GRAY SH 70 (0309-01-048)

Items: 68

County: GRAY
Length: 0.2590 MILES
Highway: SH 70
District: AMARILLO
Control Number: 0309-01-048
DBE Goal: 0.0%
Project: BR 2026(526)
Guaranty: $67,000.00
Time: 135 WORKING DAYS
Engineer's Estimate: $3,424,040.30
Date: 04/08/2026 (2 months ago)
Contract Number: 4263218
Type: BRIDGE MAINTENANCE
Project ID: A00211509
Contract Type: Federal
Project Description: REMOVE ACP, OVERLAY, DECK REPAIR; PAINT STEEL PILES AND BEAMS; RETROFIT RAIL, CHANNEL EROSION MITIGATION; SUBSTRUCTURE REPAIR AND/OR ENCASE PILING, TY X WATERPROOF ABUTMENT CAPS AND BACKWALLS AND BENT CAPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$3,424,040.30
$3,039,519.10
Over/Under Est: -11.23% -$384,521.20
Over/Under Est: -7.93% -$271,537.95
Amt Left: 3.72% $112,983.25
Over/Under Est: -6.22% -$212,991.60
Amt Left: 5.64% $171,529.60
Delta: -1.86% -$58,546.35
$3,236,936.44
Over/Under Est: -5.46% -$187,103.86
Amt Left: 6.5% $197,417.34
Delta: -0.81% -$25,887.74
Over/Under Est: 0.83% $28,380.90
Amt Left: 13.58% $412,902.10
Delta: -6.66% -$215,484.76
Over/Under Est: 3.18% $108,886.61
Amt Left: 16.23% $493,407.81
Delta: -2.33% -$80,505.71
Over/Under Est: 5.89% $201,605.59
Amt Left: 19.28% $586,126.79
Delta: -2.62% -$92,718.98
Over/Under Est: 92.11% $3,153,743.05
Amt Left: 116.41% $3,538,264.25
Delta: -81.42% -$2,952,137.46

Bid Items & Bid Tabulations

68 Total 0 of 68
GRAY  |  SH 70  |  AMARILLO  |  0309-01-048  |  04/08/2026  |  $3,424,040.30  |  BR 2026(526)  |  BRIDGE MAINT  |  135 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
TI-ZACK CONCRETE, LLC
BLACKSMITH VENTURES LLC
RAGLE CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
SOUTHERN ROAD & BRIDGE, LLC
EMBANK (FNL)(OC)(TY A)
CY 121.000 $40.000 $50.000 $30.000 $95.000 $203.550 $120.000 $95.000 $200.000 $195.000
SOIL RET BLKT(SL_MOD_SAND_SHORT_ROLL)
SY 1,847.000 $3.000 $3.000 $3.000 $5.000 $6.900 $5.000 $4.000 $4.390 $65.000
PLANE ASPH CONC PAV(0" TO 3")
SY 2,033.000 $10.000 $10.000 $12.000 $19.000 $14.950 $14.000 $15.000 $15.380 $15.000
FULL - DEPTH REPAIR CRCP (13")
SY 36.000 $350.000 $400.000 $250.000 $983.000 $632.500 $260.000 $540.000 $401.500 $1,500.000
CL C CONC (CAP)(EXTEND)
CY 1.400 $5,000.000 $15,000.000 $5,000.000 $24,101.000 $2,875.000 $20,000.000 $5,000.000 $13,860.000 $15,000.000
CL C CONC(PILE ENCASEMENT)
LF 48.000 $350.000 $500.000 $1,200.000 $798.000 $893.550 $900.000 $500.000 $709.500 $1,850.000
EPOXY WATERPROOF FINISH (TY X)
SF 9,722.000 $13.000 $10.000 $9.000 $9.000 $19.550 $8.000 $8.000 $7.570 $15.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 556.000 $180.000 $200.000 $250.000 $162.000 $139.150 $210.000 $120.000 $265.000 $685.000
RIPRAP (CONC)(4 IN)
CY 66.000 $770.000 $810.000 $750.000 $555.000 $632.500 $800.000 $585.000 $808.500 $500.000
RIPRAP (CONC)(5 IN)
CY 13.000 $700.000 $1,000.000 $800.000 $1,933.000 $760.150 $900.000 $1,160.000 $990.000 $500.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 19.000 $260.000 $1,000.000 $350.000 $609.000 $517.500 $300.000 $290.000 $1,100.000 $500.000
ELASTOMERIC BEARING (LAMINATED)
EA 5.000 $1,800.000 $3,000.000 $2,500.000 $1,700.000 $17,250.000 $3,000.000 $3,000.000 $1,850.000 $8,500.000
CLEANING EXISTING JOINTS
LF 88.000 $35.000 $100.000 $65.000 $29.000 $201.250 $90.000 $23.000 $10.000 $85.000
RESIZING AND SEALING JOINTS
LF 76.000 $130.000 $100.000 $225.000 $207.000 $201.250 $120.000 $64.000 $250.000 $85.000
CLEAN AND SEAL JNTS (PAN GIRDERS) (CL7)
LF 276.000 $75.000 $100.000 $65.000 $33.000 $139.150 $60.000 $69.000 $97.000 $95.000
