $32.000 $23.920 $23.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 25,395.000 $3.600 $3.350 $2.500 $3.500 $4.060
D-GR HMA(SQ) TY-B PG64-22
TON 580.000 $90.000 $94.000 $78.000 $78.000 $101.890
D-GR HMA TY-C SAC-A PG64-22
TON 59,917.000 $72.000 $77.900 $82.000 $92.250 $90.180
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 4,800.000 $65.000 $89.000 $75.000 $60.500 $110.550
PLANE ASPH CONC PAV(0" TO 3")
SY 532,062.000 $2.400 $0.950 $1.270 $1.310 $1.480
CUT & RESTORE ASPH PAVING
SY 27.000 $111.000 $230.000 $150.000 $90.000 $134.710
FLOWABLE BACKFILL
CY 16.000 $125.000 $300.000 $250.000 $246.310 $250.330
RIPRAP (MOW STRIP)(4 IN)
CY 36.000 $455.000 $510.000 $700.000 $1,157.890 $1,015.210
RC PIPE (CL III)(24 IN)
LF 64.000 $70.000 $100.000 $115.000 $158.020 $108.350
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,030.000 $1,500.000 $1,500.000 $1,252.970 $1,360.650
REMOV STR (SET)
EA 2.000 $400.000 $250.000 $400.000 $425.960 $818.070
REMOV STR (PIPE)
LF 54.000 $12.000 $6.000 $23.000 $13.200 $19.510
MOBILIZATION
LS 1.000 $689,318.100 $735,000.000 $600,000.000 $600,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $15,000.000 $19,750.000 $17,000.000 $3,500.000 $14,442.010
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 50.000 $55.000 $89.010 $42.000 $47.370 $46.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $10.000 $26.280 $10.000 $21.050 $11.500
DRIVEWAYS (ACP)
SY 2,136.000 $29.000 $39.100 $45.000 $16.000 $119.450
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 244,972.000 $0.140 $0.150 $0.150 $0.180 $0.090
CABLE BARRIER SYSTEM (TL-3)
LF 703.000 $25.000 $19.000 $14.500 $42.110 $14.330
CABLE BARRIER TERMINAL SECTION (TL-3)
EA 1.000 $3,750.000 $2,600.000 $4,300.000 $5,894.720 $4,777.480
REMOVE CABLE BARRIER
LF 703.000 $7.000 $3.000 $5.000 $11.580 $4.780
REMOVE CABLE BARRIER TERMINAL SECTION
EA 1.000 $1,000.000 $700.000 $1,000.000 $2,105.260 $1,194.370
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 3.000 $85.000 $50.000 $200.000 $94.740 $238.870
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 31,180.000 $0.200 $0.500 $0.550 $0.420 $0.400
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 6,840.000 $0.550 $0.650 $0.700 $0.530 $0.630
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10,745.000 $1.300 $1.000 $2.500 $0.550 $1.010
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 7,455.000 $0.700 $0.840 $0.910 $0.880 $1.120
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 42.000 $105.000 $130.000 $140.000 $142.630 $132.250
REFL PAV MRK TY I (W)(NUMBER)(090MIL)
EA 4.000 $475.000 $226.000 $250.000 $126.320 $178.250
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 42.000 $140.000 $156.000 $170.000 $174.210 $155.250
PAVEMENT SEALER 4"
LF 4,992.000 $0.130 $0.120 $0.130 $0.260 $0.290
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 31,180.000 $0.470 $0.400 $0.430 $0.440 $0.470
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 124,692.000 $0.380 $0.380 $0.410 $0.390 $0.410
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 124,692.000 $0.370 $0.380 $0.410 $0.390 $0.410
REFL PAV MRKR TY II-C-R
EA 3,119.000 $4.050 $5.000 $5.400 $3.680 $3.970
ELIM EXT PAV MRK & MRKS (4")
LF 4,992.000 $0.500 $1.000 $1.100 $1.050 $1.150
PAV SURF PREP FOR MRK (4")
LF 4,992.000 $0.070 $0.200 $0.250 $0.210 $0.290
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,500.000 $16,500.000 $7,500.000 $7,500.000 $7,066.240
TMA (STATIONARY)
DAY 68.000 $250.000 $375.000 $1,000.000 $446.000 $570.500
TMA (MOBILE OPERATION)
DAY 28.000 $250.000 $715.000 $750.000 $1,250.000 $830.710
Totals: $7,649,584.980 $7,390,532.530 $7,727,693.890 $8,122,138.840 $8,442,981.080