GLASSCOCK SH 158 (0463-04-026)

Items: 58

County: GLASSCOCK
Length: N/A
Highway: SH 158
District: SAN ANGELO
Control Number: 0463-04-026
DBE Goal: N/A
Project: NH 1802(312)
Guaranty: N/A
Time: 217 WORKING DAYS
Engineer's Estimate: $19,682,227.84
Date: 07/11/2018 (7 years ago)
Contract Number: N/A
Type: ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$19,682,227.84
1
$20,119,919.30
Over/Under Est: 2.22% $437,691.46
$21,266,003.25
Over/Under Est: 8.05% $1,583,775.41
Amt Left: 5.7% $1,146,083.95
Over/Under Est: 8.8% $1,732,928.66
Amt Left: 6.44% $1,295,237.20
Delta: -0.70% -$149,153.25
Over/Under Est: 24.18% $4,759,146.30
Amt Left: 21.48% $4,321,454.84
Delta: -14.13% -$3,026,217.64
$26,990,435.23
Over/Under Est: 37.13% $7,308,207.39
Amt Left: 34.15% $6,870,515.93
Delta: -10.43% -$2,549,061.09

Bid Items & Bid Tabulations

58 Total 0 of 58
GLASSCOCK  |  SH 158  |  SAN ANGELO  |  0463-04-026  |  07/11/2018  |  $19,682,227.84  |  NH 1802(312)  |  ACP OVERLAY  |  217 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
REECE ALBERT, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
DELHUR INDUSTRIES, INC.
REMOVING CONC (MEDIANS)
SY 54.000 $18.000 $101.510 $16.840 $75.000 $20.000 $120.000
REMOVING CONCRETE(MOW STRIP)
LF 3,778.000 $10.000 $12.000 $10.790 $10.860 $8.000 $11.000
SUBGRADE WIDENING (ORD COMP)
STA 24.000 $460.000 $1,742.730 $1,953.560 $1,800.000 $1,580.000 $600.000
BACKFILL (TY B)
STA 2,135.600 $200.000 $114.310 $153.900 $100.000 $70.000 $120.000
BACKFILL (TY A OR B)
STA 185.300 $240.000 $141.240 $165.360 $100.000 $73.000 $300.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 4,983.000 $0.250 $0.790 $0.810 $0.320 $0.350 $0.860
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 4,983.000 $5.000 $1.520 $1.560 $2.500 $3.000 $2.750
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,036.000 $42.000 $67.240 $69.100 $30.000 $100.000 $72.000
PRIME COAT (MULTI OPTION)
GAL 466.000 $4.250 $6.240 $6.210 $4.020 $8.000 $6.880
EMULS ASPH (EROSN CONT)(MULTI)
GAL 6,628.000 $4.000 $13.850 $3.530 $2.910 $3.000 $4.130
FOG SEAL (CSS-1H)
GAL 29,711.000 $3.500 $3.070 $3.030 $2.900 $4.000 $4.130
ASPH (MULTI OPTION)
GAL 956.000 $3.000 $4.920 $5.000 $4.480 $6.000 $8.530
AGGR(TY-PD GR-3 SAC-B)
CY 25.000 $100.000 $376.410 $453.020 $540.960 $200.000 $440.000
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 218,658.000 $73.000 $77.320 $82.640 $81.000 $88.750 $104.010
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 5,901.000 $50.000 $59.900 $55.520 $68.320 $70.000 $54.510
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 5,901.000 $20.000 $16.050 $19.450 $19.280 $25.000 $35.200
PLANE ASPH CONC PAV(0" TO 1")
SY 8,049.000 $2.500 $9.910 $2.890 $1.800 $3.890 $2.850
PLANE ASPH CONC PAV (2")
SY 57,729.000 $1.250 $3.010 $2.090 $2.000 $4.760 $2.450
RIPRAP (CONC)(5 IN)
CY 5.000 $550.000 $1,942.330 $886.350 $3,000.000 $8,730.770 $900.000
CMP AR (GAL STL DES 3)
LF 56.000 $80.000 $113.760 $89.880 $75.000 $99.650 $120.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 2.000 $950.000 $2,219.930 $1,901.500 $2,500.000 $1,245.070 $1,800.000
REMOV STR (DRIVEWAY CULVERT)
EA 1.000 $300.000 $1,670.960 $1,284.300 $1,500.000 $1,457.600 $1,200.000
MOBILIZATION
LS 1.000 $1,030,000.000 $199,466.520 $246,344.440 $821,869.000 $1,000,000.000 $963,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $9,000.000 $15,000.000 $9,214.870 $25,000.000 $5,000.000 $35,770.600