CLEAN AND SEAL EXIST JTS (STRIP SEAL)
LF 96.000 $50.000 $100.000 $75.000 $77.000 $230.000 $150.000 $54.000 $114.000 $225.000
POLYESTER POLYMER CONC OVERLAY
CY 79.000 $8,500.000 $7,000.000 $5,000.000 $6,613.000 $2,875.000 $7,000.000 $6,500.000 $5,500.000 $8,500.000
CLEAN AND PAINT EXIST STR (REF NO. 1)
EA 1.000 $45,000.000 $55,000.000 $60,000.000 $95,125.000 $63,250.000 $40,000.000 $250,000.000 $55,440.000 $250,000.000
CLEAN AND PAINT EXIST STR (REF NO. 2)
EA 1.000 $5,000.000 $20,000.000 $20,000.000 $40,940.000 $23,000.000 $20,000.000 $250,000.000 $16,500.000 $150,000.000
CLEAN AND PAINT EXIST STR (REF NO. 3)
EA 1.000 $54,000.000 $45,000.000 $52,000.000 $40,490.000 $57,500.000 $35,000.000 $155,000.000 $46,200.000 $150,000.000
CLEAN AND PAINT EXIST STR (REF NO. 5)
EA 1.000 $5,000.000 $75,000.000 $90,000.000 $22,929.000 $92,000.000 $60,000.000 $104,000.000 $82,500.000 $150,000.000
RETROFIT RAIL (TY SSTR)
LF 426.000 $200.000 $250.000 $150.000 $243.000 $162.150 $210.000 $175.000 $236.500 $650.000
RETROFIT RAIL (TY T223)(MOD)
LF 630.000 $280.000 $200.000 $165.000 $210.000 $180.550 $230.000 $190.000 $479.600 $650.000
SHOT BLASTING
SY 2,000.000 $10.000 $10.000 $5.000 $5.000 $14.950 $7.000 $4.000 $10.000 $12.000
RAISING EXIST STRUCT
LS 1.000 $75,000.000 $37,000.000 $40,000.000 $133,317.000 $86,250.000 $70,000.000 $50,000.000 $46,000.000 $50,000.000
MOBILIZATION
LS 1.000 $260,000.000 $300,000.000 $300,000.000 $322,000.000 $86,250.000 $306,000.000 $340,000.000 $300,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $18,000.000 $15,100.000 $7,500.000 $8,901.000 $11,500.000 $6,000.000 $22,000.000 $3,300.000 $20,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,500.000 $18,500.000 $5,000.000 $17,330.000 $13,800.000 $22,000.000 $35,000.000 $20,000.000 $12,500.000
TMA (STATIONARY)
DAY 50.000 $200.000 $660.000 $350.000 $390.000 $287.500 $400.000 $325.000 $6,000.000 $500.000
TMA (MOBILE OPERATION)
HR 80.000 $125.000 $82.500 $150.000 $67.000 $138.000 $400.000 $60.000 $50.000 $200.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 6.000 $9,000.000 $5,000.000 $6,000.000 $9,800.000 $5,750.000 $6,000.000 $3,500.000 $6,000.000 $3,500.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 600.000 $130.000 $35.000 $125.000 $127.000 $46.000 $140.000 $80.000 $120.000 $140.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 3,900.000 $40.000 $15.000 $30.000 $38.000 $40.250 $25.000 $40.000 $23.000 $110.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 3,900.000 $9.000 $10.000 $30.000 $9.000 $40.250 $10.000 $7.000 $11.000 $45.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 3,900.000 $30.000 $15.000 $30.000 $38.000 $43.700 $20.000 $10.000 $23.000 $50.000
PORT CTB (CONNECTION HARDWARE)
EA 130.000 $30.000 $50.000 $100.000 $20.000 $28.750 $70.000 $70.000 $20.000 $50.000
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 30.000 $500.000 $300.000 $150.000 $758.000 $1,725.000 $400.000 $245.000 $319.000 $200.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,520.000 $36.000 $31.000 $35.000 $35.000 $51.750 $45.000 $31.000 $34.100 $125.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,200.000 $2,250.000 $2,800.000 $3,176.000 $4,025.000 $4,200.000 $2,250.000 $2,475.000 $5,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,520.000 $6.000 $2.000 $3.000 $2.300 $6.900 $5.000 $2.000 $2.200 $30.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,600.000 $2,300.000 $3,000.000 $2,562.000 $6,900.000 $5,000.000 $2,300.000 $2,530.000 $5,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $400.000 $400.000 $500.000 $459.000 $575.000 $1,000.000 $400.000 $440.000 $5,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $2,500.000 $1,000.000 $3,000.000 $1,612.000 $6,670.000 $3,000.000 $1,250.000 $2,750.000 $12,500.