PREPARING ROW
|
STA
|
262.500
|
$250.000
|
$511.350
|
$38.000
|
$1,100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
49,604.000
|
$8.000
|
$9.180
|
$5.300
|
$12.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
21,691.000
|
$10.000
|
$8.060
|
$7.350
|
$7.000
|
|
|
BACKFILL (TY A)
|
STA
|
259.000
|
$150.000
|
$403.200
|
$236.000
|
$250.000
|
|
|
BLADING
|
HR
|
83.000
|
$100.000
|
$67.200
|
$128.000
|
$100.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
70,782.000
|
$0.350
|
$0.350
|
$0.400
|
$0.480
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
35,391.000
|
$0.300
|
$0.290
|
$0.300
|
$0.430
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
35,391.000
|
$0.300
|
$0.290
|
$0.300
|
$0.430
|
|
|
VEGETATIVE WATERING
|
MG
|
1,761.000
|
$17.000
|
$11.000
|
$33.000
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
36,787.000
|
$1.000
|
$0.750
|
$0.850
|
$1.850
|
|
|
PROOF ROLLING
|
HR
|
83.000
|
$85.000
|
$51.000
|
$90.000
|
$65.000
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
15,879.000
|
$60.000
|
$62.330
|
$70.000
|
$75.000
|
|
|
REWORK BS MTL (TY C) (9") (DENS CONT)
|
SY
|
69,059.000
|
$0.600
|
$1.680
|
$2.550
|
$2.000
|
|
|
CEMENT
|
TON
|
1,168.000
|
$150.000
|
$151.000
|
$166.000
|
$155.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(9")
|
SY
|
142,997.000
|
$2.300
|
$1.570
|
$1.500
|
$2.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
28,603.000
|
$4.250
|
$4.230
|
$3.150
|
$4.300
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
54,420.000
|
$3.000
|
$3.400
|
$2.900
|
$3.600
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
1,052.000
|
$85.000
|
$79.790
|
$140.000
|
$135.000
|
|
|
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
|
CY
|
1,673.000
|
$75.000
|
$71.440
|
$120.000
|
$120.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
37,745.000
|
$75.000
|
$74.780
|
$91.500
|
$86.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
14,462.000
|
$80.000
|
$84.460
|
$105.000
|
$94.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,000.000
|
$50.000
|
$40.190
|
$47.000
|
$50.000
|
|
|
PLANE ASPH CONC PAV (8" TO 16")
|
SY
|
1,141.000
|
$5.000
|
$6.720
|
$14.000
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
152.000
|
$80.000
|
$125.000
|
$184.000
|
$260.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,037.000
|
$15.000
|
$32.000
|
$26.000
|
$28.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,203.000
|
$170.000
|
$195.000
|
$255.000
|
$250.000
|
|
|
CL C CONC (ABUT)
|
CY
|
69.600
|
$800.000
|
$1,047.800
|
$941.000
|
$1,100.000
|
|
|
CL C CONC (CAP)
|
CY
|
107.200
|
$950.000
|
$1,029.600
|
$933.000
|
$950.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
61.500
|
$750.000
|
$1,085.500
|
$1,100.000
|
$850.000
|
|
|
REINF CONC SLAB
|
SF
|
21,000.000
|
$22.000
|
$22.000
|
$25.000
|
$20.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
2,780.000
|
$130.000
|
$135.000
|
$181.000
|
$147.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
36.000
|
$375.000
|
$400.000
|
$589.000
|
$550.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
97.000
|
$500.000
|
$400.000
|
$738.000
|
$510.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
435.000
|
$105.000
|
$115.000
|
$148.000
|
$140.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
147.500
|
$500.000
|
$415.000
|
$562.000
|
$550.000
|
|
|
RAIL (TY T223)
|
LF
|
748.000
|
$100.000
|
$65.000
|
$96.000
|
$100.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
168.000
|
$95.000
|
$65.000
|
$70.000
|
$94.000
|
|
|
CONC BOX CULV(5'X 6.5')
|
LF
|
12.000
|
$650.000
|
$750.000
|
$1,060.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,236.000
|
$65.000
|
$50.000
|
$57.000
|
$62.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
274.000
|
$75.000
|
$81.380
|
$73.000
|
$71.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
206.000
|
$120.000
|
$109.980
|
$103.000
|
$115.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
2.000
|
$25,000.000
|
$11,011.000
|
$17,700.000
|
$16,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
58.000
|
$1,200.000
|
$950.000
|
$1,280.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,500.000
|
$1,025.000
|
$1,650.000
|
$1,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$3,500.000
|
$2,250.000
|
$4,780.000
|
$3,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,500.000
|
$2,250.000
|
$5,170.000
|
$4,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,000.000
|
$1,500.000
|
$1,670.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
32.000
|
$500.000
|
$800.000
|
$400.000
|
$300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
620.000
|
$20.000
|
$10.000
|
$10.000
|
$20.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$120,000.000
|
$100,000.000
|
$52,900.000
|
$100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$1,247,458.050
|
$460,000.000
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$6,000.000