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 40.000 $4.000 $12.730 $11.140 $5.820 $6.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 40.000 $4.000 $4.290 $7.900 $16.290 $1.000 $2.400
DRIVEWAYS (SURF TREAT)
SY 240.000 $4.750 $35.540 $30.210 $50.000 $35.000 $36.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 464,858.000 $0.160 $0.090 $0.120 $0.120 $0.300 $0.080
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 229,995.000 $0.180 $0.090 $0.170 $0.170 $0.500 $0.100
MTL W-BEAM GD FEN (STEEL POST)
LF 6,262.500 $25.000 $23.890 $27.520 $27.700 $21.000 $28.050
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,200.000 $1,102.500 $1,133.140 $1,140.620 $300.000 $1,155.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,500.000 $1,155.000 $1,187.100 $1,194.930 $2,500.000 $1,210.000
REMOVE METAL BEAM GUARD FENCE
LF 2,635.000 $3.000 $2.100 $2.160 $2.170 $4.000 $2.200
GUARDRAIL END TREATMENT (INSTALL)
EA 42.000 $2,500.000 $2,782.500 $2,994.730 $3,014.480 $2,500.000 $3,052.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 336.000 $30.000 $31.500 $21.580 $21.730 $25.000 $22.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 37,365.000 $1.500 $1.820 $1.630 $2.170 $1.000 $1.660
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 50,056.000 $1.500 $1.310 $1.660 $2.170 $1.000 $1.700
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,879.000 $1.000 $0.550 $0.760 $0.560 $0.650 $0.570
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
LF 1,254.000 $1.000 $0.550 $0.760 $0.560 $0.650 $0.570
REFL PAV MRK TY II (W) 8" (SLD)
LF 4,879.000 $0.200 $0.270 $0.380 $0.280 $1.000 $0.290
REFL PAV MRK TY II (Y) 8" (SLD)
LF 1,254.000 $0.200 $0.270 $0.270 $0.280 $1.000 $0.290
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 116,560.000 $0.260 $0.270 $0.320 $0.280 $0.450 $0.290
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 466,147.000 $0.260 $0.270 $0.300 $0.280 $0.450 $0.290
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 764,304.000 $0.260 $0.270 $0.290 $0.280 $0.450 $0.290
RE PM W/RET REQ TY II (W) 4" (BRK)
LF 116,280.000 $0.150 $0.130 $0.140 $0.130 $0.450 $0.130
RE PM W/RET REQ TY II (W) 4" (SLD)
LF 472,614.000 $0.100 $0.130 $0.120 $0.130 $0.450 $0.130
RE PM W/RET REQ TY II (Y) 4" (SLD)
LF 762,111.000 $0.100 $0.130 $0.120 $0.130 $0.450 $0.130
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $240.000 $420.000 $237.420 $434.520 $200.000 $440.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $275.000 $603.750 $269.800 $624.620 $250.000 $632.500
REFL PAV MRKR TY I-A
EA 62.000 $3.000 $3.150 $3.780 $3.260 $4.000 $3.300
REFL PAV MRKR TY I-C
EA 6,005.000 $3.000 $3.050 $2.700 $3.150 $4.000 $3.190
REFL PAV MRKR TY II-A-A
EA 12,195.000 $3.000 $3.050 $2.700 $3.150 $4.000 $3.190
REFL PAV MRKR TY II-C-R
EA 62.000 $3.000 $3.150 $3.780 $3.260 $4.000 $3.300
FULL - WIDTH MOWING
CYC 6.000 $8,000.000 $20,252.460 $25,285.270 $3,000.000 $12,000.000 $18,000.000
LITTER REMOVAL
CYC 6.000 $8,000.000 $14,697.130 $14,601.350 $2,000.000 $12,000.000 $12,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 736.000 $95.000 $100.950 $41.550 $53.130 $165.000 $90.000
TMA (STATIONARY)
DAY 368.000 $180.000 $117.660 $241.260 $175.940 $800.000 $26.400
TMA (MOBILE OPERATION)
HR 380.000 $20.000 $67.490 $56.120 $62.350 $200.000 $108.000
Totals: $19,682,227.840 $20,119,919.313 $21,266,003.258 $21,415,156.500 $24,441,374.140 $26,990,435.235