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,980.000 $1,000.000 $2,000.000 $1,316.000 $5,750.000 $2,500.000 $1,050.000 $1,650.000 $7,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $31,000.000 $27,000.000 $33,000.000 $30,483.000 $36,800.000 $32,000.000 $28,350.000 $29,700.000 $50,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $10,000.000 $7,500.000 $11,000.000 $9,464.000 $9,775.000 $6,000.000 $7,600.000 $9,900.000 $10,000.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 18.000 $40.000 $42.000 $50.000 $43.000 $57.500 $100.000 $42.000 $46.200 $8,000.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 40.000 $30.000 $45.000 $55.000 $40.000 $57.500 $100.000 $45.000 $49.500 $5,000.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 10,718.000 $1.500 $0.600 $0.750 $0.600 $0.690 $2.000 $0.390 $0.660 $0.600
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 96.000 $12.000 $20.000 $24.000 $20.000 $23.000 $30.000 $5.500 $22.000 $0.600
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 43,690.000 $1.000 $0.600 $0.750 $0.600 $0.690 $2.000 $0.390 $0.660 $0.600
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,080.000 $8.000 $5.000 $6.000 $5.000 $5.750 $8.000 $3.950 $5.500 $6.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 972.000 $3.000 $3.750 $4.500 $4.000 $4.312 $7.000 $3.050 $4.130 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 2,268.000 $3.000 $3.750 $4.500 $4.000 $4.312 $7.000 $3.050 $4.130 $5.000
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 6,284.000 $1.000 $2.800 $3.350 $3.000 $3.220 $2.000 $0.630 $3.080 $1.000
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 440.000 $1.000 $2.800 $3.350 $3.000 $3.220 $2.000 $0.750 $3.080 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 4,542.000 $1.000 $2.800 $3.350 $3.000 $3.220 $2.000 $0.630 $3.080 $1.000
ELIM EXT PM & MRKS (6")
LF 67,514.000 $0.350 $0.750 $1.000 $0.750 $0.862 $0.800 $0.550 $0.830 $1.000
ELIM EXT PM & MRKS (24")
LF 96.000 $10.000 $6.000 $7.250 $6.000 $6.900 $15.000 $3.500 $6.600 $5.000
PAV SURF PREP FOR MRK (6")
LF 3,553.000 $0.800 $1.000 $1.250 $1.000 $1.150 $1.000 $0.070 $1.100 $0.150
BRIDGE JOINT REPLACEMENT (SEJ)
LF 300.000 $600.000 $300.000 $500.000 $34.000 $178.250 $500.000 $500.000 $875.000 $205.000
CARBON FIBER REINF POLYMER PROTECTION
SF 100.000 $90.000 $100.000 $100.000 $99.000 $134.550 $120.000 $200.000 $102.000 $255.000
CONCRETE BEAM REPAIR
EA 4.000 $5,200.000 $5,000.000 $2,000.000 $2,355.000 $2,875.000 $8,000.000 $5,000.000 $2,300.000 $1,850.000
CONCRETE BEAM REPAIR (CFRP)
EA 15.000 $7,000.000 $8,500.000 $7,000.000 $2,527.000 $5,750.000 $12,000.000 $4,500.000 $4,200.000 $4,500.000
TIED-CONCRETE BLOCK EROSION CONTROL MAT
SF 1,463.000 $20.000 $10.000 $25.000 $45.000 $10.350 $50.000 $30.000 $35.000 $105.000
STEEL BRIDGE ZONE PAINTING
SF 1,748.000 $100.000 $100.000 $90.000 $77.000 $109.250 $60.000 $60.000 $87.100 $185.000
PREFB PV MK W/WNTY TY B (W)(6")(SLD)
LF 3,553.000 $11.000 $8.000 $10.000 $8.000 $9.200 $11.000 $8.000 $8.800 $3.000
PREFB PV MK W/WNTY TY B (Y)(6")(SLD)
LF 3,553.000 $11.000 $8.000 $10.000 $8.000 $9.200 $11.000 $8.000 $8.800 $3.000
Totals: $3,424,040.300 $3,039,519.100 $3,152,502.350 $3,211,048.700 $3,236,936.438 $3,452,421.200 $3,532,926.910 $3,625,645.890 $6,577,783.350
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $11,000.00