Show Job Controls
Bid Cobra

GLASSCOCK RM 33 (0558-06-016)

Items: 69

County: GLASSCOCK
Length: N/A
Highway: RM 33
District: SAN ANGELO
Control Number: 0558-06-016
DBE Goal: N/A
Project: STP 2019(648)
Guaranty: N/A
Time: 124 WORKING DAYS
Engineer's Estimate: $5,711,543.67
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: RESTORATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$5,711,543.67
1
$6,698,938.51
Over/Under Est: 17.29% $987,394.84
$7,258,299.01
Over/Under Est: 27.08% $1,546,755.34
Amt Left: 8.35% $559,360.50
Over/Under Est: 41.69% $2,380,987.13
Amt Left: 20.8% $1,393,592.29
Delta: -11.49% -$834,231.79
Over/Under Est: 45.88% $2,620,348.70
Amt Left: 24.38% $1,632,953.86
Delta: -2.96% -$239,361.57

Bid Items & Bid Tabulations

69 Total 0 of 69
GLASSCOCK  |  RM 33  |  SAN ANGELO  |  0558-06-016  |  03/05/2019  |  $5,711,543.67  |  STP 2019(648)  |  RESTOR OF EXIST ROAD  |  124 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
REECE ALBERT, INC.
DELHUR INDUSTRIES, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
BACKFILL (TY A OR B)
STA 321.040 $275.000 $222.940 $143.570 $375.000 $281.610
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 60.000 $530.000 $412.500 $583.560 $622.980 $433.840
DRILL SEEDING (TEMP) (WARM)
AC 60.000 $530.000 $330.000 $452.020 $482.560 $351.340
DRILL SEEDING (TEMP) (COOL)
AC 60.000 $530.000 $330.000 $452.020 $482.560 $350.780
PROOF ROLLING
HR 39.000 $90.750 $142.440 $83.160 $120.000 $79.190
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 13,149.000 $10.000 $9.630 $14.060 $10.140 $17.090
FL BS (CMP IN PLACE)(TY A GR 1-2)(7")
SY 113,569.000 $10.000 $11.330 $10.900 $10.140 $17.510
REWORK BS MTL (TY C) (6") (DENS CONT)
STA 256.000 $550.000 $1,178.890 $1,106.250 $672.000 $1,082.400
ASPH (RC-250)
GAL 36,603.000 $4.000 $4.700 $5.390 $5.620 $4.980
AGGR(TY-PB GR-3 SAC-B)
CY 3,438.000 $125.000 $153.350 $98.920 $131.560 $163.080
AGGR(TY-PB GR-4 SAC-B)
CY 946.000 $110.000 $148.620 $98.920 $131.560 $176.660
AGGR(TY-PB GR-5 SAC-B)
CY 1,192.000 $127.750 $201.330 $210.920 $131.560 $187.850
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 202,014.000 $3.400 $3.760 $4.160 $4.260 $4.470
SUPERPAVE MIXTURES SP-B PG70-22
TON 6,937.000 $95.000 $100.370 $145.310 $120.950 $134.010
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 4,555.000 $95.000 $109.760 $150.310 $120.950 $135.710
PLANE ASPH CONC PAV (4")
SY 27,555.000 $2.500 $2.820 $3.330 $1.380 $3.170
PLANE ASPH CONC PAV (2"-3")
SY 444.000 $6.120 $8.900 $8.830 $1.380 $20.110
PLANE ASPH CONC PAV (4" TO 11")
SY 1,556.000 $3.000 $10.980 $6.420 $4.840 $9.120
PLANE ASPH CONC PAV (11")
SY 11,593.000 $5.000 $9.380 $7.880 $4.840 $6.590
RIPRAP (CONC)(5 IN)
CY 50.000 $605.000 $522.500 $533.940 $570.000 $630.300
CLEAN EXIST CULVERTS
EA 17.000 $2,200.000 $4,400.000 $1,686.110 $1,800.000 $5,115.830
MOBILIZATION
LS 1.000 $430,000.000 $393,953.530 $526,000.000 $1,181,250.000 $636,136.820
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $11,000.000 $35,008.430 $41,862.210 $45,567.150 $10,864.380
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,100.000 $5.250 $7.460 $5.630 $9.600 $13.310
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,100.000 $1.100 $1.750 $2.540 $3.600 $2.310
DRIVEWAYS (SURF TREAT)
SY 12,936.000 $20.000 $7.440 $9.260 $36.000 $32.780
DRIVEWAYS (CONC) (HES)
SY 403.000 $85.250 $115.500 $118.030 $126.000 $163.010
MTL W-BEAM GD FEN (STEEL POST)
LF 550.000 $31.000 $30.800 $31.470 $31.320 $28.940
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 86.000 $76.930 $82.500 $84.310 $72.000 $67.450
REMOVE METAL BEAM GUARD FENCE
LF 750.000 $2.500 $2.200 $2.250 $3.600 $3.470
