GONZALES IH 10 (0535-04-031)

Items: 35

County: GONZALES
Length: N/A
Highway: IH 10
District: YOAKUM
Control Number: 0535-04-031
DBE Goal: N/A
Project: C 535-4-31
Guaranty: N/A
Time: 92 WORKING DAYS
Engineer's Estimate: $2,189,203.75
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: UPGRADE DYNAMIC MESSAGE SIGN BOARDS
Mail/Deliver Bids To: N/A
COVEY MORROW
CHASE HERMES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,189,203.75
$2,182,973.85
Over/Under Est: -0.28% -$6,229.90
$2,318,868.46
Over/Under Est: 5.92% $129,664.71
Amt Left: 6.23% $135,894.61
Subcontractor Percentage Amount
G 6 CONSTRUCTION, INC. 11.13% $242,964.99
Total: 11.13% $242,964.99

Bid Items & Bid Tabulations

35 Total 0 of 35
GONZALES  |  IH 10  |  YOAKUM  |  0535-04-031  |  08/03/2023  |  $2,189,203.75  |  C 535-4-31  |  UPGRADE DYNAMIC MESSAGE SIGN BOARDS  |  92 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRAF-TEX, INC.
THE LEVY COMPANY, INC.
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 239.750 $65.000 $250.000 $83.240
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 302.000 $300.000 $250.000 $342.520
DRILL SHAFT (42 IN)
LF 189.000 $375.000 $775.000 $512.320
DRILL SHAFT (48 IN)
LF 270.000 $475.000 $790.000 $610.400
RIPRAP (CONC)(4 IN)
CY 9.000 $525.000 $1,658.000 $382.910
MOBILIZATION
LS 1.000 $190,000.000 $120,279.000 $231,886.840
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $2,500.000 $3,631.000 $10,348.980
TEMP SEDMT CONT FENCE (INSTALL)
LF 900.000 $10.000 $4.160 $5.530
TEMP SEDMT CONT FENCE (REMOVE)
LF 900.000 $2.500 $1.330 $1.740
MTL W-BEAM GD FEN (TIM POST)
LF 2,500.000 $45.000 $26.630 $23.950
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $2,200.000 $1,691.000 $1,510.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 1.000 $2,700.000 $2,491.000 $2,205.000
REMOVE METAL BEAM GUARD FENCE
LF 175.000 $3.500 $3.570 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,500.000 $3,726.000 $3,260.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $275.000 $354.000 $225.000
CONDT (HDPE) (2") (STL ENCSE)
LF 6,705.000 $50.000 $25.290 $36.970
CONDT (RM) (2")
LF 1,080.000 $50.000 $27.000 $19.660
ELEC CONDR (NO.2) BARE
LF 7,275.000 $5.500 $3.550 $3.430
ELEC CONDR (NO.2) INSULATED
LF 16,030.000 $5.000 $3.780 $3.710
GROUND BOX TY A (122311)W/APRON
EA 18.000 $975.000 $1,349.000 $1,340.890
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 6.000 $6,500.000 $7,843.000 $7,387.110
INS OH SN SUP(25 FT BAL TEE)
EA 9.000 $35,000.000 $53,647.000 $60,897.530
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $8,500.000 $2,134.000 $3,342.100
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 2,120.000 $4.000 $4.830 $7.370
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 490.000 $6.000 $21.210 $13.350
FIBER OPTIC SPLICE ENCLOSURE
EA 9.000 $3,100.000 $1,155.000 $913.530
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 9.000 $1,400.000 $457.000 $963.860
CCTV FIELD EQUIPMENT (DIGITAL)
EA 9.000 $8,750.000 $6,381.000 $9,126.360
CCTV FIELD CONTROLLER
EA 9.000 $4,200.000 $5,725.000 $0.010
INSTALL DMS (FOUNDATION MTD CABINET)
EA 9.000 $12,000.000 $15,420.000 $13,656.500
ITS POLE (55 FT)(90 MPH)
EA 9.000 $24,000.000 $19,314.000 $23,871.040
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 9.000 $6,200.000 $8,153.000 $5,454.350
ETHERNET SWITCH (INSTALL ONLY)
EA 18.000 $400.000 $327.000 $359.330
TMA (STATIONARY)
DAY 27.000 $400.000 $345.000 $247.300
BLUETOOTH DETECTION SYSTEM (INSTALL)
EA 9.000 $2,500.000 $1,567.000 $1,553.280
Totals: $2,189,203.750 $2,182,973.850 $2,318,868.460