GOLIAD CR (0916-26-021)

Items: 41

County: GOLIAD
Length: N/A
Highway: CR
District: CORPUS CHRISTI
Control Number: 0916-26-021
DBE Goal: N/A
Project: BR 2022(443)
Guaranty: N/A
Time: 77 WORKING DAYS
Engineer's Estimate: $677,236.23
Date: 04/07/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$677,236.23
1
$643,104.49
Over/Under Est: -5.04% -$34,131.74
Over/Under Est: -1.41% -$9,527.36
Amt Left: 3.83% $24,604.38
Over/Under Est: 12.19% $82,524.97
Amt Left: 18.14% $116,656.71
Delta: -13.79% -$92,052.33
Over/Under Est: 14.73% $99,776.37
Amt Left: 20.82% $133,908.11
Delta: -2.27% -$17,251.40
$842,810.76
Over/Under Est: 24.45% $165,574.53
Amt Left: 31.05% $199,706.27
Delta: -8.47% -$65,798.16
$900,686.00
Over/Under Est: 32.99% $223,449.77
Amt Left: 40.05% $257,581.51
Delta: -6.87% -$57,875.24

Bid Items & Bid Tabulations

41 Total 0 of 41
GOLIAD  |  CR  |  CORPUS CHRISTI  |  0916-26-021  |  04/07/2022  |  $677,236.23  |  BR 2022(443)  |  BRIDGE REPL  |  77 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
HILL COUNTRY BRIDGE, INC.
CONSTAR CONSTRUCTION
TEXAS STEEL INDUSTRIAL PLACING, LLC
TREVWAY, INC.
CK NEWBERRY, LLC
PREPARING ROW
STA 5.000 $2,000.000 $6,500.000 $1,500.000 $1,300.000 $750.000 $1,000.000 $5,000.000
EXCAVATION (ROADWAY)
CY 253.000 $35.000 $15.000 $12.400 $16.000 $17.500 $10.000 $17.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 642.000 $24.000 $25.000 $16.500 $23.000 $20.000 $34.900 $27.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 950.000 $4.000 $2.150 $0.550 $1.000 $1.500 $4.000 $1.250
BROADCAST SEED (TEMP) (WARM)
SY 237.000 $3.000 $6.450 $2.000 $1.000 $6.000 $4.640 $5.000
BROADCAST SEED (TEMP) (COOL)
SY 237.000 $3.000 $6.450 $2.000 $1.000 $6.000 $3.340 $5.000
VEGETATIVE WATERING
MG 18.000 $75.000 $50.000 $330.000 $100.000 $50.000 $100.000 $15.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 177.000 $10.000 $10.750 $5.150 $10.000 $3.500 $15.000 $3.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 295.000 $112.000 $135.000 $108.400 $120.000 $100.000 $174.000 $125.000
CEMENT
TON 29.000 $200.000 $300.000 $263.250 $300.000 $300.000 $308.000 $200.000
CEMENT TREAT (NEW BASE) (8")
SY 1,184.000 $5.000 $6.000 $5.150 $4.000 $8.000 $21.520 $6.000
PRIME COAT (MC-30)
GAL 237.000 $17.500 $10.000 $16.200 $21.000 $5.000 $20.160 $10.000
ASPH (MULTI OPTION)
GAL 841.000 $9.000 $8.000 $10.400 $13.000 $5.000 $12.910 $6.000
AGGR (MULTI OPTION)
CY 24.000 $500.000 $250.000 $716.000 $930.000 $505.000 $899.000 $400.000
STRUCT EXCAV (BOX)
CY 152.000 $30.000 $20.000 $22.700 $3.000 $25.000 $35.000 $100.000
CEM STABIL BKFL
CY 126.000 $175.000 $180.000 $188.750 $130.000 $150.000 $100.000 $175.000
RIPRAP (CONC)(5 IN)
CY 18.000 $450.000 $435.000 $665.000 $370.000 $600.000 $500.000 $700.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 181.000 $154.000 $195.000 $186.000 $180.000 $210.000 $267.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 246.000 $160.000 $195.000 $186.000 $170.000 $190.000 $234.000 $225.000
RIPRAP (MOW STRIP)(4 IN)
CY 46.000 $520.000 $465.000 $585.000 $500.000 $650.000 $500.000 $700.000
RAIL (TY T223)
LF 241.330 $160.000 $95.000 $113.700 $140.000 $120.000 $111.170 $250.000
CONC BOX CULV (10 FT X 7 FT)
LF 182.000 $900.000 $732.200 $853.000 $1,450.000 $1,500.000 $1,526.270 $1,350.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $51,000.000 $32,719.400 $32,000.000 $45,000.000 $45,000.000 $30,000.000 $60,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $34,000.000 $28,882.000 $31,300.000 $40,000.000 $40,000.000 $30,000.000 $55,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $18,500.000 $25,000.000 $38,850.000 $13,000.000 $25,000.000 $25,000.000 $25,000.000
MOBILIZATION
LS 1.000 $61,566.930 $60,000.000 $66,700.000 $60,000.000 $60,000.000 $83,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $4,000.000 $4,500.000 $2,645.000 $1,500.000 $2,000.000 $2,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 100.000 $35.000 $40.850 $28.750 $20.000 $50.000 $20.000 $46.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $17.200 $13.000 $10.000 $8.000 $10.000 $6.400
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 67.000 $23.000 $32.250 $37.300 $20.000 $30.000 $20.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 67.000 $8.000 $16.120 $19.000 $10.000 $10.000 $19.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $3.500 $4.030 $5.950 $5.000 $5.000 $3.000 $3.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.500 $1.075 $0.940 $1.000 $0.750 $1.000 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $10.000 $10.750 $10.700 $10.000 $10.000 $3.000 $8.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $2.000 $5.375 $5.000 $2.000 $2.000 $1.000 $1.500
MTL W-BEAM GD FEN (TIM POST)
LF 425.000 $38.000 $32.250 $26.350 $35.000 $33.000 $26.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,900.000 $1,290.000 $2,905.000 $3,000.000 $2,500.000 $2,118.000 $2,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,440.000 $3,250.000 $4,700.000 $3,750.000 $2,863.000 $4,000.000
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $53.750 $190.000 $300.000 $100.000 $100.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $34.000 $43.000 $20.000 $30.000 $50.000 $29.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $36.000 $43.000 $25.000 $30.000 $50.000 $29.000 $50.000
Totals: $677,236.230 $643,104.490 $667,708.871 $759,761.200 $777,012.600 $842,810.766 $900,686.000