Show Job Controls
Bid Cobra

GOLIAD CR (0916-26-019)

Items: 39

County: GOLIAD
Length: N/A
Highway: CR
District: CORPUS CHRISTI
Control Number: 0916-26-019
DBE Goal: N/A
Project: BR 2018(845)
Guaranty: N/A
Time: 68 WORKING DAYS
Engineer's Estimate: $481,069.20
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$481,069.20
$518,768.35
Over/Under Est: 7.84% $37,699.15
Over/Under Est: 32.41% $155,926.05
Amt Left: 22.79% $118,226.90
$763,671.92
Over/Under Est: 58.74% $282,602.72
Amt Left: 47.21% $244,903.57
Delta: -19.89% -$126,676.67
Over/Under Est: 71.61% $344,480.30
Amt Left: 59.14% $306,781.15
Delta: -8.10% -$61,877.58
Over/Under Est: 84.2% $405,036.56
Amt Left: 70.81% $367,337.41
Delta: -7.34% -$60,556.26

Bid Items & Bid Tabulations

39 Total 0 of 39
GOLIAD  |  CR  |  CORPUS CHRISTI  |  0916-26-019  |  04/02/2019  |  $481,069.20  |  BR 2018(845)  |  REPLACE BRIDGE AND APPROACHES  |  68 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CONSTAR CONSTRUCTION
HILL COUNTRY BRIDGE, INC.
RELMCO, INC.
FNH CONSTRUCTION, LLC
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 3.500 $3,000.000 $700.000 $5,640.000 $5,000.000 $12,500.000 $2,460.000
REMOVING CONC (RIPRAP)
SY 83.000 $15.000 $24.000 $12.750 $25.000 $30.000 $20.000
EXCAVATION (ROADWAY)
CY 809.000 $10.000 $10.000 $20.200 $15.000 $20.000 $40.000
EXCAVATION (CHANNEL)
CY 551.000 $5.000 $12.000 $26.300 $15.000 $30.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 80.000 $15.000 $17.000 $16.000 $35.000 $40.000 $100.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 7,548.000 $0.100 $0.700 $0.010 $0.500 $2.000 $0.360
FERTILIZER
TON 0.290 $600.000 $675.000 $727.000 $900.000 $3,500.000 $600.000
VEGETATIVE WATERING
MG 122.000 $15.000 $70.000 $21.000 $20.000 $50.000 $10.350
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 501.000 $60.000 $97.000 $91.400 $75.000 $92.500 $85.000
PRIME COAT (MC-30)
GAL 218.000 $4.000 $10.000 $15.950 $8.000 $10.000 $12.000
ASPH (MULTI OPTION)
GAL 426.000 $3.000 $13.000 $6.900 $7.000 $10.000 $12.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 350.000 $3.000 $13.000 $6.900 $7.000 $10.000 $12.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 10.000 $100.000 $250.000 $164.750 $225.000 $300.000 $500.000
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
CY 13.000 $100.000 $250.000 $164.750 $225.000 $300.000 $160.000
CEM STABIL BKFL
CY 163.000 $100.000 $72.000 $133.200 $150.000 $250.000 $118.290
TRENCH EXCAVATION PROTECTION
LF 46.000 $5.000 $15.000 $27.000 $30.000 $50.000 $2.870
RIPRAP (CONC)(4 IN)
CY 48.000 $475.000 $420.000 $520.000 $415.000 $500.000 $428.890
RIPRAP (CONC)(5 IN)
CY 72.000 $450.000 $420.000 $555.000 $415.000 $600.000 $396.800
RAIL (TY T631)
LF 246.000 $100.000 $55.000 $66.150 $75.000 $185.000 $87.530
CONC BOX CULV (10 FT X 7 FT)
LF 184.000 $1,000.000 $1,000.000 $1,049.000 $1,575.000 $1,400.000 $2,100.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $30,000.000 $27,000.000 $47,500.000 $47,500.000 $25,000.000 $42,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $25,000.000 $25,000.000 $40,700.000 $39,500.000 $22,500.000 $38,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $12,000.000 $23,450.000 $35,000.000 $35,000.000 $18,179.010
MOBILIZATION
LS 1.000 $35,500.000 $42,000.000 $63,500.000 $75,000.000 $80,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $1,000.000 $1,200.000 $3,120.000 $5,500.000 $8,500.000 $1,400.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 100.000 $15.000 $27.000 $26.200 $21.850 $30.000 $18.140
CONSTRUCTION EXITS (REMOVE)
SY 100.000 $5.000 $10.000 $11.000 $8.160 $15.000 $6.743
TEMP SEDMT CONT FENCE (INSTALL)
LF 456.000 $3.000 $6.000 $2.800 $3.160 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 456.000 $1.000 $1.000 $0.800 $0.570 $2.000 $0.611
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 240.000 $6.000 $8.000 $5.000 $9.770 $15.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 240.000 $1.000 $2.000 $1.600 $2.300 $10.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,800.000 $3,300.000 $3,150.000 $3,500.000 $2,850.000 $2,702.165
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 14.000 $20.000 $33.000 $53.000 $55.000 $100.000 $21.984
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 702.000 $0.600 $9.000 $2.760 $10.810 $5.000 $0.531
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 702.000 $0.600 $9.000 $2.760 $10.810 $5.000 $0.543
REFL PAV MRKR TY II-A-A
EA 18.000 $3.000 $13.000 $9.350 $115.000 $5.000 $2.871
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $100.000 $130.000 $110.000 $300.000 $150.000 $77.224
TMA (STATIONARY)
DAY 10.000 $75.000 $400.000 $695.000 $300.000 $550.000 $164.411
TMA (MOBILE OPERATION)
HR 50.000 $50.000 $55.000 $69.000 $200.000 $100.000 $295.000
Totals: $481,069.200 $518,768.350 $636,995.250 $763,671.920 $825,549.500 $886,105.788