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,125.400 $3,575.000 $3,653.240 $360.000 $361.170
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $725.000 $935.000 $955.460 $1,020.000 $941.560
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $1,000.000 $1,017.500 $1,039.770 $1,110.000 $1,035.310
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $450.000 $836.000 $854.300 $912.000 $877.560
REMOVE SM RD SN SUP&AM
EA 25.000 $105.000 $110.000 $224.810 $120.000 $114.990
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 10.000 $31.500 $22.000 $39.340 $24.000 $34.470
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 200.000 $135.000 $148.500 $151.750 $162.000 $149.120
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 56,756.000 $0.180 $0.180 $0.510 $0.190 $0.180
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 52,210.000 $0.180 $0.180 $0.510 $0.190 $0.180
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,322.000 $4.000 $3.850 $4.440 $4.200 $3.940
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,546.000 $0.650 $0.940 $0.900 $1.020 $0.960
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 620.000 $0.650 $1.320 $1.240 $1.440 $1.520
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,989.000 $1.900 $2.370 $2.170 $2.400 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 312.000 $1.000 $1.320 $0.970 $1.440 $1.720
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,544.000 $5.950 $8.800 $13.490 $9.600 $8.880
REFL PAV MRK TY II (W) 4" (BRK)
LF 155.000 $0.120 $3.300 $0.340 $3.600 $4.100
REFL PAV MRK TY II (W) 4" (SLD)
LF 162,420.000 $0.120 $0.150 $0.250 $0.170 $0.150
REFL PAV MRK TY II (W) 8" (SLD)
LF 312.000 $0.400 $0.720 $0.490 $0.780 $1.110
REFL PAV MRK TY II (W) 24" (SLD)
LF 1,544.000 $2.500 $5.500 $2.810 $6.000 $8.880
REFL PAV MRK TY II (Y) 4" (BRK)
LF 19,070.000 $0.120 $0.150 $0.250 $0.170 $0.160
REFL PAV MRK TY II (Y) 4" (SLD)
LF 51,257.000 $0.120 $0.150 $0.250 $0.170 $0.160
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 155.000 $0.380 $1.100 $0.480 $1.200 $1.900
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 4,313.000 $0.300 $0.610 $0.480 $0.660 $0.630
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 130.000 $0.300 $1.100 $0.480 $1.200 $2.060
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,492.000 $0.300 $0.610 $0.480 $0.660 $0.630
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 158,107.000 $0.650 $0.830 $0.820 $0.900 $0.830
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 18,940.000 $0.650 $1.050 $0.820 $1.140 $1.050
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 46,765.000 $0.650 $0.940 $0.820 $1.020 $0.940
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $250.000 $275.000 $213.580 $300.000 $337.350
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $265.000 $308.000 $304.630 $336.000 $370.350
REFL PAV MRKR TY I-C
EA 36.000 $5.150 $5.500 $1.740 $6.000 $8.960
REFL PAV MRKR TY II-A-A
EA 1,621.000 $3.340 $3.030 $1.740 $3.300 $3.100
ELIM EXT PAV MRK & MRKS (4")
LF 78,315.000 $0.650 $1.140 $1.010 $0.660 $0.610
FULL - WIDTH MOWING
CYC 2.000 $8,015.000 $9,723.120 $21,076.380 $10,200.000 $16,093.920
LITTER REMOVAL
CYC 2.000 $4,830.000 $9,866.820 $12,645.830 $30,000.000 $14,025.660
PREFORMED CENTERLINE RUMBLE STRIP
LF 4,750.000 $5.390 $6.050 $9.100 $6.600 $6.080
TMA (STATIONARY)
DAY 126.000 $200.000 $379.220 $350.000 $1,920.000 $163.980
TMA (MOBILE OPERATION)
DAY 158.000 $260.000 $494.400 $350.000 $1,140.000 $75.660
TEMP SPEED MONITOR (2 SYS)
DAY 94.000 $100.000 $250.060 $105.000 $300.000 $101.030
Totals: $5,711,543.670 $6,698,938.518 $7,258,299.013 $8,092,530.800 $8,331,892.374