|
$11,083.000
|
$2,380.000
|
$7,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
660.000
|
$25.000
|
$24.000
|
$27.000
|
$33.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
660.000
|
$10.000
|
$8.000
|
$8.930
|
$7.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$15.000
|
$14.000
|
$24.000
|
$13.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$5.000
|
$2.000
|
$7.250
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,207.000
|
$2.500
|
$2.250
|
$2.510
|
$2.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,625.000
|
$1.000
|
$1.000
|
$1.100
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
900.000
|
$5.000
|
$5.750
|
$6.420
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
900.000
|
$1.000
|
$2.000
|
$2.250
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
942.000
|
$30.000
|
$68.090
|
$75.000
|
$50.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
11.000
|
$3,500.000
|
$3,615.000
|
$4,020.000
|
$6,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,500.000
|
$25.000
|
$25.000
|
$36.000
|
$30.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,110.000
|
$10.000
|
$10.000
|
$23.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,500.000
|
$10.000
|
$18.000
|
$14.000
|
$16.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
89.000
|
$50.000
|
$42.400
|
$58.000
|
$64.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
3,705.000
|
$30.000
|
$18.400
|
$34.000
|
$27.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
51,800.000
|
$0.150
|
$0.100
|
$0.200
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
25,900.000
|
$0.150
|
$0.120
|
$0.300
|
$0.240
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,612.500
|
$25.000
|
$19.000
|
$24.000
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,500.000
|
$1,890.000
|
$1,900.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,612.500
|
$5.000
|
$1.390
|
$1.750
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$3,000.000
|
$2,500.000
|
$3,140.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$350.000
|
$225.000
|
$283.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
6.000
|
$20,000.000
|
$7,500.000
|
$7,500.000
|
$8,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,400.000
|
$850.000
|
$840.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,000.000
|
$650.000
|
$228.000
|
$600.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
6.000
|
$240.000
|
$225.000
|
$195.000
|
$180.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$280.000
|
$275.000
|
$250.000
|
$240.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$525.000
|
$500.000
|
$529.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$450.000
|
$600.000
|
$668.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$625.000
|
$600.000
|
$1,090.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$525.000
|
$675.000
|
$807.000
|
$770.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$50.000
|
$60.000
|
$95.000
|
$100.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
10.000
|
$150.000
|
$300.000
|
$278.000
|
$270.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$20.000
|
$10.000
|
$24.000
|
$24.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
17.000
|
$75.000
|
$60.000
|
$89.000
|
$80.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
17.000
|
$10.000
|
$10.000
|
$17.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
53.000
|
$25.000
|
$10.000
|
$28.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
52,500.000
|
$0.250
|
$0.240
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$3.000
|
$6.000
|
$6.700
|
$6.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
54,900.000
|
$0.250
|
$0.240
|
$0.250
|
$0.260
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,632.000
|
$0.650
|
$0.770
|
$0.850
|
$0.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
24.000
|
$4.500
|
$8.000
|
$8.930
|
$8.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
52,430.000
|
$0.300
|
$0.360
|
$0.400
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,130.000
|
$0.300
|
$0.360
|
$0.400
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,070.000
|
$0.300
|
$0.360
|
$0.400
|
$0.380
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
619.000
|
$3.000
|
$4.000
|
$4.460
|
$4.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,900.000
|
$0.950
|
$1.200
|
$2.300
|
$1.300
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
790.000
|
$0.100
|
$0.500
|
$0.550
|
$0.520
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
17,250.000
|
$11.250
|
$4.240
|
$2.950
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
730.000
|
$70.000
|
$70.000
|
$50.000
|
$55.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$6,000.000
|
$16,000.000
|
$100.000
|
$17,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$50.000
|
$40.000
|
$10.000
|
$50.000
|
|
Totals: |
$10,428,571.350
|
$11,249,526.440
|
$11,653,856.305
|
$12,773,223.670
|